Loading…
Loading…
Structured register of government actions in the geoeconomic space — export controls, tariffs, sanctions, FDI screening, subsidies, industrial-policy laws — cross-referenced into the country, minerals, and ETF surface. Charter: docs/IPTM_CHARTER.md.
Severity 1-5 is the qualitative impact rating (1=minor, 5=structural). The bilateral-trade-grounded quant scorer is the next IPTM milestone. RBI (Register Breadth Index) is a complementary structural-breadth indicator from scripts/py/iptm/breadth.py; divergence between RBI and severity is itself informative (high-sev / low-RBI = strategic chokepoint; low-sev / high-RBI = broad but shallow). Every action has at least one primary source URL. Verify-or-don't-file. See also themes, timeline, graph, sankey, map, country exposure, sector exposure, material exposure (+ graph), weekly briefs, portfolio scan, escalation monitor, trans-shipment hubs. Internal triage tools (RSS-poller candidate feed, source-feed health) live under /admin/candidates + /admin/sources. Subscribe via Atom feed (accepts ?country=CN, ?material=lithium, ?issuer=BIS, ?type=export_control, ?etf=SOXX, ?company=NVDA, ?minSeverity=4, ?year=2026, ?q=…) or pull /api/iptm/actions.
The European Commission approved, under EU State aid rules, a German capacity mechanism authorising up to EUR 35.2 billion in support for electricity generation, storage and demand-side flexibility capacity through 2045. The scheme is technology-neutral, allocates support via competitive auctions (first auction 8 September 2026, 15-year contracts, delivery from 2031), and requires new gas-fired plants to be hydrogen-capable and to reach climate-neutral operation by 2045 at the latest. The Commission estimates annual scheme cost at EUR 1-3 billion in 2031 and EUR 0.9-2.3 billion per year from 2032-2045.
The Union Cabinet chaired by Prime Minister Narendra Modi approved on 5 May 2026 two new semiconductor manufacturing units under the India Semiconductor Mission (ISM) Phase 1: Crystal Matrix Limited (CML) — India's first GaN-based compound-semiconductor and Mini/Micro-LED display fabrication facility (INR 3,068 crore, Dholera, Gujarat) and Suchi Semicon Private Limited (SSPL) — an OSAT facility for discrete semiconductors (INR 868 crore, Surat, Gujarat). Cumulative investment INR 3,936 crore (~USD 400mn); 2,230 skilled jobs at full ramp. This constitutes the 12th and final batch of ISM Phase 1 approvals, closing the first-phase envelope before ISM 2.0 (filed 2026-02-01) takes over.
NEDO, under METI's Green Innovation Fund, launched the "Next-Generation Tandem Solar Cell Mass Production Technology Demonstration Project," a JPY 153.3 billion (maximum; JPY 123.2 billion committed for the initial three-year phase) programme running fiscal 2025-2030. Two companies — Kaneka Corporation and Aisin Corp — were selected, each holding mass-production plans exceeding 500MW by fiscal 2030 for perovskite-silicon tandem solar cells. The programme targets conversion efficiency above 30% and a residential generation cost below JPY 12/kWh, aimed at establishing high-yield, high-throughput manufacturing processes ahead of anticipated global scale-up.
Dubai's Vice President and Prime Minister Sheikh Mohammed bin Rashid Al Maktoum launched AED 12.8 billion (~USD 3.5bn) in strategic expansion projects for the Dubai Silicon Oasis free zone, comprising a AED 11 billion (~USD 3.0bn) "District IO" technology district and a AED 1.8 billion (~USD 0.49bn) Block 14 mixed-use development. District IO targets smart mobility, 3D printing, robotics, X-Tech, AI, quantum computing and Web3 firms via 25 LEED-compliant buildings, R&D labs and data centres, with capacity for 6,500+ companies and a stated goal of AED 103bn GDP contribution and 70,000+ jobs by 2036. Global Trade Alert classifies the intervention as a financial grant plus an in-kind grant to the free zone.
