Loading…
Loading…
Structured register of government actions in the geoeconomic space — export controls, tariffs, sanctions, FDI screening, subsidies, industrial-policy laws — cross-referenced into the country, minerals, and ETF surface. Charter: docs/IPTM_CHARTER.md.
Severity 1-5 is the qualitative impact rating (1=minor, 5=structural). The bilateral-trade-grounded quant scorer is the next IPTM milestone. RBI (Register Breadth Index) is a complementary structural-breadth indicator from scripts/py/iptm/breadth.py; divergence between RBI and severity is itself informative (high-sev / low-RBI = strategic chokepoint; low-sev / high-RBI = broad but shallow). Every action has at least one primary source URL. Verify-or-don't-file. See also themes, timeline, graph, sankey, map, country exposure, sector exposure, material exposure (+ graph), weekly briefs, portfolio scan, escalation monitor, trans-shipment hubs. Internal triage tools (RSS-poller candidate feed, source-feed health) live under /admin/candidates + /admin/sources. Subscribe via Atom feed (accepts ?country=CN, ?material=lithium, ?issuer=BIS, ?type=export_control, ?etf=SOXX, ?company=NVDA, ?minSeverity=4, ?year=2026, ?q=…) or pull /api/iptm/actions.
On 21 August 2026 Niger's Council of Ministers, under the presidency of General Abdourahamane Tiani, awarded two large-scale uranium exploitation permits. The In Azaoua perimeter (Arlit Commune, Agadez Region) — the ground previously worked by the Orano-majority Société des Mines de l'Aïr (SOMAÏR), nationalised June 2025 — was granted to TSUMCO SA (Teloua Safeguarding Uranium Mining Company), the wholly state-owned successor operator created in May 2026. The Madaouela I permit (Arlit Urban Commune), previously held by Canada's GoviEx Uranium before reverting to the public domain on 31 July 2024, was re-attributed to Madaouela Mining Company (MAMICO), now 60%-held by Australia's Atomic Eagle (GoviEx's restructured successor) and 40% by the Nigerien State — up from a prior minority state stake. MAMICO paid a $10 million redevance forfaitaire to the state and committed to roughly 1,000 local jobs and local-content procurement.
On June 2, 2026, USTR published final actionability findings in 60 parallel Section 301(b) investigations — the largest simultaneous Section 301 action in US history — determining that all 60 economies maintain unreasonable acts, policies, or practices by failing to impose or effectively enforce a prohibition on imports produced with forced labor. USTR proposed two additional duty rates: 10% on the 14 economies with partial forced-labor regimes (Canada, Ecuador, EU, Indonesia, Mexico, Pakistan, Argentina, Bangladesh, Cambodia, El Salvador, Guatemala, Malaysia, Taiwan, UK) and 12.5% on the remaining 46 economies. Tariff rates remain proposed pending a July 7, 2026 public hearing and subsequent finalization; the actionability determination is final.
On 19 May 2026, Treasurer Jim Chalmers announced a further overhaul of Australia's foreign investment framework under the Foreign Acquisitions and Takeovers Act 1975. The package introduces a performance target of processing all low-risk applications within 30 days from 1 January 2027, expands the exemption-certificate regime for repeat low-risk investors, and eliminates approval requirements for certain low-risk transaction types. Countervailing measures tighten the framework: enhanced compliance and enforcement powers are added for avoidance and non-compliance, and screening requirements are explicitly increased for sensitive sectors including critical minerals, critical infrastructure, critical technology, sensitive data, and defence-site-proximate assets.
On 17 May 2026, Treasurer Jim Chalmers signed the Foreign Acquisitions and Takeovers (Disposal of Interests in Northern Minerals Limited) Orders (No. 1) 2026 (F2026N00326), directing six China-linked foreign investors to divest a combined 1,678,895,780 shares in Northern Minerals Limited (ASX: NTU) within 14 days of the Orders commencing on 18 June 2026. The six named investors are: Real International Resources Limited (619.1m shares), Qogir Trading and Service Co. Limited (523.5m), Vastness Investment Group Limited (271.3m), Chuanyou Cong (130.1m), Hong Kong Ying Tak Limited (95.3m), and Zhongxiong Lin (39.7m), together representing approximately 17.6% of NTU's total shares. NTU owns the Browns Range Heavy Rare Earths Project in Western Australia, one of the few ex-China commercial-scale dysprosium and terbium deposits. These orders are the second tranche of Treasurer-forced divestment of Chinese shareholders in NTU, distinct from the AUD 14 million Federal Court penalty imposed on Indian Ocean International Shipping in January 2026 for non-compliance with the June 2024 disposal orders.
