Loading…
Loading…
Structured register of government actions in the geoeconomic space — export controls, tariffs, sanctions, FDI screening, subsidies, industrial-policy laws — cross-referenced into the country, minerals, and ETF surface. Charter: docs/IPTM_CHARTER.md.
Severity 1-5 is the qualitative impact rating (1=minor, 5=structural). The bilateral-trade-grounded quant scorer is the next IPTM milestone. RBI (Register Breadth Index) is a complementary structural-breadth indicator from scripts/py/iptm/breadth.py; divergence between RBI and severity is itself informative (high-sev / low-RBI = strategic chokepoint; low-sev / high-RBI = broad but shallow). Every action has at least one primary source URL. Verify-or-don't-file. See also themes, timeline, graph, sankey, map, country exposure, sector exposure, material exposure (+ graph), weekly briefs, portfolio scan, escalation monitor, trans-shipment hubs. Internal triage tools (RSS-poller candidate feed, source-feed health) live under /admin/candidates + /admin/sources. Subscribe via Atom feed (accepts ?country=CN, ?material=lithium, ?issuer=BIS, ?type=export_control, ?etf=SOXX, ?company=NVDA, ?minSeverity=4, ?year=2026, ?q=…) or pull /api/iptm/actions.
President Daniel Noboa signed Executive Decree 273 on 31 December 2025 (effective 1 January 2026), the most significant overhaul of Ecuador's mining regulation since the 2009 Mining Code. The decree amends the Reglamento General a la Ley de Minería to (i) replace the fixed 3–8% royalty range with a price-indexed sliding scale tied to a trailing three-year LME reference price, (ii) require all mining projects to supply 100% of their electricity needs (no grid draw), (iii) tighten exploration-phase timelines and introduce automatic extinction of concessions where activities do not begin in time, (iv) modify royalty-deduction rules so gold/silver royalties are computed on gross revenue without deductions while small/medium operators of other metals can still deduct refining/transport/benefit costs, and (v) allocate 60% of mining royalties to social projects via decentralised governments (45% provincial, 35% municipal, 20% parochial). The decree was published in Registro Oficial Suplemento 195 of 31 December 2025 and is not retroactive.
On 30 December 2025, the Estonian Centre for Defence Investments (RKIK), an agency under the Ministry of Defence, signed framework agreements with four companies to build production facilities at the Ermistu Defence Industrial Park in Pärnumaa county. The state commits more than €50 million in core site infrastructure (access roads, electricity grid connections, water/wastewater, perimeter security); the four selected companies are expected to match that with comparable private investment in their own production buildings. Commercial production at all four facilities is scheduled to begin in 2027, establishing Estonia's first domestically-produced ammunition, explosive-charge, short-range air-defence missile, and plastic-explosives capacity in nearly a century.
The Mexican federal government published the Programa Sectorial de Energía 2025-2030 (PMSE) in the Diario Oficial de la Federación on 22 December 2025, establishing a binding five-year state-led energy-planning mandate for the Sheinbaum administration (2024-2030). The PMSE mandates a 54-46 state-to-private electricity generation mix, sets a 35 GW new clean-generation target by 2030 (13.6 GW from CFE + 22 GW from private/state/community projects), and formally supersedes the prior market-led Estrategia Nacional de Energía 2018-2032 and PRODESEN architecture. The Program is legally mandatory for all federal public administration entities including CFE, PEMEX, CENACE, and CENAGAS, operationalising the 2024 constitutional reform that restored CFE and PEMEX to strategic-sector status under Articles 27 and 28 of the Constitution.
On 19 December 2025 the Swiss Federal Assembly adopted in final vote the Federal Act on the Screening of Foreign Investments (Bundesgesetz über die Prüfung ausländischer Investitionen, Investitionsprüfgesetz / IPG; popularly the "Lex China", parliamentary business 22.035). The Act introduces Switzerland's first general ex-ante FDI-screening regime: acquisitions of control over Swiss companies active in security-critical sectors by foreign state-controlled investors require prior approval by SECO, with escalation to the Federal Council. The optional- referendum window runs until 17 April 2026; entry into force is not expected before 2027 once implementing ordinances are adopted. Critical sectors named in the Act include military and dual-use goods, electricity grids and generation, water supply, pharma and health, telecommunications, transport infrastructure and financial-market infrastructure.