On 15 January 2026, Canada Growth Fund Inc. (CGF), a CAD 15bn federal Crown investment vehicle, announced it will lead an up to US$85 million structured financing for Mangrove Water Technologies Ltd. (Mangrove Lithium), a British Columbia-based lithium refiner. CGF's own commitment is up to US$65 million, alongside continued participation from existing investors Breakthrough Energy Ventures and BMW i Ventures; the CGF tranche closed concurrently with a separate CAD 9 million loan from National Bank of Canada backed by the federal Clean Technology Manufacturing Investment Tax Credit. Proceeds commission Mangrove's 1,000-tonne-per-annum Single Stack Plant in Delta, BC and advance development of a planned 20,000-tonne-per-year full-scale plant, with the government citing the deal as reducing reliance on overseas lithium processing and building an onshore mining-to-refining supply chain.
On 2026-01-15 the People's Bank of China announced a CNY 400 billion increase to its science-and-technology-innovation and equipment-renewal relending facility (科技创新和技术改造再贷款), raising the total quota from CNY 800 billion to CNY 1.2 trillion. The measure supports the optimized implementation of the "two new" (equipment renewal / consumer trade-in) policy programme, and from 2026 extends eligibility to private small and medium-sized enterprises with relatively high R&D spending, which were previously excluded from this relending window.
On 15 January 2026 the Government of Vietnam issued Decree No. 20/2026/ND-CP, providing detailed implementing regulations for National Assembly Resolution 198/2025/QH15 (17 May 2025) on special mechanisms and policies for the development of the private economic sector. The decree (6 chapters, 17 articles) introduces a synchronized incentive framework covering corporate and personal income tax exemptions, land-access support, science/technology and digital transformation support, and human-resource training. SMEs registering for the first time are exempt from corporate income tax for three consecutive years; innovative startups receive a full CIT exemption for two years followed by a 50% reduction for four years; eligible experts and scientists at innovative startups, R&D centers, and intermediary organizations receive a personal income tax exemption for two years followed by a 50% reduction for four years. The decree took effect on the date of signature, with CIT/PIT incentive provisions retroactively applicable from 17 May 2025 (the effective date of Resolution 198/2025/QH15).
The US Department of Energy announced $2.7 billion in task-order funding over ten years to rebuild domestic uranium enrichment capacity: $900 million each to American Centrifuge Operating and General Matter to develop high-assay low-enriched uranium (HALEU) enrichment capacity, $900 million to Orano Federal Services to expand low-enriched uranium (LEU) enrichment capacity, and $28 million to Global Laser Enrichment for next-generation enrichment technology. DOE frames the awards as reducing US reliance on foreign — chiefly Russian — enriched uranium supply and securing fuel for the country's 94 commercial reactors and future advanced-reactor deployment, with funds distributed under a milestone-based accountability framework.
India's Ministry of Ports, Shipping and Waterways notified operational guidelines on 26 December 2025 for two paired shipbuilding subsidy schemes with a combined outlay of ₹44,700 crore (~USD 5.4bn). SBFAS (₹24,736 crore corpus) provides 15–25% per-vessel financial assistance tiered by vessel category, with milestone-linked disbursement and a 40% scrap-value credit for vessels broken at Indian yards. SbDS (₹19,989 crore outlay) funds greenfield shipbuilding clusters, brownfield-yard modernisation, and establishment of an India Ship Technology Centre. Both schemes are valid to 31 March 2036 with an in-principle extension to 2047, with applicability for shipbuilding contracts signed from 24 September 2025. On 7 January 2026 the guidelines were amended to include chemical tankers under SBFAS Category-1.
On 26 December 2025, Japan's Cabinet approved the FY2026 (Reiwa 8) national budget, which the Global Trade Alert database logs as including a "Multi-modal Foundation Model Development Project with a Focus on AI Robots and Physical AI" financial-grant line administered by METI, effective with the fiscal year on 1 April 2026. NEDO -- METI's implementing R&D agency -- operationalised this line through a commissioned-project (100%-funded) solicitation opened 24 March 2026 and closed 22 April 2026, capping funding at up to JPY 383.4 billion (~USD 2.5bn) per adopted proposal for FY2026, with the programme running FY2026 through FY2030 (initial contract period FY2026-FY2027, annual stage-gate reviews thereafter). The goal is a domestically developed multimodal ("VLM/VLA") foundation model that keeps Japanese factory-floor and robotics data onshore while underpinning "physical AI" -- AI systems embedded in robots and industrial equipment -- to address labour shortages and lift manufacturing productivity. NEDO's call for proposals subsequently selected Noetra Inc. and the National Institute of Advanced Industrial Science and Technology (AIST/産総研) as awardees.