On 20 March 2026, METI/MOFA (Japan) and the US Departments of State and Energy jointly published the "Japan–United States Critical Minerals Project Cooperation Joint Fact Sheet," identifying five specific upstream critical-mineral projects spanning four continents (Australia, Tanzania, Brazil, UAE, Namibia) to receive structured joint financing through JOGMEC equity and offtake instruments and US DFC/Ex-Im Bank facilities. The document operationalises the October 2025 US-Japan Critical Minerals Framework and the same-day Action Plan, converting policy-framework language into named project commitments covering nickel, lithium, battery-anode graphite, and heavy rare earths. It was released the day following the Takaichi–Trump summit on 19 March 2026 and follows the Critical Minerals Investment Ministerial convened in Tokyo on 14 March 2026.
President Trump signed a Presidential Proclamation on 20 February 2026 invoking Section 122 of the Trade Act of 1974 (19 U.S.C. § 2132) to impose a temporary 10% ad-valorem import surcharge on articles imported into the United States, effective 12:01 a.m. EST on 24 February 2026. The proclamation was issued within hours of the US Supreme Court's 20 February 2026 ruling in Learning Resources, Inc. v. Trump, which held that the International Emergency Economic Powers Act (IEEPA) does not authorize the president to set tariffs and vacated the IEEPA-based reciprocal-tariff regime previously in effect. The Section 122 surcharge is statutorily limited to 150 days (terminates 24 July 2026 absent Congressional extension) and the statute caps any such surcharge at 15% ad valorem. Goods qualifying as USMCA originating from Canada or Mexico are exempt; CAFTA-DR textile/apparel articles meeting specified rules of origin are exempt; and a substantial product-exception list excludes critical minerals, energy products, certain pharmaceuticals, electronics, vehicles, aerospace products, specified agricultural goods, and goods already subject to Section 232 duties (the Section 122 duty does not stack on Section 232).
On 30 January 2026, Justice Perram of the Federal Court of Australia ordered Indian Ocean International Shipping and Service Company Ltd and its sole director Ms Jing Tian to pay a combined AUD 14 million civil penalty (Indian Ocean AUD 10 million; Ms Tian AUD 4 million) for contravening a June 2024 Treasurer disposal order under the Foreign Acquisitions and Takeovers Act 1975 (Cth). The disposal order had directed Indian Ocean to divest its 613.5 million shares in Northern Minerals Limited (ASX: NTU) — operator of the Browns Range heavy-rare-earth dysprosium and terbium project in Western Australia — by September 2024 on national security grounds. Instead, Indian Ocean transferred its NTU shares to Ms Tian in August 2024, who briefly returned then re-received them before Ms Tian transferred all 100 of her Indian Ocean shares to Ms Ning Lyu and resigned as director. The court ruled these transfers constituted a breach of the disposal order. This is the first civil-penalty action brought by an Australian Treasurer under the Foreign Acquisitions and Takeovers Act since its introduction in 1975, and the first FIRB enforcement penalty outside the residential real estate sector.
The National Reconstruction Fund Corporation (NRFC), Australia's AUD 15 billion sovereign industrial-financing vehicle, took a AUD 75 million preferred-equity cornerstone stake in Gilmour Space Technologies, a Queensland orbital-launch company, announced 20 January 2026. The stake anchors a AUD 217 million capital raise co-led with superannuation fund Hostplus (also AUD 75 million), alongside Future Fund, HESTA, Blackbird, Main Sequence, QIC, Funds SA, NGS Super and Brighter Super, valuing the company at over AUD 1 billion. Proceeds fund development and qualification of Gilmour's Eris orbital launch vehicle, scaling of satellite and rocket manufacturing, and expansion of the Bowen Orbital Spaceport in North Queensland — Australia's only licensed orbital launch facility.
