Loading…
Loading…
Structured register of government actions in the geoeconomic space — export controls, tariffs, sanctions, FDI screening, subsidies, industrial-policy laws — cross-referenced into the country, minerals, and ETF surface. Charter: docs/IPTM_CHARTER.md.
Severity 1-5 is the qualitative impact rating (1=minor, 5=structural). The bilateral-trade-grounded quant scorer is the next IPTM milestone. RBI (Register Breadth Index) is a complementary structural-breadth indicator from scripts/py/iptm/breadth.py; divergence between RBI and severity is itself informative (high-sev / low-RBI = strategic chokepoint; low-sev / high-RBI = broad but shallow). Every action has at least one primary source URL. Verify-or-don't-file. See also themes, timeline, graph, sankey, map, country exposure, sector exposure, material exposure (+ graph), weekly briefs, portfolio scan, escalation monitor, trans-shipment hubs. Internal triage tools (RSS-poller candidate feed, source-feed health) live under /admin/candidates + /admin/sources. Subscribe via Atom feed (accepts ?country=CN, ?material=lithium, ?issuer=BIS, ?type=export_control, ?etf=SOXX, ?company=NVDA, ?minSeverity=4, ?year=2026, ?q=…) or pull /api/iptm/actions.
The European Commission and the US announced on 24 April 2026 the signing of a Memorandum of Understanding (MoU) on a strategic partnership on critical minerals, accompanied by an EU-US Critical Minerals Action Plan. The framework deepens cooperation on supply-chain security across the strategic raw-materials list shared between the two jurisdictions — joint financing, recycling, mutual recognition of strategic- project status under the EU Critical Raw Materials Act (filed: 2024-05-23-eu-crma-entry-into-force) and US IRA §30D / §45X frameworks (filed: 2022-08-16-us-inflation-reduction-act). The agreement is positioned as a joint response to non-market practices in third-country supply chains for the named materials.
On 3 February 2026 the European Commission opened an in-depth Phase II investigation under the Foreign Subsidies Regulation (FSR) — the second FSR ex officio case and the first targeting the renewable-energy wind-OEM sector — into whether Xinjiang Goldwind Science & Technology Co., Ltd. and its EU affiliates received Chinese foreign subsidies (grants, preferential tax treatment, and state-bank preferential financing) that distort competition for wind-turbine supply and services in the EU internal market. The case (FS.100143) follows the April 2024 preliminary-review opening and subjects Goldwind to an 18-month Phase II investigation with potential redressive-measures decision. The action structurally extends the FSR enforcement perimeter from security equipment (Nuctech, FS.100068) into the green-transition energy-equipment supply chain.
Iberdrola Clientes' Project NOON — a 120 MW electrolysis renewable-hydrogen plant in Spain targeting 161,000 tonnes of RFNBO hydrogen production over its first 10 years — was awarded a EUR 135.5 million (USD 140.9 million) grant under the European Commission's Innovation Fund second domestic hydrogen auction (IF24). Iberdrola announced the award on 2 December 2025; the formal Grant Agreement with the European Climate, Infrastructure and Environment Executive Agency (CINEA) was signed on 20 January 2026 as part of a batch of six IF24 projects (Spain, Finland, Norway) completing grant preparation. NOON is one of the eight Spain-based projects selected in the IF24 main lot.
The European Investment Fund (EIF), part of the EIB Group, pledged EUR 70 million (~USD 75.8 million) on 25 November 2025 to Alantra's Klima Energy Fund II ("Klima2"), a growth-equity fund targeting roughly twelve fast-growing European companies in clean energy generation, grid and storage infrastructure, energy efficiency and sustainable transport, via EUR 10-30 million tickets. The investment is framed as supporting the EIB Group's TechEU initiative and the REPowerEU plan to accelerate the EU's clean-energy transition and reduce fossil-fuel import dependence. Global Trade Alert separately logs the transaction as a "red"-flagged state-linked financial investment-support intervention.
Leclanché GmbH (a subsidiary of Swiss battery maker Leclanché SA) signed a EUR 74.2 million (USD ~83.6 million) grant agreement with CINEA, the European Climate, Infrastructure and Environment Executive Agency, on 10 November 2025. The grant, awarded under the EU Innovation Fund's 2024 Battery call (IF24 Battery), funds the "Willstätt GigaFactory 2 GWh" (WGF2G) project — an expansion of Leclanché's existing German production site to 2 GWh of annual capacity using the company's proprietary water-based, PFAS-free lithium-ion cell manufacturing process. WGF2G was one of five projects (of six initially invited in July 2025, one of which withdrew) to complete grant preparation and sign, out of a combined EUR 643 million awarded across four EU member states under the IF24 Battery call.
The European Commission approved a EUR 90.8 million (USD ~104.4 million) Innovation Fund grant for LG Energy Solution Wrocław Limited Liability Company on 5 November 2025, funding the "46inEU — Powering the Future: 46 Cylinders, Infinite Possibilities in Europe" project at LG's existing Wrocław, Poland site. CINEA (the EU's Climate, Infrastructure and Environment Executive Agency) lists 46inEU's status as "Grant signed" under the Innovation Fund's 2024 Battery call (IF24 Battery), which produces Li-ion NCMA (nickel-cobalt-manganese-aluminium) cylindrical cells for electric vehicles. The grant is one of five signed under the IF24 Battery call's EUR 643 million cohort announced by CINEA on 10 November 2025.