On 26 December 2025, Japan's Cabinet approved the FY2026 (Reiwa 8) national budget, which allocates JPY 122.0 billion (~USD 800m) to the "Next-Generation Innovative Reactor Technology Development and Industrial Base Strengthening Support Project" (次世代革新炉の技術開発・産業基盤強化支援事業), up from JPY 88.9 billion in the FY2025 initial budget plus a JPY 6.0 billion FY2025 supplementary allocation. The programme, administered by ANRE under METI's GX (Green Transformation) Promotion budget, funds technology development and supply-chain build-out for Japan's "innovative light-water reactors" (revised BWR/PWR designs with enhanced passive safety) and small modular reactors under the government's GX2040 Vision. The budget takes effect with Japan's fiscal year on 1 April 2026, subject to ordinary Diet passage in early 2026.
On 26 December 2025, Japan's Cabinet under Prime Minister Sanae Takaichi approved the FY2026 (Reiwa 8) national budget, which allocates JPY 150 billion (~USD 1bn) to the "Investment Project for Mass Production of Next-Generation Semiconductors" -- a state equity-investment line administered by the Information-technology Promotion Agency (IPA) that funds Rapidus Corporation's 2nm-class logic fab in Chitose, Hokkaido. The FY2026 allocation is 50% larger than the JPY 100 billion IPA equity tranche budgeted for FY2025, taking cumulative government equity in Rapidus to roughly JPY 250 billion. The line sits inside METI's wider AI/semiconductor budget of JPY 1.239 trillion for FY2026 (up roughly 4x year-on-year) under the "AI/Semiconductor Industry Base Strengthening Frame," part of the government's pledge of over JPY 10 trillion in public support for AI and chips through FY2030. The budget takes effect with Japan's fiscal year on 1 April 2026, subject to ordinary Diet passage in early 2026.
On 24 November 2025, six Beijing municipal departments — the Bureau of Economy and Information Technology, Development and Reform Commission, Science and Technology Commission, Health Commission, Drug Administration and Medical Insurance Bureau — jointly issued Notice 京经信发〔2025〕50号 ("Several Measures to Promote High-Quality Development of the Beijing Medical Device Industry"), effective immediately through 31 December 2028. The 15-measure package subsidises the full medical-device value chain: early-stage innovation (up to RMB 1m per project), product approval/launch (up to RMB 2m per product, RMB 10m annual enterprise cap), industrial-park and public-service infrastructure construction (up to 50% of investment, capped at RMB 50m), supply-chain-resilience R&D for critical components/materials (up to 30% of investment, capped at RMB 30m), AI-diagnostic-model development (up to RMB 30m), smart-factory digitalisation (up to 30% of investment, capped at RMB 30m per project), and international regulatory approval/market entry (up to RMB 1m per product, RMB 3m annual cap; up to RMB 10m for introducing overseas products to China).
On 21 November 2025, METI Minister Yoji Akazawa designated Rapidus Corporation as the official next-generation semiconductor manufacturer under Japan's Act on Facilitation of Information Processing (情報処理の促進に関する法律, as amended by the Cabinet-approved partial-amendment bill of 7 February 2025), following a public solicitation run 3 September – 2 October 2025. The designation makes Rapidus eligible for a multi-year METI funding envelope reported at roughly JPY 1tn (~USD 6.4bn), with an initial JPY 100bn equity investment by the Information-technology Promotion Agency (IPA) planned for FY2025; the funds support Rapidus' Hokkaido (Chitose) IIM-1 fab targeting 2nm GAA mass production from April 2027 and successor 1.4nm / 1nm nodes. The action is the first standalone Rapidus entry in the IPTM register and operationalises the supply-chain pillar of the 2022 Economic Security Promotion Act for advanced logic.
The European Commission approved on 6 November 2025 a EUR 700 million Spanish State aid scheme (SA.119884) under the Clean Industrial Deal State Aid Framework (CISAF Section 6.1), to support the build-out of new manufacturing capacity for net-zero technologies listed in CISAF Annex II. The scheme funds direct grants, open Spain-wide and available until 31 December 2028, for investments producing batteries, solar panels, wind turbines, heat pumps, electrolysers, carbon capture/storage/utilisation equipment, and the critical raw materials used to make these components. It is a distinct, larger sister scheme to Spain's EUR 408 million SA.119880 CISAF Section 5 scheme (approved five weeks later), which instead funds decarbonisation of existing industrial processes rather than new clean-tech production capacity.