On 15 December 2025 the Government of the Russian Federation, via Order No. 3758-р signed by Prime Minister Mikhail Mishustin, allocated an additional RUB 60.58 billion (approx. USD 759 million) from the government's reserve fund to subsidise interest payments and provide financial grants to Russian credit organisations supporting preferential loans to agricultural producers. The allocation preserves preferential interest rates on roughly 48,000 previously issued loans, freeing working capital for producers to expand output of cereals, fruit and vegetables. It brings total 2025 federal subsidisation of the preferential agricultural credit programme to RUB 250.1 billion.
On 11 December 2025 the US Department of State announced the inaugural Pax Silica Summit, held in Washington D.C. on 12 December 2025, at which the United States, Australia, Japan, the Republic of Korea, the United Kingdom, Singapore and Israel signed the non-binding Pax Silica Declaration. The declaration commits signatories to coordinate "trusted" supply chains across the full technology stack — software, frontier foundation models, network infrastructure, compute and semiconductors, advanced manufacturing, transportation logistics, minerals refining and processing, and energy — explicitly to reduce "coercive dependencies." The coalition has since expanded to add the United Arab Emirates, Greece, Qatar, Sweden and India (signed 20 February 2026 at the India AI Impact Summit), and on 26 March 2026 State announced a USD 250 million Pax Silica Fund intended to catalyse trusted-capital co-investment in critical-minerals processing and semiconductor supply chains.
On 3 December 2025, Export Finance Australia (EFA) disclosed a €120 million (~AU$196 million) loan commitment to Vulcan Energy Resources' Phase One Lionheart Project in Germany's Upper Rhine Valley, which will produce battery-quality lithium hydroxide monohydrate (LHM) from geothermal brine while co-generating renewable heat and power. The loan is part of a syndicated, multi-country export-credit package alongside Germany's KfW Raw Materials Fund, the European Investment Bank, Export Development Canada, Denmark's EIFO, France's Bpifrance Assurance Export, and Italy's SACE, financing a project with total capital cost of ~€2.193 billion (~AU$3.9 billion). Phase One targets 24,000 tonnes per annum of LHM, enough for roughly 500,000 electric vehicles.
On 8 October 2025 the Australian Government (Albanese) and Queensland Government (Crisafulli) jointly announced up to AUD 600 million in co-funding — split evenly at AUD 300 million each — to keep Glencore's Mount Isa copper smelter and Townsville copper refinery operating through at least 2028. Funding is structured as three tranches of up to AUD 200 million released over three years, contingent on completion of a transformation study and further review points. The package protects more than 600 direct jobs at the smelter/refinery plus roughly 500 further jobs at the adjacent Phosphate Hill facility, and preserves roughly half of Australia's total copper smelting capacity. It follows Glencore's October 2023 announcement of intended closure and a July 2025 end-of-operations notice, with Glencore describing the deal as a short-term lifeline after absorbing sustained financial losses.
India's Ministry of Defence signed a contract worth over Rs 62,370 crore (excluding taxes, ~USD 7.5 billion) with Hindustan Aeronautics Limited (HAL) on 25 September 2025 for 97 Light Combat Aircraft (LCA) Mk1A — 68 single-seat fighters and 29 twin-seat trainers — for the Indian Air Force. The acquisition falls under the "Buy (India-IDDM)" (Indigenously Designed, Developed and Manufactured) category of the Defence Acquisition Procedure 2020 and carries an indigenous-content requirement of over 64%, incorporating 67 additional indigenous items compared with the prior January 2021 LCA Mk1A contract. Deliveries begin 2027-28 and run over six years, supported by a vendor base of roughly 105 Indian component manufacturers.