The Ivorian Council of Ministers adopted on 3 December 2025 the Politique Intégrée des Ressources Minérales et de l'Énergie (PIRME), a 15-year cross-sector extractive and energy industrial-policy strategy requiring CFA 38,000 billion (~USD 68bn) across three five-year phases to 2040. The policy targets doubling the mining-energy sector's GDP contribution from 7% (2022) to 14% by 2040, positioning it as the economy's second pillar after agriculture. Core mandates include a 50% local transformation target for gold, a 10 million-tonne iron-ore production target, a 500,000 bbl/day oil production target, 45% renewable energy integration, and a 38% reduction in energy-sector emissions — backed by national-content and value-addition requirements across mining, hydrocarbons, and electricity sub-sectors.
The US Department of Energy selected the Tennessee Valley Authority (TVA) and Holtec Government Services to receive up to $800 million in combined federal cost-shared funding — $400 million each — to accelerate deployment of advanced light-water small modular reactors (SMRs). TVA's award backs a GE Vernova Hitachi BWRX-300 unit at the Clinch River site in Oak Ridge, Tennessee, targeted to be the nation's first commercial SMR (commercial operation targeted early 2030s), with domestic supply-chain partners Scot Forge, North American Forgemasters, BWX Technologies and Aecon. Holtec's award backs deployment of two SMR-300 units at the Palisades Nuclear Generating Station site in Covert, Michigan. The program is intended to expand US SMR manufacturing capacity and seed follow-on domestic and export supply chains.
Mozambique's Council of Ministers, at its 39th Ordinary Session on 18 November 2025, approved the terms and conditions of a concession contract granting a state-company consortium the exclusive right to finance, construct, import, and operate (i) a floating storage and regasification unit (FSRU) LNG terminal at Beira and Inhassoro (Inhambane province), and (ii) the 865-km ROMPCO gas pipeline connecting Mozambican gas fields to South Africa via Komatipoort — both for a 30-year concession term. The concessionaire is a Specific Object Entity (Entidade de Objecto Específico, EOE) constituted by four state enterprises — the National Hydrocarbon Company (ENH, E.P.), Mozambique Ports & Railways (CFM), Mozambique Electricity (EDM), and Cahora Bassa Hydroelectric (HCB) — plus government-selected technical and financial partners. The decree marks the first midstream LNG infrastructure-rights award in Mozambique and represents a foundational shift toward state-led control of the country's regasification and cross-border pipeline architecture rather than concession to international IOCs.
The UK government confirmed Wylfa on Anglesey, North Wales as the site for the country's first government-backed small modular reactor (SMR) power station, committing over GBP 2.5 billion (~USD 3.3bn) to the programme via state-owned developer Great British Energy – Nuclear (GBE-N). GBE-N named Rolls-Royce SMR as preferred bidder, with an initial three-reactor deployment (scope for five more) targeting grid connection by the mid-2030s and up to 1.5GW of capacity — enough to power roughly three million homes. Site work is set to begin in 2026, subject to final government approvals and contract signature.
The Texas Energy Fund (TxEF), administered by the Public Utility Commission of Texas (PUCT), finalized a USD 1.12 billion low-interest (3%) 20-year state loan to Competitive Power Ventures (CPV) to fund 60% of the USD 1.88 billion cost of the CPV Basin Ranch Energy Center, a 1,350 MW combined-cycle natural-gas plant in Ward County (Permian Basin), Texas. The loan term runs 28 October 2025 to 28 October 2045; the plant is expected online in 2029 in the ERCOT West Load Zone and is explicitly framed by the state as capacity to serve West Texas AI/data-center electricity demand. This is the fifth loan finalized under TxEF's In-ERCOT Generation Loan Program and the largest single project financed under it to date, taking cumulative TxEF-backed capacity above 3,100 MW.