The European Commission approved a EUR 201.4 million (USD ~231.9 million) Innovation Fund grant for Novo Energy Production AB, funding the "NOVO One" gigafactory project in Gothenburg, Sweden, under the Innovation Fund 2024 Battery call (IF24 Battery). CINEA lists NOVO One's status as "Grant signed," one of five EV battery-cell projects (alongside ACCEPT and AGATHE in France, WGF2G in Germany, and 46inEU in Poland) confirmed under the same call, together worth EUR 643 million, with grant agreements formally signed on 10 November 2025. Novo Energy — originally a 50/50 joint venture between Volvo Cars and Northvolt targeting up to 50 GWh/year of NMC cell capacity — came under Volvo's full ownership in 2025 after Northvolt's bankruptcy left the venture without its battery-technology partner.
On 17 October 2025 Türkiye's Ministry of Industry and Technology opened the "HIT-AI" call, a USD 1.6 billion support tranche under the HIT-30 High Technology Investment Programme (see `2024-07-26-turkiye-hit-30-high-technology- investment-programme`), targeting large-scale IT investments delivering AI services, managed/self-service cloud offerings, and AI-hardware buildouts of at least USD 100 million. The call bundles multiple instruments — tax reduction up to 60%, capex grants up to 40% (with an additional up to 20% grant specifically for AI-hardware investment), concessional financing up to 70%, employment support, and market-development support up to 20% — and was announced alongside a parallel USD 1.5 billion "HIT-Data Centre" call, a USD 300 million "HIT-Quantum" call, and a USD 1 billion "HIT-Industrial Robot" call. Minister Mehmet Fatih Kacır framed the combined package as designed to mobilise USD 10 billion in data-centre and AI investment by 2030, lifting national data-centre capacity from 250 MW to 1 GW.
On 17 October 2025 Türkiye's Ministry of Industry and Technology opened the "HIT-Data Centre" call, a USD 1.5 billion support tranche under the HIT-30 High Technology Investment Programme (see `2024-07-26-turkiye-hit-30-high-technology-investment-programme`), targeting data-centre facilities of at least 30 MW IT capacity with at least 50% AI-compatible hardware and a Power Usage Effectiveness (PUE) of 1.4 or lower. The call was announced alongside three parallel HIT-30 sector calls — a USD 1.6 billion "HIT-AI" call (see `2025-10-17-turkiye-hit-ai-cloud-infrastructure-call`), a USD 300 million "HIT-Quantum" call, and a USD 1 billion "HIT-Industrial Robot" call — and offers the same tax, grant, financing, employment, and market-development instrument stack used across the HIT-30 programme. Global Trade Alert logs this single government call as two separate "interventions" (tax/social insurance relief and unspecified state aid) under state act 95013.
On 17 October 2025 Türkiye's Ministry of Industry and Technology opened the "HIT-Industrial Robot" call, a USD 1 billion support tranche under the HIT-30 High Technology Investment Programme (see `2024-07-26-turkiye-hit-30-high-technology-investment-programme`), targeting manufacturers that commit to a minimum annual production capacity of 5,000 industrial robots and localisation of critical components (servo motors, reducers/gearboxes, servo drives), plus supporting R&D-centre buildout. The call was announced alongside three parallel HIT-30 sector calls — a USD 1.6 billion "HIT-AI" call (see `2025-10-17-turkiye-hit-ai-cloud-infrastructure-call`), a USD 1.5 billion "HIT-Data Centre" call (see `2025-10-17-turkiye-hit-data-centre-call`), and a USD 300 million "HIT-Quantum" call — and offers the same tax, grant, financing, employment, and market-development instrument stack used across the HIT-30 programme. Global Trade Alert logs this single government call as two separate "interventions" (state loan and tax/social-insurance relief) under state act 95018.
The Canada Infrastructure Bank reached financial close on a CAD 660 million (approx. USD 473 million) loan to Irving Pulp & Paper to support "Project NextGen," a CAD 1.5 billion modernization of the company's Kraft pulp mill in west Saint John, New Brunswick — the largest investment in the Canadian forest products industry since 1993. The financing replaces 1970s-era recovery-boiler and steam-turbine technology, adds up to 145 MW of renewable generation capacity (50 MW for mill use, the remainder exported to the provincial grid), and is projected to cut emissions per tonne of Kraft pulp by 50% while eliminating heavy-fuel-oil combustion.