On 19 September 2025 (Communiqué CM N°2025-39/SGG), Mali's Council of Ministers, chaired by General Assimi Goïta, adopted four exploitation-phase "conventions d'établissement" operationalising the 2023 Code Minier (Loi n°2023-040) against named foreign-operated mines: Lithium du Mali S.A. (Goulamina, Ganfeng Lithium), Les Mines de Lithium de Bougouni-S.A. (Foulaboula, Kodal Minerals), SEMOS-S.A. (Sadiola gold, Allied Gold) and SOMISY-S.A. (Syama gold, Resolute Mining). Each convention raises the State's shareholding to 35% (a free non-contributory 10% carry plus up to 25% acquired, of which 5% is reserved for Malian private investors) and converts the stakes into non-contributory, non-dilutable participations carrying priority-dividend rights.
On 18 September 2025 the Australian Government announced a AUD 5 billion Net Zero Fund to accelerate industrial decarbonisation, delivered as a new sub-fund of the existing AUD 15 billion National Reconstruction Fund (NRF). The fund offers highly concessional finance — targeting a rate of return of the five-year Australian government bond rate minus 1 percentage point — to help heavy-industry facilities decarbonise energy-intensive operations and to scale up domestic manufacturing of low-emissions technologies. The fund finalised its design and opened to back new manufacturing-investment and energy projects on 20 April 2026.
On 18 September 2025, the Australian Government published the Net Zero Plan 2050 and six sectoral emissions-reduction plans covering Electricity & Energy, Industry, Transport, Built Environment, Agriculture & Land, and Resources. The Net Zero Plan establishes the overarching policy architecture to achieve Australia's 62–70% emissions-reduction target (below 2005 levels) by 2035 and net zero by 2050, structured around five "CLEAN" strategic priorities. The six sector plans provide detailed decarbonisation pathways, capex envelopes, and policy-instrument linkages that frame operation of the Future Made in Australia Act, the Critical Minerals Production Tax Incentive, the Capacity Investment Scheme, and the Safeguard Mechanism for the following decade. The plans were released simultaneously with Australia's updated 2035 Nationally Determined Contribution submitted to the UNFCCC.
Australia aligned with the EU/G7's 18th-package price cap by lowering its own cap on Russian-origin crude oil from USD 60 to USD 47.60 per barrel, and designated 95 additional "shadow fleet" tanker vessels used to circumvent the cap, under the Autonomous Sanctions Regulations 2011. Foreign Minister Penny Wong framed the measure as intended to depress the market value of Russian crude and reduce war-financing oil revenue. The listings bring Australia's cumulative shadow-fleet vessel designations to over 150 since June 2025 and its total Russia-related sanctions actions since 2022 to roughly 1,600.
On 19 August 2025 the Australian Renewable Energy Agency (ARENA) opened applications for the Battery Breakthrough Initiative (BBI), an AUD 500 million capital-grant and production-incentive program to build domestic battery manufacturing capability across the value chain, from active materials to finished cells and packs. The program was first announced in the May 2024 Federal Budget as a pillar of the Future Made in Australia agenda and the National Battery Strategy, and is designed to strengthen supply-chain resilience by leveraging Australia's position as the world's largest lithium producer and a major nickel/cobalt/graphite supplier. Funding was subsequently cut to AUD 142.32 million in the 2026 Federal Budget (see amendments).
Mongolia's State Great Khural adopted Resolution No. 62 on 2 July 2025, establishing a Temporary Oversight Committee chaired by MP O. Batnairamdal to investigate the state's ownership interest and percentage in the Oyu Tolgoi Strategic Group of Deposits, including the valuation of JV License areas (Shivee Tolgoi and Javkhlant) held by Entrée LLC for the Entrée/OTLLC joint venture. The Committee conducted three-day public hearings in early December 2025, summoning approximately 300 witnesses including former Mongolian Prime Ministers and Presidents, and Rio Tinto CEO Stephen Scott. On 19 December 2025, the Committee submitted a draft resolution to Parliament, which was referred to the Standing Committee on Economics for further consideration ahead of government negotiations. The investigation creates material uncertainty for Rio Tinto's Oyu Tolgoi underground ramp-up (~480 kt/y Cu at peak) and Entrée Resources' JV License renewal, with the 2009 Investment Agreement potentially subject to renegotiation.