On 23 October 2025, Canada's federal Canada Growth Fund (CGF) and the Government of Ontario's Building Ontario Fund (BOF) announced an equity commitment agreement to finance the Darlington New Nuclear Project (DNNP) small modular reactor (SMR) build, led by Ontario Power Generation (OPG). CGF committed up to CAD 2 billion (USD 1.43bn) for a 15% minority stake and BOF committed up to CAD 1 billion (USD 713.5m) for a 7.5% minority stake, with OPG remaining majority owner and operator. The combined CAD 3 billion package funds construction of four grid-scale SMRs — the first commercial SMR deployment among G7 nations — targeting first-unit grid connection by end-2030.
On 18 September 2025, the Australian Government published the Net Zero Plan 2050 and six sectoral emissions-reduction plans covering Electricity & Energy, Industry, Transport, Built Environment, Agriculture & Land, and Resources. The Net Zero Plan establishes the overarching policy architecture to achieve Australia's 62–70% emissions-reduction target (below 2005 levels) by 2035 and net zero by 2050, structured around five "CLEAN" strategic priorities. The six sector plans provide detailed decarbonisation pathways, capex envelopes, and policy-instrument linkages that frame operation of the Future Made in Australia Act, the Critical Minerals Production Tax Incentive, the Capacity Investment Scheme, and the Safeguard Mechanism for the following decade. The plans were released simultaneously with Australia's updated 2035 Nationally Determined Contribution submitted to the UNFCCC.
H.R.1, the "One Big Beautiful Bill Act" (Public Law 119-21), was signed into law by President Trump on 4 July 2025. The budget-reconciliation statute is the single largest reversal of the 2022 Inflation Reduction Act (IRA) industrial-policy framework: it accelerates the termination of IRA-era clean- energy tax credits and overlays a new "Foreign Entity of Concern" (FEOC) / "Prohibited Foreign Entity" (PFE) regime on the credits that survive. The §25E used-EV credit, the §30D new clean-vehicle credit, the §45W commercial clean-vehicle credit, and the §30C alternative-fuel-refueling-property credit terminate for vehicles or property placed in service after 30 September 2025. The §25C energy-efficient home improvement credit and the §25D residential clean-energy credit terminate for property placed in service after 31 December 2025. The §45Y clean-electricity production credit and §48E clean-electricity investment credit are eliminated for wind and solar facilities placed in service after 31 December 2027, with a safe harbour for projects whose construction begins on or before 4 July 2026. From 1 January 2026, projects beginning construction must satisfy "material assistance" thresholds limiting the share of components, subcomponents and critical minerals sourced from prohibited foreign entities (PRC, Russia, Iran, DPRK and entities controlled by them). For §45Y/§48E facilities the threshold starts at 40% non-PFE content in 2026 and steps up by 5 percentage points per year through 2030; for §45X advanced manufacturing PTC the analogous schedule begins at 50% in 2026 and rises through the decade. CBO scored the package's energy-credit terminations as generating roughly USD 280bn of revenue (gross), of which USD 77.4bn from §25D termination, USD 21.2bn from §25C, USD 77.8bn from §30D, USD 104.5bn from §45W, and USD 2bn from §30C, partially offsetting the bill's other tax cuts. The bill simultaneously re-authorises and broadens the §48D advanced manufacturing investment tax credit for semiconductor fabs, raising the credit rate from 25% to 35% for property placed in service after 31 December 2025 (preserving the CHIPS Act-aligned semiconductor leg of the IRA-era stack). The OBBBA therefore reshapes the IRA from a broad-based clean-energy + EV + manufacturing pull-through into a narrower, China-decoupling industrial policy concentrated on semiconductors and (residually) §45X battery / critical- mineral processing.
South African Cabinet on 25 June 2025 approved a three-part package to revitalise the domestic ferrochrome sector: (i) placement of chrome ore under export control via the International Trade Administration Commission (ITAC) under the International Trade Administration Act 71 of 2002, requiring an export permit prior to dispatch; (ii) initiation of work on a chrome ore export tax (rate not finalised; market reporting cites 25%); (iii) expanded SEZ incentives for ferrochrome smelters and a negotiated electricity- tariff relief mechanism. The DTIC notice formally placing chrome ore under export control was published in Government Gazette No. 53477 General Notice 6712 on 3 October 2025 with a 30-day public-comment window closing 31 October 2025; the final permit regime takes effect upon subsequent ministerial gazette notice. South Africa accounts for >70% of seaborne chrome ore exports, so the regime is globally material to stainless-steel supply chains.