On 19 September 2025, the European Investment Fund (EIF), part of the European Investment Bank Group, signed a EUR 260 million (USD ~305 million) anchor-investor commitment into Jolt Capital V, a growth-stage deep-technology venture capital fund targeting a EUR 1 billion final close. The commitment is funded largely through the European Tech Champions Initiative (ETCI), an EU-backed programme that has committed over EUR 2.5 billion across 11 scale-up technology funds and aims to mobilise EUR 10 billion in total resources for late-stage European tech companies. Jolt Capital V will invest in growth-stage B2B companies across semiconductors, cybersecurity, AI, industry 4.0, new materials and mobility, sectors the EIB Group frames explicitly around European strategic autonomy and competitiveness.
On 17 September 2025 the General Office of the Shanghai Municipal People's Government issued Hufubangui [2025] No. 8, a five-year (26 September 2025 - 25 September 2030) state-aid framework to accelerate frontier-technology innovation and cultivate "future industries" across six domains — future manufacturing, future information, future materials, future energy, future space and future health. Targeted technology areas include cell and gene therapy, brain-computer interfaces, biomanufacturing, embodied intelligence (humanoid robotics/AI hardware), fourth-generation semiconductors, silicon photonics, 6G, neuromorphic computing, quantum technology, controlled nuclear fusion and regenerative medicine. Support is disbursed as tiered direct subsidies rather than tax relief, with named ceilings up to CNY 30 million per proof-of-concept/R&D platform and CNY 20 million per high-quality incubator or first-product/batch innovation award.
On 22 August 2025 South Korea's National R&D Program Evaluation Steering Committee, convened by MOTIE, finalized an exemption from the mandatory preliminary feasibility study (예비타당성조사 면제) for the "K-On-Device AI Semiconductor Technology Development" project, clearing the roughly KRW 689.15 billion (approx. USD 496 million) program to proceed toward FY2026 budget allocation without the standard multi-year vetting delay. The project funds full-stack development — custom AI chip design, software, and modules — across four demand-anchored industries: automotive (Hyundai Motor), IoT/home appliances (LG Electronics), machinery/robotics (Doosan Robotics, Daedong), and defense (Korea Aerospace Industries). MOTIE structured the program so end-user demand companies participated directly in project planning, pairing them with domestic fabless design and foundry manufacturing firms to build a domestic on-device AI semiconductor ecosystem, ahead of full budget confirmation and formal program launch.
The European Commission cleared EUR 264 million (approx. HUF 103 billion) in Hungarian regional investment aid for Hungary Sunwoda Automotive Energy Technology Kft., the local unit of Chinese battery maker Sunwoda Electronic (300207.SZ), to support a EUR 1.43 billion lithium-ion battery-cell plant in Nyíregyháza (Szabolcs-Szatmár-Bereg county). Aid takes the form of a direct cash grant plus a corporate development tax allowance, granted under Hungary's national investment-promotion regime (Government Decree 210/2014, as amended, and Government Decree 165/2014 on the development tax incentive). The Commission found the measure necessary, appropriate and proportionate under Article 107(3)(c) TFEU regional-aid rules and raised no objections; the project is expected to create over 2,500 direct and 470 indirect jobs.
The Union Cabinet chaired by Prime Minister Narendra Modi approved on 12 August 2025 four new semiconductor manufacturing units under the India Semiconductor Mission (ISM) Phase 1: SiCSem Private Limited (Silicon Carbide compound-semiconductor fab, Odisha, with UK partner Clas-SiC Wafer Fab Ltd.), 3D Glass Solutions Inc. (advanced glass-substrate packaging, Odisha), Continental Device India Private Limited / CDIL (discrete power-semiconductor expansion, Punjab), and Advanced System in Package Technologies / ASIP (OSAT unit with South Korea's APACT Co. Ltd, Andhra Pradesh). Cumulative investment INR 4,600 crore (~USD 525mn); 2,034 skilled jobs at full ramp. This brought total approved ISM Phase 1 projects to 10 across 6 states, with cumulative committed investment of approximately INR 1.60 lakh crore (~USD 18bn).
The Henan Provincial People's Government issued "Several Policy Measures to Support Enterprise Science and Technology Innovation" (河南省支持企业 科技创新若干政策措施) on 2025-08-08, effective immediately. The package runs a province-wide "unveil-and-lead" (揭榜挂帅) mechanism publishing 100+ key-technology tender projects per year, targeting 200+ core-technology breakthroughs across priority industrial chains, with per-project support of no less than RMB 10 million. It also commits to RMB 160 billion (approx. USD 22 billion) in new 2025 lending to technology enterprises via the province's manufacturing mid/long-term loan pipeline mechanism.
