Loading…
Loading…
Structured register of government actions in the geoeconomic space — export controls, tariffs, sanctions, FDI screening, subsidies, industrial-policy laws — cross-referenced into the country, minerals, and ETF surface. Charter: docs/IPTM_CHARTER.md.
Severity 1-5 is the qualitative impact rating (1=minor, 5=structural). The bilateral-trade-grounded quant scorer is the next IPTM milestone. RBI (Register Breadth Index) is a complementary structural-breadth indicator from scripts/py/iptm/breadth.py; divergence between RBI and severity is itself informative (high-sev / low-RBI = strategic chokepoint; low-sev / high-RBI = broad but shallow). Every action has at least one primary source URL. Verify-or-don't-file. See also themes, timeline, graph, sankey, map, country exposure, sector exposure, material exposure (+ graph), weekly briefs, portfolio scan, escalation monitor, trans-shipment hubs. Internal triage tools (RSS-poller candidate feed, source-feed health) live under /admin/candidates + /admin/sources. Subscribe via Atom feed (accepts ?country=CN, ?material=lithium, ?issuer=BIS, ?type=export_control, ?etf=SOXX, ?company=NVDA, ?minSeverity=4, ?year=2026, ?q=…) or pull /api/iptm/actions.
On 21 August 2026 Niger's Council of Ministers, under the presidency of General Abdourahamane Tiani, awarded two large-scale uranium exploitation permits. The In Azaoua perimeter (Arlit Commune, Agadez Region) — the ground previously worked by the Orano-majority Société des Mines de l'Aïr (SOMAÏR), nationalised June 2025 — was granted to TSUMCO SA (Teloua Safeguarding Uranium Mining Company), the wholly state-owned successor operator created in May 2026. The Madaouela I permit (Arlit Urban Commune), previously held by Canada's GoviEx Uranium before reverting to the public domain on 31 July 2024, was re-attributed to Madaouela Mining Company (MAMICO), now 60%-held by Australia's Atomic Eagle (GoviEx's restructured successor) and 40% by the Nigerien State — up from a prior minority state stake. MAMICO paid a $10 million redevance forfaitaire to the state and committed to roughly 1,000 local jobs and local-content procurement.
The US Department of Energy announced $2.7 billion in task-order funding over ten years to rebuild domestic uranium enrichment capacity: $900 million each to American Centrifuge Operating and General Matter to develop high-assay low-enriched uranium (HALEU) enrichment capacity, $900 million to Orano Federal Services to expand low-enriched uranium (LEU) enrichment capacity, and $28 million to Global Laser Enrichment for next-generation enrichment technology. DOE frames the awards as reducing US reliance on foreign — chiefly Russian — enriched uranium supply and securing fuel for the country's 94 commercial reactors and future advanced-reactor deployment, with funds distributed under a milestone-based accountability framework.
On 26 December 2025 the President of Kazakhstan signed a law amending the Code "On Subsoil and Subsoil Use" with respect to the hydrocarbon and uranium sectors, followed on 30 December 2025 by a parallel set of amendments implementing presidential instructions on broader subsoil-use governance. Both packages take effect on 2 March 2026. The uranium amendments grant the National Atomic Company Kazatomprom (KAP) a statutory priority right to obtain exploration licences over prospective uranium areas listed in the State Subsoil Fund Management Programme, and to reserve blocks containing uranium mineralisation or deposits. Where uranium mineralisation is discovered on a solid-mineral block held by a third-party subsoil-user, an extension of that licence is conditional on the licensee surrendering the uranium-bearing block to the State; private subsoil-users no longer obtain priority production rights for uranium they discover. The amendments also raise the minimum direct or indirect Kazatomprom interest in any uranium mining project from 50% to 75%, and permit subsequent transfer to investors or joint-venture partners only subject to that 75% floor. The 30 December 2025 package establishes the National Geological Service as a non-privatisable national operator subordinate to the authorised subsoil-exploration agency and as the operator responsible for managing geological information; it also creates a Unified Subsoil Use Platform digital infrastructure (open geological-information database integrated with the Unified State System for Management of the Fuel and Energy Complex). The hydrocarbon track of the law shortens block-reservation periods and pushes unallocated plots into electronic-auction allocation to accelerate competitive exploration. The amendments accompany an announced USD 500m state geological-exploration programme.