Australia's Anti-Dumping Commission (ADC) imposed a provisional anti-subsidy (countervailing) duty on imports of light gauge steel stud and track (LGST) from China, effective 18 June 2026, under Case 679. The investigation — initiated 30 June 2025 (initiation notice ADN 2025/053) following an application from local manufacturer Rondo Building Services Pty Ltd — covers metallic-coated LGST with a profile up to 170mm x 170mm and base metal thickness up to 0.69mm, imported under HS codes 7216.61.00, 7216.69.00, 7308.90.00 and 7216.91.00. A parallel provisional anti-dumping duty investigation on the same product is running on the same case timeline. The Commission's Statement of Essential Facts was delayed to no later than 17 June 2026, with final recommendations to the Minister for Industry, Innovation and Science expected by 17 August 2026.
The US Department of Commerce preliminarily determined that countervailable subsidies are being provided to producers and exporters of silicon metal from Laos, Australia, Norway, and Thailand, publishing four parallel preliminary affirmative CVD determinations on 2025-09-26 following an initiation on 2025-05-21 (petition by Ferroglobe USA, Inc. and Mississippi Silicon LLC). For Laos, Commerce set a preliminary countervailable-subsidy cash-deposit rate of 240.00% ad valorem for both the sole mandatory respondent, Lao Silicon Co., Ltd., and the all-others rate, based entirely on adverse facts available after finding the respondent did not cooperate. Companion CVD investigations against Australia, Norway, and Thailand were found affirmative the same day, each with its own preliminary subsidy-rate cash-deposit schedule. Commerce ordered CBP to suspend liquidation and require cash deposits at the indicated rates on covered entries from the Laos determination onward. Final CVD determinations are aligned with companion antidumping investigations on the same product.
Prime Minister Anthony Albanese announced the Critical Minerals Strategic Reserve (CMSR) on 24 April 2025 as a A$1.2bn election commitment in the 2025-26 Budget. The Department of Industry, Science and Resources released the design package on 12 January 2026, prioritising antimony, gallium, and rare earth elements as the initial focus minerals (A$1bn for offtake transactions drawn from an expanded A$5bn Critical Minerals Facility, plus A$185m for physical stockpiling and implementation). The Export Finance and Insurance Corporation Amendment (Strategic Reserve) Act 2026 passed Parliament on 31 March 2026 with effect 1 April 2026, giving Export Finance Australia (EFA) statutory power to enter offtake agreements, contracts for difference, forward contracts, and physical stockpiles for fuel and critical minerals. CMSR becomes operational in second half 2026.
President Trump signed Executive Order 14257 on 2 April 2025 declaring a national emergency over US trade deficits and imposing a baseline 10% ad-valorem tariff on imports from nearly all trading partners effective 5 April, with higher country-specific "reciprocal" rates effective 9 April. The rate schedule was constructed from a formula tied to bilateral goods-trade deficits and ranged from 10% (UK, Singapore, Brazil, Australia, others) through 20% (EU), 24% (Japan), 25% (Korea), 32% (Taiwan, Indonesia, Switzerland), 34% (China, later raised to 84% then 125% during the April escalation), 46% (Vietnam), 49% (Cambodia). Multiple subsequent EOs paused the country-specific rates for 90 days for non-China destinations on 9 April while keeping the 10% baseline, pending bilateral negotiations.
President Trump signed two Presidential Proclamations on 11 February 2025 reinstating a universal 25% ad-valorem tariff on all steel-mill products and raising the aluminum tariff from 10% to 25% on all imports into the United States, effective 12 March 2025. The proclamations revoked every bilateral exclusion and quota arrangement negotiated by the Biden administration with the EU, UK, Japan, Korea, Australia, and others under the 2021-2022 "alternative measures" frameworks, returning all trading partners to the baseline Section 232 rate without product-level or country-level carve-outs.
Australia enacted the Taxation (Multinational—Global and Domestic Minimum Tax) Act 2024 (No. 132, 2024) and its companion Imposition Act (No. 133, 2024), receiving royal assent on 10 December 2024, together implementing all three OECD/G20 GloBE charges in a single legislative cycle: an Income Inclusion Rule (IIR), an Undertaxed Profits Rule (UTPR), and a Qualified Domestic Minimum Top-up Tax (QDMTT). The IIR and QDMTT apply to fiscal years beginning on or after 1 January 2024 (retroactive at enactment); the UTPR applies to fiscal years beginning on or after 1 January 2025. All three charges apply to Australian members of MNE groups with consolidated annual revenue ≥ EUR 750 million, administered by the Australian Taxation Office.
