Loading…
Loading…
Structured register of government actions in the geoeconomic space — export controls, tariffs, sanctions, FDI screening, subsidies, industrial-policy laws — cross-referenced into the country, minerals, and ETF surface. Charter: docs/IPTM_CHARTER.md.
Severity 1-5 is the qualitative impact rating (1=minor, 5=structural). The bilateral-trade-grounded quant scorer is the next IPTM milestone. RBI (Register Breadth Index) is a complementary structural-breadth indicator from scripts/py/iptm/breadth.py; divergence between RBI and severity is itself informative (high-sev / low-RBI = strategic chokepoint; low-sev / high-RBI = broad but shallow). Every action has at least one primary source URL. Verify-or-don't-file. See also themes, timeline, graph, sankey, map, country exposure, sector exposure, material exposure (+ graph), weekly briefs, portfolio scan, escalation monitor, trans-shipment hubs. Internal triage tools (RSS-poller candidate feed, source-feed health) live under /admin/candidates + /admin/sources. Subscribe via Atom feed (accepts ?country=CN, ?material=lithium, ?issuer=BIS, ?type=export_control, ?etf=SOXX, ?company=NVDA, ?minSeverity=4, ?year=2026, ?q=…) or pull /api/iptm/actions.
On June 8, 2026, the US Department of Defense published its annual update to the Section 1260H Chinese Military Companies (CMIC) list, adding 65 entities (17 new parent companies and 48 subsidiaries), bringing the total to approximately 188–200 designated entities. Major additions span EV and battery manufacturing (BYD, NIO, CATL), consumer internet (Alibaba, Baidu, Tencent), semiconductors (SMIC, YMTC, CXMT), solar (JA Solar, Trina Solar), biotech (BGI Genomics, WuXi AppTec), drones/robotics (DJI, Unitree, RoboSense), and telecoms (TP-Link). Effective June 30, 2026, DoD is prohibited from procuring goods, services, or technology directly from listed entities; effective June 30, 2027, the ban extends to indirect supply-chain procurement through prime contractors and all sub-tiers.
On 13 May 2026, Entreprise Générale du Cobalt (EGC — the DRC state cobalt monopsony), Trafigura Pte Ltd, and EVelution Energy LLC signed a tripartite MOU in Madrid to establish a long-term supply framework for Congolese cobalt hydroxide to the United States. EGC will originate cobalt hydroxide from artisanal and small-scale mining; Trafigura will provide logistics and marketing services; EVelution will process the material into battery-grade cobalt sulfate and alloy-grade cobalt metal at a new first-of-kind commercial-scale refinery in Yuma County, Arizona (construction 2027, target completion 2029). The arrangement is designed to supply approximately 40% of projected US cobalt demand for aerospace, defence, and EV batteries. The MOU operationalises the December 2025 US-DRC Strategic Partnership Agreement at the commercial supply-chain level, creating a primary DRC→US cobalt flow that bypasses Chinese refiners.
USTR formally initiated the second statutorily mandated four-year review of its Section 301 investigation into China's acts, policies, and practices related to technology transfer, intellectual property, and innovation (Federal Register 2026-08806, published May 6, 2026). The review covers tariff actions imposed on approximately $300 billion of Chinese goods across Lists 1–4B (25% on most lists; 7.5% on List 4A) and will determine whether those actions should be continued, modified, or terminated. Interested parties may file continuation requests in two 60-day windows: May 7–July 5, 2026 (for the July 6, 2018 action) and June 24– August 22, 2026 (for the August 23, 2018 action). DISTINCT from the March 2026 Section 301 excess-capacity investigations (which target 16 economies on overcapacity sectors) and from the June 2026 Section 301 forced-labor enforcement action (60 economies); this review is China-specific, IP/TT-focused, and mandated by the original Biden-era statutory clock under Section 304(c) of the Trade Act of 1974.
The Decreto para la Autorización Inmediata de Inversiones, published in Mexico's Diario Oficial de la Federación on 4 May 2026, creates a streamlined investment-authorization mechanism under President Sheinbaum's Plan México strategy. The decree establishes an Investment Committee — composed of the Secretariats of Economía, Hacienda, SEMARNAT, SCT, Energía, and Bienestar — mandated to issue authorization certificates within 30 business days for qualifying projects, replacing the historic 6–18-month multi-agency backlog. Eligibility covers three tiers: projects in designated Polos de Desarrollo Económico para el Bienestar (Welfare Development Poles), investments of MXN 2 billion (≈USD 100M) or more, and projects in strategic sectors (semiconductors, EV batteries, critical minerals, automotive supply chain, medical devices, biotech, aerospace). This is the procedural- acceleration arm of Plan México, structurally distinct from the January 2025 Plan México tax-incentive decree (the fiscal arm), and operationalises the February 2026 Plan México expansion announced by Sheinbaum.
The European Commission and the US announced on 24 April 2026 the signing of a Memorandum of Understanding (MoU) on a strategic partnership on critical minerals, accompanied by an EU-US Critical Minerals Action Plan. The framework deepens cooperation on supply-chain security across the strategic raw-materials list shared between the two jurisdictions — joint financing, recycling, mutual recognition of strategic- project status under the EU Critical Raw Materials Act (filed: 2024-05-23-eu-crma-entry-into-force) and US IRA §30D / §45X frameworks (filed: 2022-08-16-us-inflation-reduction-act). The agreement is positioned as a joint response to non-market practices in third-country supply chains for the named materials.