On 19 June 2025 the Council of Ministers of Niger, presided over by the head of the CNSP transition government, adopted a draft ordonnance nationalising the Société des Mines de l'Aïr (SOMAÏR SA), the joint venture that operates Niger's only currently producing uranium mine at Arlit. The communiqué transfers all SOMAÏR shares and assets to the Nigerien State and provides for compensation to existing shareholders net of legal obligations including mining-site rehabilitation costs. SOMAÏR was 63.40% owned by Orano (the French state-controlled nuclear fuel-cycle company, ex-AREVA) and 36.60% by state-owned SOPAMIN; the government cited "irresponsible, illegal and disloyal" conduct by Orano, the expiry of the prior mining convention on 31 December 2023, and a finding that Orano had taken 86.3% of cumulative production between 1971 and 2024 versus its 63.4% shareholding. The same Council of Ministers also nationalised the electricity utility NIGELEC. Orano announced the same day that it would seek full compensation through arbitration and reserved criminal-action rights against third parties acquiring SOMAÏR uranium stock.
On 16 June 2025 the European Investment Bank (EIB) signed a EUR 1.6 billion loan facility with French and Spanish transmission-system operators RTE and Red Eléctrica to finance the Bay of Biscay electricity interconnection, the first submarine power link between the two countries. First tranches totalling EUR 1.2 billion were signed at EIB headquarters in Luxembourg; the project separately holds a EUR 578 million EU Connecting Europe Facility (CEF) grant. The 400 km link (300 km submarine, connecting Cubnezais, France to Gatika, Spain) will raise cross-border exchange capacity from 2,800 MW to 5,000 MW and is expected to enter service in 2028.
The UK's state-owned National Wealth Fund (NWF) provided a £600 million loan to ScottishPower (a subsidiary of Spain's Iberdrola) as part of a wider £1.35 billion financing package arranged by Bank of America and a syndicate of commercial banks. The financing accelerates capital deployment for seven of ScottishPower's priority transmission-network upgrade projects, including the Eastern Green Link 1 (EGL1) subsea interconnector and substation/overhead-line reinforcement work at five locations across Scotland. The projects aim to reduce grid congestion, connect more renewable generation, and lower system costs for consumers.
Tamil Nadu Chief Minister M K Stalin launched the Tamil Nadu Electronics Components Manufacturing Scheme (TN-ECMS) on 30 April 2025, making Tamil Nadu the first Indian state to introduce a dedicated state-level electronics components manufacturing subsidy designed to stack on top of the central Electronics Components Manufacturing Scheme (ECMS, notified April 2025). The scheme targets ₹30,000 crore (~USD 3.6 bn) in investment and 60,000 jobs over three to five years, supporting 11 high-growth component categories including HDI/MSAP printed circuit boards, lithium-ion cells, display assemblies, camera modules, SMD passive components, multilayer ceramic capacitors, copper-clad laminates, and capital goods for electronics manufacturing. Investment thresholds are ₹50 crore for basic components and up to ₹250 crore for complex sub-assemblies; matching grants mirror the central ECMS subsidy structure with additional state concessions on stamp duty, land, and electricity costs plus workforce-development incentives.
Hydrom launched Round 3 of Oman's green hydrogen land auction on 30 April 2025, offering a flexible Duqm land block of up to 300 km² with a minimum project footprint of 100 km². A 9-month preparation window runs from the RFQ release (30 April 2025) to proposal submission in early 2026, with project awards to follow. Developers may explore selling surplus renewable electricity to the national grid, and will access the planned 2,000-km hydrogen pipeline and a liquid hydrogen export corridor linking Duqm to the Netherlands and Germany. Round 3 is an implementing-auction instrument within the umbrella 2024 Oman Green Hydrogen Strategy; the two prior rounds have already secured USD 49 bn in investment commitments and more than 1 Mtpa of green hydrogen production capacity by 2030 from more than 30 GW of dedicated renewables.
