Loading…
Loading…
Structured register of government actions in the geoeconomic space — export controls, tariffs, sanctions, FDI screening, subsidies, industrial-policy laws — cross-referenced into the country, minerals, and ETF surface. Charter: docs/IPTM_CHARTER.md.
Severity 1-5 is the qualitative impact rating (1=minor, 5=structural). The bilateral-trade-grounded quant scorer is the next IPTM milestone. RBI (Register Breadth Index) is a complementary structural-breadth indicator from scripts/py/iptm/breadth.py; divergence between RBI and severity is itself informative (high-sev / low-RBI = strategic chokepoint; low-sev / high-RBI = broad but shallow). Every action has at least one primary source URL. Verify-or-don't-file. See also themes, timeline, graph, sankey, map, country exposure, sector exposure, material exposure (+ graph), weekly briefs, portfolio scan, escalation monitor, trans-shipment hubs. Internal triage tools (RSS-poller candidate feed, source-feed health) live under /admin/candidates + /admin/sources. Subscribe via Atom feed (accepts ?country=CN, ?material=lithium, ?issuer=BIS, ?type=export_control, ?etf=SOXX, ?company=NVDA, ?minSeverity=4, ?year=2026, ?q=…) or pull /api/iptm/actions.
Brazil's national development bank BNDES approved BRL 9.2 billion (~USD 1.7 billion) in project financing for EPR Iguaçu S.A., the concessionaire operating Lote 6 of the Rodovias Integradas do Paraná federal highway concession, to duplicate 462.4km and carry out improvement works across 662km of highways (BR-163, BR-277, PR-158, PR-180, PR-182, PR-280, PR-483) in western and southwestern Paraná, including two new urban bypasses and three bridges (Tancredo Neves, da Amizade, and a new Brazil-Paraguay crossing). The financing was structured as project finance limited recourse — BRL 8.6 billion via a BNDES-coordinated incentivized-debenture issuance (the largest of 2025) plus a BRL 605 million Finem loan — against a total EPR Iguaçu project cost of BRL 12.7 billion through 2034. BNDES President Aloizio Mercadante framed the project as the bank's second-largest-ever national highway financing (after the Rodovia Presidente Dutra) and cited improved export-corridor access to the Port of Paranaguá for Paraná and southern Mato Grosso do Sul agricultural output.
UK Export Finance (UKEF) disclosed a Category B environmental review for a buyer-side financing facility with a maximum liability of approximately GBP 573 million (~USD 768m) supporting Angola's Ministry of Finance in procuring critical infrastructure rehabilitation across Benguela province. The facility, arranged by Standard Chartered Bank, finances a contract between Angola's Ministry of Public Works and Spatial Planning and UK exporter Innovo Projects Limited covering 22 sub-projects: water supply, drainage and flood-risk management, road rehabilitation and pedestrian crossings, restoration of historic buildings, and community facilities including marketplaces and beachfront areas.
The Indiana Economic Development Corporation approved up to USD 18.3 million in EDGE (Economic Development for a Growing Economy) payroll-based tax credits for Amazon Data Services Inc., tied to Amazon Web Services' USD 11 billion data center campus at the Indiana Enterprise Center in New Carlisle, St. Joseph County. The credit was one component of a larger state incentive package announced by Governor Eric Holcomb on 2024-04-25, which also included up to USD 55 million in Hoosier Business Investment tax credits, up to USD 20 million in redevelopment tax credits, up to USD 5 million in training grants, a USD 7 million road-infrastructure contribution, and a 50-year state sales-tax exemption on data center equipment. IEDC records cite an incentive-agreement effective date of 2023-09-01. The project committed to creating at least 1,000 new jobs.
The Indiana Economic Development Corporation approved up to USD 55 million in Hoosier Business Investment (HBI) tax credits for Amazon Data Services Inc., tied to Amazon Web Services' USD 11 billion data center campus at the Indiana Enterprise Center in New Carlisle, St. Joseph County. This is the largest single instrument in the five-part state incentive package Governor Eric Holcomb announced on 2024-04-25, which also included up to USD 18.3 million in EDGE payroll tax credits, up to USD 20 million in redevelopment tax credits, up to USD 5 million in training grants, a USD 7 million road-infrastructure contribution, and a 50-year state sales-tax exemption on data center equipment. IEDC describes all incentives as performance-based, claimable only once the underlying investment and job-creation commitments are verified. IEDC records cite an incentive-agreement effective date of 2023-09-01.
The Indiana Economic Development Corporation approved up to USD 20 million in redevelopment tax credits for Amazon Data Services Inc., tied to Amazon Web Services' USD 11 billion data center campus at the Indiana Enterprise Center in New Carlisle, St. Joseph County. This is the third of five distinct incentive instruments in the state package Governor Eric Holcomb announced on 2024-04-25, alongside up to USD 18.3 million in EDGE payroll tax credits, up to USD 55 million in Hoosier Business Investment tax credits, up to USD 5 million in training grants, a USD 7 million road-infrastructure contribution, and a 50-year state sales-tax exemption on data center equipment. IEDC records cite an incentive-agreement effective date of 2023-09-01.