On 20 March 2026, METI/MOFA (Japan) and the US Departments of State and Energy jointly published the "Japan–United States Critical Minerals Project Cooperation Joint Fact Sheet," identifying five specific upstream critical-mineral projects spanning four continents (Australia, Tanzania, Brazil, UAE, Namibia) to receive structured joint financing through JOGMEC equity and offtake instruments and US DFC/Ex-Im Bank facilities. The document operationalises the October 2025 US-Japan Critical Minerals Framework and the same-day Action Plan, converting policy-framework language into named project commitments covering nickel, lithium, battery-anode graphite, and heavy rare earths. It was released the day following the Takaichi–Trump summit on 19 March 2026 and follows the Critical Minerals Investment Ministerial convened in Tokyo on 14 March 2026.
On 19 March 2026, USTR Ambassador Jamieson Greer and Japan's Ministry of Foreign Affairs, METI, and Ministry of Finance jointly released the "United States-Japan Action Plan for Critical Minerals Supply Chain Resilience" — the operational follow-on to the 27 October 2025 US-Japan Framework. The Action Plan formally commits both governments to develop a plurilateral trade initiative in critical minerals "supported by price floors or other measures", to consult on embedding "border-adjusted price floors" in a binding plurilateral agreement, and to identify specific mining/processing/manufacturing projects in the US, Japan, or third countries for prioritised joint financing. It is the first formal US/Japan trade-policy commitment to administered floor-pricing as an instrument of critical-minerals trade governance, and explicitly invites third countries to join the contemplated plurilateral.
On 10 March 2026, Chile's Ministry of Mining submitted to the Contraloría General de la República the supreme decree establishing the requirements and conditions for a Special Lithium Operating Contract (CEOL) at the Laguna Verde salt flat in the Atacama Region. The CEOL is the third contract under the 2023 National Lithium Strategy and covers a 153 km² concession area across all project phases — exploration, evaluation, construction, production and closure — for a 40-year term. The operator is a consortium led by UK-listed CleanTech Lithium plc (CTL.L), which holds a JORC- compliant resource of 1.9 million tonnes LCE and targets 20,000 t LCE per year at plateau production. Contraloría toma de razón (formal legal ratification) was expected by Q2 2026.
Indonesia's Ministry of Energy and Mineral Resources (ESDM) confirmed it has officially cut the 2026 nickel-ore Work Plan and Budget (RKAB) production ceiling to 260–270 million wet metric tonnes (wmt), down from the ~379 million wmt approved for 2025 — a reduction of roughly one-third. Actual 2026 production is targeted at approximately 209–210 million tonnes. Minister Bahlil Lahadalia framed the cut as a supply-demand balancing measure to stabilise nickel prices and conserve reserves; the government first signalled the production control on 23 December 2025, after which world nickel prices rose from roughly US$14,800/t under oversupply to above US$17,000–18,800/t. This is the operative 2026 application of the annual RKAB cycle established by Permen ESDM 17/2025.
On 12 February 2026, Chile's Ministry of Mining and Codelco (via subsidiary Salar de Maricunga SpA) signed the definitive Contrato Especial de Operación de Litio (CEOL) for the Salar de Maricunga, formalising Rio Tinto as strategic partner with a capital commitment of up to US$900 million. The instrument constitutes the second tranche of Chile's 2023 National Lithium Strategy, distinct from the NovaAndino Litio (Codelco–SQM) JV that governs the Salar de Atacama tranche. Rio Tinto was selected as partner in May 2025 following a competitive process; the definitive CEOL modifies the original 2018 exploration contract, expands the concession area (incorporating pre-1979 concessions acquired from Lithium Power International in 2024), and extends the exploration phase by four years. Remaining conditions precedent — including foreign competition-authority approvals — were projected for completion during 2026.
On 4 February 2026 USTR Ambassador Jamieson Greer and Mexican Secretary of Economy Marcelo Ebrard announced a U.S.-Mexico Action Plan on Critical Minerals — a first-of-its-kind 60-day bilateral work programme to develop coordinated trade policies and supply-chain mechanisms for critical minerals. The Action Plan tasks both governments with identifying a priority mineral list, exploring border-adjusted price floors as a candidate trade instrument, and consulting on how price floors could be incorporated into a binding plurilateral agreement on trade in critical minerals. It is framed as a confidence- building measure ahead of the USMCA Joint Review (statutory deadline 1 July 2026) and as the Mexico-side template that parallels concurrent USTR engagements with the EU and Japan.
On 27 January 2026 President Gabriel Boric presented Chile's National Critical Minerals Strategy (Estrategia Nacional de Minerales Críticos, NCMS) — the country's first horizontal critical-minerals governance framework, identifying 14 minerals as priorities for development and establishing five strategic pillars: production and diversification of critical minerals; responsible mining; development opportunities based on critical minerals; enabling capacities; and strategic international positioning. The strategy was developed through a multi-year participatory process coordinated through Cochilco and Sernageomin, involving a 16-member high-level advisory committee, 120 specialists from 56 institutions, regional workshops and a public consultation. It materially broadens Chile's mineral policy beyond the 2023 lithium-specific National Lithium Strategy to a cross-cutting framework that underpins future bilateral critical-minerals MOUs and positions Chile as a strategic raw-materials partner for the US, EU and Japan under their respective IRA/CRMA/GX supply-chain frameworks.