France updated its 2020 National Low-Carbon Hydrogen Strategy at the Comité interministériel de l'Innovation on 10 April 2025, releasing SNH II under the direction of the Prime Minister and Industry Minister Marc Ferracci. The 2025 actualisation revises capacity targets to 6.5 GW of low-carbon hydrogen production by 2030 and 10 GW by 2035, funded within the France 2030 plan's €9 billion hydrogen envelope (€4 bn for electrolysers, €1.5 bn for end-uses, €2 bn for IPCEI Hy2Tech/Hy2Use French share). A new €4 billion price-support mechanism guarantees low-carbon hydrogen competitiveness against fossil hydrogen for 15 years; the strategy aligns France's "décarboné" taxonomy to include both nuclear-electricity-based and renewable-electricity-based hydrogen, distinct from EU RFNBO additionality rules.
Japan's Cabinet approved an amendment to the Cabinet Order on Inward Direct Investment under the Foreign Exchange and Foreign Trade Act (FEFTA) on 1 April 2025; the order was promulgated 4 April 2025 and entered into force 19 May 2025. The amendment introduces two new investor categories — Type-A (investors legally or contractually obligated to share information with foreign governments) and Type-B (investors effectively in a comparable position without formal legal obligation) — and eliminates or narrows exemptions from mandatory prior-notification screening for both categories. The primary driver is concern over minority-stake acquisitions by Chinese investors in Japanese listed companies operating in sensitive sectors including cloud computing, telecommunications infrastructure, semiconductor equipment, and advanced electronics. The reform is structurally distinct from the outbound FEFTA catch-all controls overhaul (2025-10-09) and from the Economic Security Promotion Act (2022-05-18); it is the inbound FDI-screening complement to that framework.
South Korea's National Assembly passed the Special Act on the Expansion of the National Electricity Network (Law No. 20844) on 19 February 2025 as part of the bipartisan "Energy Trifecta Bill," with promulgation on 25 March 2025 and entry into force on 26 September 2025. The act creates an expedited siting, permitting, and compensation framework for trunk transmission-grid construction, consolidating 35 previously separate regulatory approvals into a single streamlined procedure and targeting a >30% reduction in grid-build timelines. It directly addresses the electricity-infrastructure bottleneck constraining semiconductor fab clusters (Yongin, Pyeongtaek, SK Hynix HBM), sovereign AI datacenter build-out, and EV/battery gigafactory load growth — structurally distinct from the K-Chips Act (fiscal incentives) and the Semiconductor Special Act (regulatory framework), as it unblocks the physical power-delivery constraint those programmes depend on.
The Government of Karnataka, Department of Industries and Commerce, notified the Karnataka Industrial Policy 2025-30 in the Karnataka Gazette on 11 February 2025, with the policy taking legal effect from 8 February 2025 and valid for five years (or until superseded). It supersedes the prior Karnataka Industrial Policy 2020-25. The umbrella state-level framework targets ₹7.5 lakh crore (~USD 90 bn) in fresh investment and 20 lakh (2 million) new jobs by 2030, positioning Karnataka as a top-Asia destination for high-technology manufacturing — semiconductors, EVs, aerospace, defence, biotech, medical devices, textiles and renewable energy. It introduces zone-based incentive categorisation (Zone 1/2/3 district classification), capital subsidies, stamp-duty exemption, electricity-tax exemption, interest subsidy, ESDM-specific top-up incentives that layer onto central PLI/ECMS/Semicon Mission schemes, and a Cabinet Sub-Committee under the Chief Minister to sanction bespoke "Anchor Investor" and "Mega/Ultra-Mega" customised incentive packages.
The US Treasury and IRS published the final regulations implementing §45V of the Inflation Reduction Act, establishing the Clean Hydrogen Production Tax Credit. The rule codifies the 45VH2-GREET lifecycle-emissions methodology and three electricity-sourcing pillars — additionality (new-build requirement within 36 months), temporal matching (annual until 2030, then hourly), and deliverability (same grid-balancing region) — that determine credit eligibility for electrolytic pathways. Credits range from $0.60/kg (2.5–4.0 kg CO₂e/kg H₂) to $3.00/kg (below 0.45 kg CO₂e/kg H₂), representing the primary US hydrogen industrial-policy instrument for the 2025–2034 cycle and the global benchmark for green-hydrogen additionality rules.