The European Commission's Innovation Fund, administered by CINEA, signed a grant agreement (GTA-recorded at EUR 49.6 million / USD 58.2 million; independent coverage rounds to EUR ~50 million) with Green Dot Advanced Recycling GmbH for "LARS" — the first European large-scale integrated pre-treatment and chemical-recycling plant converting mixed plastic waste into pyrolysis oil as an alternative to fossil-based feedstock, to be built in Germany. LARS was one of six projects invited off the Innovation Fund 2023 general-call (IF23Call) reserve list to sign grant agreements — worth nearly EUR 319 million combined — after eight originally-selected projects withdrew from the March 2025 signing round. The plant targets entry into operation by 30 September 2028 and is expected to avoid an estimated 1.75 million tonnes of CO2-equivalent emissions over its first ten years.
Iberdrola Clientes' GRHENA project — a green industrial-heat generation hub at the Chemical Industrial Park of Tarragona, Spain, designed to produce up to 648 GWh/year of steam via electric boilers powered by renewable electricity — was awarded a EUR 53,938,146 (~USD 63.5 million) grant under the European Commission's Innovation Fund. The Grant Agreement was signed on 22 July 2025 as part of a batch of six Innovation Fund 2023 general-call projects (worth EUR 319 million combined) that collectively target 24.1 million tonnes of CO2-equivalent avoided over their first ten years of operation. GRHENA is described as the first large-scale demonstrator of direct industrial electrification of heat generation, replacing natural gas at the Tarragona chemical complex.
The European Commission's Innovation Fund, administered by CINEA, signed a EUR 40 million (USD ~42.2 million) grant agreement with Swedish wave-energy developer CorPower Ocean AB for its "VianaWave" project — a pre-commercial 10 MW wave-energy farm comprising 30 Wave Energy Converters (WECs) to be deployed off the coast of northern Portugal, generating an estimated 30 GWh/year (enough for ~7,500 Portuguese homes). VianaWave was one of six projects invited off the Innovation Fund 2023 general-call (IF23Call) reserve list to sign grant agreements — worth nearly EUR 319 million combined — after eight originally-selected projects withdrew from the March 2025 signing round. Commercial operations are targeted for 2028/2029, with an estimated 75% of the project's lifetime value spent within Portugal.
The European Investment Fund (EIF), part of the EIB Group, committed EUR 75 million (~USD 87.8 million) on 21 July 2025 to Serena Infra II, an infrastructure growth fund managed by Spain's Serena Industrial Partners targeting a EUR 250 million final close. The fund will deploy EUR 25-30 million equity tickets into eight to ten early-stage European infrastructure projects in biogas/biomass, water systems and modern mobility — segments often overlooked by conventional financiers due to early-development risk. The commitment is backed by the EU's InvestEU programme. Global Trade Alert separately logs the transaction as a "red"-flagged state-linked financial investment-support intervention.
The European Commission approved a EUR 227.9 million (USD ~267.1 million) Innovation Fund grant for TotalEnergies Raffinerie Antwerpen N.V.'s "ARCaDe" (Antwerp Refinery Carbon capture and DeNOx) project, with the grant agreement signed on 22 July 2025. ARCaDe was one of six projects — spanning refinery decarbonisation, hydrogen, ocean energy, plastics recycling, and green heat — invited off the Innovation Fund 2023 general-call (IF23Call) reserve list after eight originally-selected projects withdrew from the March 2025 signing round; the six-project cohort was worth nearly EUR 319 million combined. The project targets carbon capture and NOx-reduction retrofits at TotalEnergies' Antwerp refinery, financed via the EU Emissions Trading System.
The European Commission on 20 May 2025 published the results of the second EU Hydrogen Bank auction (IF24), selecting 15 renewable hydrogen production projects across five European Economic Area countries to share approximately €992 million in Innovation Fund grants. Winning projects span transport, chemicals, methanol, and ammonia end-uses; three projects were selected under a dedicated maritime-fuels lot. Spain, Lithuania, and Austria committed over €700 million in additional national co-funding via the Auctions-as-a-Service mechanism, bringing total public support above €1.69 billion and marking the first large-scale EEA co-funded hydrogen auction.
Regulation (EU) 2024/1735 - the Net Zero Industry Act (NZIA) - was published in the Official Journal on 22 June 2024 and entered into force on 12 July 2024 (twenty days after OJ publication). It sets a binding target that at least 40% of the EU's annual deployment needs for net-zero technologies be manufactured within the EU by 2030. It establishes a streamlined permitting regime for Net-Zero Strategic Projects (NZSP) capped at 18 months for construction permits (9 months for smaller projects), creates Net-Zero Regulatory Sandboxes, and requires public procurers and auction designers to include resilience and sustainability criteria that effectively favour non-China-sourced equipment. The Act is the manufacturing-capacity complement to the Critical Raw Materials Act (CRMA, Reg 2024/1252, filed separately) and was explicitly designed to close the EU's competitive gap with US IRA manufacturing incentives.
Regulation (EU) 2022/2560 on foreign subsidies distorting the internal market — the EU Foreign Subsidies Regulation (FSR) — entered into force on 12 July 2023, with notification obligations becoming applicable from 12 October 2023. The FSR gives the European Commission powers to investigate financial contributions granted by non-EU governments to companies active in the EU, and to impose remedies (commitments, redressive measures, prohibitions) where such subsidies are found to distort competition. Three review tools: (i) notifiable concentrations (M&A above €500m EU turnover + €50m foreign financial contributions); (ii) notifiable public procurement bids (€250m+ contract value + €4m foreign contributions); (iii) ex-officio investigations of any other market situation. Although neutral on its face, the regime has been used predominantly against Chinese-state-backed bidders + investors.