The Henan Provincial People's Government issued "Several Policy Measures to Support the Development of the AI Industry Ecosystem" (河南省支持人工智能 产业生态发展若干政策措施, Yuzheng [2025] No. 17) on 2025-08-04, effective for three years from issuance. The package establishes a RMB 3 billion (approx. USD 420 million) AI industry investment fund alongside a suite of per-project subsidies: up to RMB 1 million for enterprises passing national generative-AI model filing, an annual RMB 50 million compute-voucher pool (capped at RMB 1 million per recipient), up to RMB 1 million per high-quality training-corpus library, and RMB 2-10 million grants for benchmark application projects, industry-empowerment centres and national-level innovation platforms.
On 28 July 2025 the General Office of the Shanghai Municipal People's Government issued Hufubangui [2025] No. 6, the "Shanghai Embodied Intelligence Industry Development Implementation Plan" (上海市具身智能产业发展实施方案), a dedicated municipal state-aid package to build Shanghai into a global innovation hub for embodied intelligence (humanoid robotics / physical AI). The plan targets an industry scale of CNY 500 billion by 2027, alongside at least 20 core algorithm/technology breakthroughs, four or more high-quality incubators, and "100-100-100" targets for leading enterprises, applications and products. Support is disbursed as tiered direct subsidies capped at CNY 50 million (30% of project cost) for core-technology R&D, CNY 40 million per company per year for computing-power credits, CNY 20 million (50% of cost) for public-platform construction, CNY 10 million (20% of cost) for application-demonstration projects, CNY 5 million per company per year for language-corpus services, CNY 5 million (5% of contract value) for robot sales/rental incentives, CNY 5 million per open-source project, and CNY 1 million per leading enterprise for standards development. Target application sectors are logistics, industrial manufacturing, retail, healthcare/eldercare and domestic services.
Business Finland granted €115.4 million in investment aid under Finland's EU-TCTF-aligned clean transition aid scheme to Easpring Finland New Materials Oy for the construction of a cathode active material (CAM) factory in Kotka. The €800 million total project is a joint venture majority-owned (70%) by China's Beijing Easpring Material Technology Co. Ltd. (300073.SZ), with Finnish Minerals Group (30%) as the Finnish state minority partner. At full capacity of 60,000 tonnes/year the plant will supply CAM for approximately 750,000 EV battery packs annually; first product samples are targeted for summer 2026 with commercial production in 2027.
Japan Bank for International Cooperation (JBIC) signed a loan agreement on 2025-06-30 for up to approximately USD 626 million (JBIC portion) with Mitsui & Co., Ltd. Co-financed with Sumitomo Mitsui Banking Corporation, the total co-financing package reaches approximately USD 1,044 million. Proceeds fund Mitsui's investment in Blue Point Number One, LLC, a low-carbon ammonia production facility under construction in Louisiana using CCS technology to cut over 95% of process CO2 emissions. JBIC frames the loan against Japan's Basic Hydrogen Strategy, Seventh Strategic Energy Plan, and GX2040 Vision, which treat hydrogen and its derivatives as key decarbonization energy sources requiring policy-bank-mobilized capital.
On 2025-06-26, South Korea's National R&D Program Evaluation General Committee approved the preliminary feasibility study (예비타당성조사) for the "Korean-style Hydrogen Reduction Steelmaking Demonstration Technology Development Project," clearing state funding of KRW 308.8 billion (part of a KRW 814.6 billion total project cost) over 2026-2030. The program funds a 300,000-tonne-scale demonstration process using the domestic FINEX process to produce hydrogen-reduced iron and molten iron from iron ore and hydrogen, plus a parallel track for small and mid-sized firms to use hydrogen-reduced iron in existing electric-arc furnaces. The technology targets a 95%+ cut in per-tonne carbon emissions versus blast-furnace steelmaking, positioning Korean steel (POSCO, Hyundai Steel) for the EU CBAM and global green-steel premium markets.