In a final rule published at 89 FR 84766 (FR Doc 2024-23932), the US Bureau of Industry and Security (BIS) amends the Export Administration Regulations (EAR) to remove BIS licence requirements on certain spacecraft and related items — including remote-sensing spacecraft and on-orbit servicing, assembly, and manufacturing (OSAM) items — for exports and reexports to Australia, Canada, and the United Kingdom. The rule is effective immediately on publication (23 October 2024) and is part of a three-rule package modernising the US space-related export-control regime (companion IFR 2024-23958 broadens controls relief for ~40 additional destinations; companion proposed rule 2024-23975 floats a new License Exception Commercial Space Activities). The AU/CA/UK carve-out builds on the trilateral National Technology and Industrial Base (NTIB) framework.
Australia's first standalone cyber-security statute (Act No. 98 of 2024), passed by Parliament on 25 November 2024 and granted Royal Assent on 29 November 2024, with provisions commencing in tranches through 30 May 2025. The Act creates four binding regimes: (i) mandatory security-of-things standards for connected and IoT products supplied in Australia under regulations administered by the Department of Home Affairs; (ii) a mandatory ransomware / cyber-extortion payment disclosure regime requiring reporting business entities with annual turnover above AUD 3 million to notify the Australian Signals Directorate within 72 hours of any ransom payment made by or on behalf of the entity; (iii) a statutory Cyber Incident Review Board to conduct no-blame post-incident reviews of significant cyber incidents; and (iv) a "limited use" protection restricting how information voluntarily shared with the National Cyber Security Coordinator may be used by Commonwealth agencies. The Act implements core initiatives from the 2023-2030 Australian Cyber Security Strategy and affects every firm selling connected devices into Australia or operating above the turnover threshold in Australia.
President Lukashenko signed Decree No. 278 on 10 July 2024, extending the prohibitive import customs duty regime established under Decree No. 16 (12 January 2024) through 30 June 2025, preventing its lapse at year-end 2024. The decree also expands the commodity list subject to elevated import duty rates. The measure explicitly frames the duties as retaliatory, targeting goods originating from states designated as "unfriendly" to Belarus — principally EU member states, the US, UK, Canada, Japan, Australia, New Zealand, Switzerland, Norway, Iceland, and other sanctioning jurisdictions. Co-ordinated with Russia's EAEU parallel-import framework (Resolution No. 506), the regime affects the cost arithmetic for sanctioned-goods routing through EAEU customs-union channels and signals continued institutionalisation of Belarus's counter-sanctions architecture.
On 2 June 2024, Treasurer Jim Chalmers signed the Foreign Acquisitions and Takeovers (Disposal of Interests in Northern Minerals Limited) Orders 2024 (F2024N00475), directing five China-linked foreign investors to divest a combined 613,573,632 shares in Northern Minerals Limited (ASX: NTU) to non-associates by 2 September 2024 on national-security grounds. The five named investors are Yuxiao Fund Pte Ltd, Black Stone Resources Limited, Indian Ocean International Shipping and Service Company Limited, Ms Ximei Liu, and Mr Xi Wang, together holding approximately 10.4% of NTU's total shares. NTU owns the Browns Range Heavy Rare Earths Project in the East Kimberley region of Western Australia — one of the few commercial-scale dysprosium and terbium deposits outside China. This is the foundational FATA s.69(2) disposal-order instrument; non-compliance led to an AUD 14 million Federal Court penalty in January 2026 and a second tranche of disposal orders against six further China-linked investors in May 2026.