On 18 November 2025, during Saudi Crown Prince Mohammed bin Salman's White House visit (17-19 November 2025), the United States and the Kingdom of Saudi Arabia signed a Strategic Framework for Cooperation on Securing Uranium, Metals, Permanent Magnets, and Critical Minerals Supply Chains. The framework was signed by US Secretary of the Interior Doug Burgum and Saudi Minister of Energy H.R.H. Prince Abdulaziz bin Salman, and positions Saudi Arabia (via Ma'aden + Public Investment Fund vehicles) as a regional hub for processing rare earths and producing permanent magnets, supports a US-backed rare-earths refinery in the Kingdom, and channels Saudi capital — alongside the broader USD ~1 trillion Saudi investment commitment in the US announced the same week — into US and allied critical-mineral projects. It is paired with a separate joint declaration on civil nuclear cooperation (Section 123 Agreement contemplated) and was operationalised one day later by the 19 November 2025 binding term sheet between MP Materials, the US Department of War, and Ma'aden to develop a rare-earth refinery in Saudi Arabia (Department of War financing the US side's 49% stake; Ma'aden retaining ≥51%).
On 19 June 2025 the Council of Ministers of Niger, presided over by the head of the CNSP transition government, adopted a draft ordonnance nationalising the Société des Mines de l'Aïr (SOMAÏR SA), the joint venture that operates Niger's only currently producing uranium mine at Arlit. The communiqué transfers all SOMAÏR shares and assets to the Nigerien State and provides for compensation to existing shareholders net of legal obligations including mining-site rehabilitation costs. SOMAÏR was 63.40% owned by Orano (the French state-controlled nuclear fuel-cycle company, ex-AREVA) and 36.60% by state-owned SOPAMIN; the government cited "irresponsible, illegal and disloyal" conduct by Orano, the expiry of the prior mining convention on 31 December 2023, and a finding that Orano had taken 86.3% of cumulative production between 1971 and 2024 versus its 63.4% shareholding. The same Council of Ministers also nationalised the electricity utility NIGELEC. Orano announced the same day that it would seek full compensation through arbitration and reserved criminal-action rights against third parties acquiring SOMAÏR uranium stock.
On 20–21 June 2024 Niger's Ministry of Mines, acting under the CNSP military-transition government, formally notified the Director General of Imouraren SA (the Orano subsidiary holding the Imouraren uranium permit) that the perimeter of the "IMOURAREN Permit" returned to the public domain of Niger and was freed of all derived rights, in application of articles 59 and 61 of Ordinance no. 93-16 of 2 March 1993 (Niger Mining Law). The decision followed a 7 June 2024 ministerial "note d'information" giving Orano until 19 June to engage development works under the earlier 19 March 2024 mise en demeure, and the Ministry's finding that Orano's 26 April 2024 exploitation plan "did not meet our expectations". Imouraren is one of the world's largest known uranium deposits at ~200,000 t U (Orano-disclosed reserves, originally permitted to AREVA in January 2009 with mine-build paused after the 2011 Fukushima uranium-price collapse). Orano had held 63.4% of Imouraren SA against 36.6% by Niger state-owned Sopamin. Orano notified the public on 20 June 2024 that it took note of the decision, and on 4 December 2024 initiated ICSID arbitration against the Niger state contesting the revocation. The action is the first leg of the 2024–2025 Niger-Orano break (followed by the December 2024 announcement of loss of operational control over Somaïr / Cominak / Imouraren and the June 2025 Somaïr nationalisation announcement).
On 27 December 2017 President Nursultan Nazarbayev signed Code No. 125-VI ZRK "On Subsoil and Subsoil Use," a wholesale recodification replacing the 2010 Subsoil Use Law that entered into force on 29 June 2018 (with certain provisions deferred to 1 January 2019). The Code establishes the licensing architecture for all mineral extraction in Kazakhstan — the world's leading uranium producer (~40% of global U₃O₈ output, ~22,000 tU/yr) and a top-11 oil exporter (~1.8 mbpd) — covering solid minerals, hydrocarbons, and uranium under a single codified framework. For solid minerals the Code introduces a liberalised "first-come first-served" auction-free licence model for non-strategic deposits and a state-tender model for strategic deposits, alongside subsoil-use rights transfer and pledge provisions governing all M&A in the sector. For uranium the Code codifies the National Atomic Company Kazatomprom's statutory role as state operator over all uranium blocks, with government priority pre-emption rights and mandatory Kazatomprom participation in all production licences. For hydrocarbons the Code establishes the concession and production-sharing framework governing the pre-salt Caspian mega-projects (Tengiz, Karachaganak, Kashagan) and the model contract architecture for petroleum products. Horizontal obligations — local Kazakh-content procurement floors, social-package requirements, and environmental-restoration mine-closure security — apply across all subsoil-use categories. Structurally this Code is the parent statute for every subsequently filed KZ action: the 2023-12-28 REE Comprehensive Plan and the 2025-12-26 Kazatomprom uranium-priority amendments both operate under delegated authority created by this Code.