On 23 June 2025, BNDES president Aloizio Mercadante announced that BNDESPAR — the equity-investment arm of Brazil's national development bank — would resume direct variable-income (equity) investing after roughly a decade, committing up to BRL 10 billion (~USD 1.8bn) to companies and funds focused on ecological transition, decarbonization and innovation. The commitment splits into up to BRL 5 billion in direct equity investments (open to applicants through December 2025) and up to BRL 5 billion deployed via investment funds, funded from proceeds of BNDESPAR's sale of mature-company stakes and dividend receipts rather than new fiscal outlay. The bank framed the relaunch as strengthening Brazil's capital markets while directing state capital toward green-economy and innovation targets of all company sizes.
The UK Ministry of Defence announced a £5 billion technology investment package to accelerate domestic defence innovation, split between more than £4 billion (including over £2 billion in new funding) for autonomous systems and nearly £1 billion this Parliament for directed-energy weapons (DEW). The package funds acceleration of the DragonFire high-power laser toward fielding on Royal Navy Type 45 destroyers from 2027, establishment of a new Drone Centre to speed deployment of small uncrewed air systems informed by lessons from Ukraine, and is projected to create 300 skilled jobs on top of 200 already supported by DEW work. The announcement followed the government's Strategic Defence Review published the same day, which recommends UK forces adopt unmanned and autonomous systems at scale over the next five years.
China Chengtong Holdings Group, a SASAC-supervised central state capital operation company, completed business registration of the "Chengtong Science and Technology Innovation Investment Fund (Beijing) Limited Partnership" in late May/early June 2025, jointly capitalised with Sinopec, China Aviation Oil, and the Haidian District Government of Beijing. The fund has a total planned scale of CNY 30 billion (~USD 4.2 billion) with a first-phase scale of CNY 10 billion (~USD 1.4 billion) and a 15-year term. It prioritises "early-stage, small-scale, long-term, hard-technology" equity investment across new materials, advanced manufacturing, and next-generation information technology, targeting industry-leading tech firms, "little giant" specialised-and-innovative enterprises, technology-transfer projects, and upstream/downstream suppliers in central-SOE industrial chains.
On 22 May 2025, Mexico published a decree in the Diario Oficial de la Federación (DOF) granting fiscal incentives to companies that begin operations within newly designated "Polos de Desarrollo Económico para el Bienestar" (PODECOBI) — Economic Development Poles for Welfare. The decree grants a 100% immediate deduction of the original investment amount in new fixed assets, plus an additional 25% deduction for incremental training and innovation expenses, for taxpayers operating in the poles through fiscal year 2030. The Ministry of Economy designates and administers the poles, with a cross-secretarial promotion committee overseeing site selection; 14 zones spanning Campeche, Chihuahua, Durango, Estado de México, Guanajuato, Hidalgo, Michoacán, Puebla, Quintana Roo, Sinaloa, Sonora, Tamaulipas, Tlaxcala and Veracruz are active as of mid-2025. The measure operationalises the "Plan México" nearshoring strategy by concentrating incentives in specific geographic zones rather than applying them nationwide.
South Korea's Ministry of SMEs and Startups announced an additional support package worth approximately KRW 6.6 trillion for export SMEs ahead of the effectuation of US reciprocal tariffs, unveiled 14 May 2025. The package centers on a newly established KRW 4.2 trillion "Crisis Overcoming Special Guarantee" delivered through the Korea Credit Guarantee Fund (KODIT) and Korea Technology Finance Corporation, alongside KRW 0.4 trillion in emergency management-stabilization and trade-risk-response funds, KRW 174.5 billion in export vouchers, KRW 100 billion in additional new-market entry financing, and KRW 10 billion in overseas certification support. Programs were rolled out with fast-track evaluation procedures for tariff-affected firms.
The Legislative Yuan of Taiwan (ROC) passed amendments to Article 10-1 of the Statute for Industrial Innovation (產業創新條例) on third reading on 18 April 2025, promulgated by Presidential Decree on 7 May 2025 and effective for qualifying expenditures incurred from 1 January 2025. The amendment expands the scope of the existing Article 10-1 investment tax credit — previously covering hardware, software, technology, or technical services for smart machinery, 5G network deployment, and cybersecurity — to additionally cover (i) AI products or services and (ii) energy-conservation and carbon-reduction initiatives. The maximum eligible expenditure cap per company per taxable year is doubled from NT$1bn to NT$2bn, and the implementation period is extended through 31 December 2029. Secondary legislation operationalising the amended categories was jointly issued by MOEA and MOF on 27 November 2025 as the "Regulations Governing Tax Credits Claimed for Investments in Smart Machinery, 5G Networks, Cybersecurity, Artificial Intelligence (AI) Products or Services, and Energy Conservation and Carbon Reduction." This is Taiwan's first AI-and-green-tech investment tax credit mechanism in the general-industrial framework, distinct from Article 10-2 (the chip-specific R&D + advanced-equipment credit, "Taiwan Chips Act").