Australia's Future Made in Australia package, announced in the 2024-25 Federal Budget on 14 May 2024, commits A$22.7bn over 10 years to position Australia as a preferred supplier in the global clean-energy and critical-minerals supply chain. The two flagship production tax incentives are: (1) the Critical Minerals Production Tax Incentive (10% of eligible processing and refining costs for 31 critical minerals) and (2) the Hydrogen Production Tax Incentive (A$2 per kg of eligible renewable or low-emissions hydrogen, 2027-2040). A National Interest Framework administered by DISR determines which investments qualify. The framework act established a Future Made in Australia Coordinator and consolidated existing industrial-support vehicles (NAIF, EFA) under a single policy lens.
Act No. 9 of 2025, given Royal Assent on 14 February 2025, enacts the two production tax credits announced in the May 2024 Future Made in Australia package. Schedule 1 creates the Hydrogen Production Tax Incentive (HPTI): A$2/kg refundable tax offset for eligible renewable hydrogen produced with emissions intensity below 0.6 kgCO2e/kg H2. Schedule 2 creates the Critical Minerals Production Tax Incentive (CMPTI): a refundable 10% tax offset on eligible processing and refining expenditure for the 31 minerals on Australia's Critical Minerals List. Both offsets apply to production occurring between 1 July 2027 and 30 June 2040, capped at 10 years per project, administered by the ATO via new Divisions 419 (CMPTI) and 421 (HPTI) of the Income Tax Assessment Act 1997.
Released 9 May 2024 by the Minister for Resources Madeleine King through the Department of Industry, Science and Resources, the Future Gas Strategy is Australia's first national-level gas-policy framework, explicitly committing gas to a continuing supply role "through to 2050 and beyond" in support of the net-zero transition. The Strategy is built on six guiding principles -- gas must remain affordable for Australian users during transition, reliable supply requires new sources, emissions from production and use must be reduced, gas exports remain critical to global decarbonisation pathways, competitive gas markets are essential, and collaboration is needed to deliver these objectives -- and is paired with a separate Future Gas Strategy Analytical Report. It sets the Commonwealth policy posture for all subsequent LNG-export approval decisions (Northwest Shelf, Beetaloo, Scarborough), east-coast domestic-supply policy (including the AEMO gas-statement-of- opportunities forecast and any future domestic-reservation intervention), and Australia's international posture on long-term LNG offtake renewals with Japan, Korea and Taiwan.
The US Bureau of Industry and Security (BIS) issued an interim final rule (IFR) amending the Export Administration Regulations (EAR) to remove list-based license requirements — including National Security Column 1 (NS1), Regional Stability Column 1 (RS1) and Missile Technology Column 1 (MT1) reasons-for-control — for exports, reexports and in-country transfers to or within Australia and the United Kingdom. The IFR also expands the availability of license exceptions and reduces the scope of end-use and end-user-based license requirements for the two AUKUS partners, while leaving firearms-related items (Crime Control / CC) and a narrow set of other ECCNs untouched. The rule is the EAR-side companion to a parallel DDTC proposed rule creating an ITAR §126.7 exemption for defense articles and services traded among authorised AU/UK/US users, and is the foundational regulatory implementation of the AUKUS Pillar 2 advanced-capability cooperation track.
The Defence Trade Controls Amendment Act 2024 (C2024A00021) received Royal Assent on 8 April 2024 and created three new criminal offences in the Defence Trade Controls Act 2012: section 10A (supply of Defence and Strategic Goods List technology in Australia to a non-exempt foreign person); section 10B (secondary supply of DSGL Part 1 Munitions or Part 2 Dual-Use Sensitive/Very Sensitive goods or technology outside Australia when originally exported from Australia); and section 10C (provision of DSGL Part 1 services to foreign nationals outside Australia). All three offences carry maximum penalties of 10 years imprisonment or 2,500 penalty units (~A$782,500), or both. The offence framework commenced 1 September 2024 with a six-month compliance-transition period; criminal liability attached from 1 March 2025. The Act also codifies AUKUS-partnership exemptions, carving out supplies to and from citizens and permanent residents of the United Kingdom and United States, underpinning the licence-free trilateral technology-transfer environment sought under AUKUS Pillar 2.