The Union Cabinet approved the Electronics Components Manufacturing Scheme (ECMS) on 28 March 2025, notified by the Ministry of Electronics and Information Technology (MeitY) via Gazette Notification CG-DL-E-08042025-262341 on 8 April 2025. The scheme has an original outlay of Rs 22,919 crore (~USD 2.7bn) over six years (FY26-FY31, with an optional one-year gestation period), raised to Rs 40,000 crore in the Union Budget 2026-27. ECMS targets passive components, multi-layer PCBs, lithium-ion battery cells, camera modules, display assembly, electromechanicals, bare-component sub-assemblies and capital equipment for semiconductor and electronics manufacturing -- the ecosystem feeding the existing large-scale-electronics PLI and the India Semiconductor Mission. The scheme targets investment of Rs 59,350 crore, production of Rs 4,56,500 crore and 91,600 direct jobs.
The Korean National Assembly passed an amendment to the Restriction of Special Taxation Act (조세특례제한법, Act No. 19234) on 30 March 2023, promulgated 31 March 2023 and retroactive to 1 January 2023. The amendment enhanced the investment tax credit (ITC) for "national strategic technology" (국가전략기술) semiconductor facility investment: large companies receive a 15% ITC on qualifying capital expenditure (up from 8% in the December 2022 base version); small and medium enterprises receive 25%. An additional temporary 10% incremental credit applies for annual investment exceeding the prior 3-year average (effective 2023-2025). Internationally termed the "K-Chips Act," the measure directly mirrors the US CHIPS Act's 25% advanced- manufacturing investment tax credit. Principal beneficiaries are Samsung Electronics (Samsung Foundry plus DRAM/NAND capex of KRW 20-30 trillion per year) and SK Hynix (memory fabs at Icheon and Cheongju, HBM expansion). In the same session the National Assembly passed companion legislation on secondary-battery (EV) investment with equivalent credit rates. The Korean government projected annual tax savings for the semiconductor sector of approximately KRW 1-2 trillion.
The Union Cabinet approved the Semicon India Programme on 15 December 2021, establishing the India Semiconductor Mission (ISM) as the nodal agency. The programme offers fiscal support of up to 50% of project cost for silicon semiconductor fabs, compound semiconductor facilities, display fabs, ATMP/OSAT units, and chip design. Total outlay: Rs 76,000 crore (approximately $10.2bn at 2021 exchange rates). By February 2024, the Cabinet had approved three major semiconductor units under ISM: Tata Electronics with PSMC (semiconductor fab, Dholera, Rs 91,526 crore), Tata Electronics OSAT (Morigaon, Assam, Rs 27,120 crore), and CG Power OSAT (Rs 7,584 crore), totalling over Rs 1.26 lakh crore in committed investment from private applicants.
On 1 February 2021, the U.S. Department of Defense announced a USD 30.4 million Defense Production Act Title III technology investment agreement with Lynas USA LLC, the U.S. subsidiary of Australia's Lynas Rare Earths Ltd, to establish domestic light rare earth element (LREE) separation capacity in Hondo, Texas. DOD framed the award as reducing reliance on China for rare earth oxides used in defense and commercial applications; the department projected that, if the Texas facility and Lynas's Malaysian operations are completed as planned, Lynas would supply roughly 25% of world rare earth oxide demand outside China.
The Union Cabinet approved the Production Linked Incentive (PLI) Scheme for Large Scale Electronics Manufacturing on 21 March 2020, with the scheme notified in the Gazette of India on 1 April 2020. Total outlay: Rs 40,995 crore (~$5.5bn) over five years. The scheme extends incentives of 4% to 6% on incremental sales (over FY 2019-20 base year) to eligible companies manufacturing mobile phones (invoice value >= Rs 15,000) and specified electronic components including ATMP units. Approved beneficiaries include Samsung, Foxconn, Wistron, Pegatron, and Indian firms Dixon, Lava, and Bhagwati (Micromax).