The National Reconstruction Fund Corporation Act 2023 (Act No. 12 of 2023, Cth) received royal assent on 11 April 2023 and established the National Reconstruction Fund Corporation (NRFC) as a corporate Commonwealth entity under the PGPA Act 2013, formally constituted on 18 September 2023. The Act commits A$15 billion of concessional finance (loans, equity and guarantees) to projects in seven declared priority areas: renewables and low-emission technologies; medical science; transport; value-add in agriculture, forestry and fisheries; value-add in resources; defence capability; and enabling capabilities (advanced manufacturing, AI, robotics, quantum). The NRFC predates and underpins the 2024 Future Made in Australia package -- it is the equity/loan-finance instrument of the Australian industrial-policy stack, distinct from the FMIA umbrella framework and from the FMIA Production Tax Credits Act 2024 (the tax-credit instrument).
On 4 April 2022 Australia's Minister for Foreign Affairs registered the Autonomous Sanctions (Export Sanctioned Goods—Russia) Amendment (No.1) Designation 2022, made under the Autonomous Sanctions Regulations 2011. It amended the existing Export Sanctioned Goods—Russia designation to add further categories of goods to the list of items whose export, supply or transfer to Russia is prohibited, extending an export-ban regime introduced in response to Russia's invasion of Ukraine. It took effect on registration.
Australia designated aluminium ores (including bauxite), alumina and aluminium hydroxide as "export sanctioned goods" for Russia under the Autonomous Sanctions (Export Sanctioned Goods -- Russia) Designation 2022, banning their export from Australia to Russia effective 20 March 2022. Prime Minister Scott Morrison announced the measure a day earlier as part of Australia's response to the invasion of Ukraine, framing it as an attack on Russia's aluminium industry, which sourced roughly 20% of its alumina from Australian supply. Rusal, Russia's dominant aluminium producer, was identified as the primary target.
The Autonomous Sanctions Amendment (Ukraine Regions) Regulations 2022 (F2022L00179) apply to the Ukrainian regions of Donetsk and Luhansk the autonomous sanctions measures already in place for Crimea and Sevastopol, commencing 28 March 2022. DFAT describes the measures as prohibiting trade in the transport, energy, telecommunications, and oil, gas and minerals sectors of those regions. Foreign Minister Marise Payne announced Australia's response on 24 February 2022, alongside listings of Russian individuals and banks.
Russia Federal Law No. 127-FZ of 4 June 2018 "On measures (countermeasures) regarding the unfriendly actions of the United States of America and other foreign states" establishes the statutory authority under which the President and Government of the Russian Federation may impose counter-measures against states that engage in "unfriendly actions" toward Russia. The law enumerates permissible countermeasure categories — including import/export prohibitions, restrictions on foreign participation in Russian state procurement, suspension of international cooperation obligations, and prohibition of foreign-company services and transactions — and delegates implementation authority to the President (primary) and Government. It entered into force on the day of official publication (4 June 2018) and is the foundational parent statute for every major Russian counter-sanctions presidential decree and government resolution subsequently issued, including the gas-for-roubles payment regime, capital controls, parallel- imports authorisation, and asset-confiscation counter-mechanism.
The Autonomous Sanctions Act 2011 (Cth Act No. 38 of 2011; assented 12 April 2011, commenced 6 December 2011 with the Autonomous Sanctions Regulations 2011) is Australia's foundational parent statute enabling the entire autonomous sanctions regime — economic and travel measures imposed unilaterally by Australia independently of UN Security Council mandatory obligations. The Minister for Foreign Affairs may, by legislative instrument, impose targeted financial sanctions, travel bans, and vessel-dealing prohibitions on designated persons, entities, and vessels. As of 2026 the Act underpins Australia's autonomous sanctions programs against Russia, Iran, DPRK, Myanmar, Belarus, Syria, Venezuela, Zimbabwe, Libya, Ukraine (occupied territories), and other regimes, and was materially extended in December 2021 to authorise Magnitsky-style thematic human-rights and corruption sanctions. Structurally peer-foundational to the UK Sanctions and Anti-Money Laundering Act 2018 (SAMLA), Canada's Special Economic Measures Act 1992 (SEMA), Japan's FEFTA sanctions provisions, and the EU's Anti-Coercion Instrument — the ASA 2011 completes the G7+AU sanctions-parent-statute set in the IPTM register.