Loading…
Loading…
Structured register of government actions in the geoeconomic space — export controls, tariffs, sanctions, FDI screening, subsidies, industrial-policy laws — cross-referenced into the country, minerals, and ETF surface. Charter: docs/IPTM_CHARTER.md.
Severity 1-5 is the qualitative impact rating (1=minor, 5=structural). The bilateral-trade-grounded quant scorer is the next IPTM milestone. RBI (Register Breadth Index) is a complementary structural-breadth indicator from scripts/py/iptm/breadth.py; divergence between RBI and severity is itself informative (high-sev / low-RBI = strategic chokepoint; low-sev / high-RBI = broad but shallow). Every action has at least one primary source URL. Verify-or-don't-file. See also themes, timeline, graph, sankey, map, country exposure, sector exposure, material exposure (+ graph), weekly briefs, portfolio scan, escalation monitor, trans-shipment hubs. Internal triage tools (RSS-poller candidate feed, source-feed health) live under /admin/candidates + /admin/sources. Subscribe via Atom feed (accepts ?country=CN, ?material=lithium, ?issuer=BIS, ?type=export_control, ?etf=SOXX, ?company=NVDA, ?minSeverity=4, ?year=2026, ?q=…) or pull /api/iptm/actions.
On 15 December 2025 Rosatom's fuel division (via subsidiary Renera, under managing company TVEL) put Russia's first full-cycle lithium-ion battery "gigafactory" into pilot-industrial operation in the Neman district of Kaliningrad Oblast. Deputy Industry and Trade Minister Mikhail Ivanov disclosed that the project was financed through a comprehensive state-support package: a RUB 5 billion preferential loan from the federal Industry Development Fund (FRP) under its "Avtokomponenty" (auto-components) programme, plus RUB 5 billion in direct subsidies from the Kaliningrad Oblast government, alongside a special investment contract (SPIC) for the project. The facility has a design capacity of 4 GWh/year — enough to supply battery packs for roughly 50,000 electric vehicles — and is described by officials as a step toward Russian "technological sovereignty" in energy-storage manufacturing following the exit of Western and Asian battery suppliers since 2022.
Spain's Ministry of Industry and Tourism awarded InoBat (Slovak battery manufacturer, 25%-owned by China's Gotion High-Tech) a EUR 53.8 million grant plus a EUR 456,000 loan under the third call of PERTE VEC (Programa Estratégico para la Recuperación y Transformación Económica — Vehículo Eléctrico y Conectado), the battery-manufacturing tranche of Spain's EV supply-chain industrial-policy programme. The award, announced by President Pedro Sánchez on 8 September 2025, was to support a planned 32 GWh battery gigafactory in Valladolid (EUR 712m total project investment, 260 direct / ~500 indirect jobs, full capacity targeted for 2029). MINCOTUR later recorded InoBat's withdrawal of the award (~18 November 2025) after the Valladolid project was folded into a larger, Gotion-led initiative.
Korea Trade Insurance Corporation (K-SURE), a Korean government export-credit agency, announced on 4 August 2025 a US$1bn (~KRW 1.4tn) financial guarantee backing LG Chem's construction of a cathode material plant in Clarksville, Montgomery County, Tennessee. The facility is being built in a first phase for roughly KRW 2tn, with 60,000 tons/year of NCMA (nickel-cobalt-manganese- aluminum) cathode capacity — described by K-SURE as the largest cathode material production line in the United States, sufficient for around 600,000 electric vehicles. K-SURE stated this is the first US investment guarantee issued following the Korea-US tariff negotiation, under which Seoul agreed to channel a large bilateral investment package into the United States; the guarantee lets LG Chem access lower-cost, longer-tenor financing from global banks for the project.
The Government of Andhra Pradesh issued G.O.Ms.No.30 (ITE&C Promotion Wing, 1 August 2025) establishing the Electronics Components Manufacturing Policy 2025-30, a dedicated sub-national subsidy framework designed as a 100% matching top-up of the central MeitY Electronics Components Manufacturing Scheme (ECMS). The policy targets INR 4,600 crore (~USD 550 million) in state fiscal outlay against a USD 50 billion production target and USD 10 billion investment target, with a goal of 5 lakh (500,000) first-time jobs over the policy period. Priority components span 11 categories including displays, camera modules, multilayer PCBs, lithium-ion cells, magnetics, capacitors, and resistors, channelled into dedicated electronics zones at Sri City, Hindupur, Orvakal, and Kopparthy.
Business Finland granted €115.4 million in investment aid under Finland's EU-TCTF-aligned clean transition aid scheme to Easpring Finland New Materials Oy for the construction of a cathode active material (CAM) factory in Kotka. The €800 million total project is a joint venture majority-owned (70%) by China's Beijing Easpring Material Technology Co. Ltd. (300073.SZ), with Finnish Minerals Group (30%) as the Finnish state minority partner. At full capacity of 60,000 tonnes/year the plant will supply CAM for approximately 750,000 EV battery packs annually; first product samples are targeted for summer 2026 with commercial production in 2027.
Tamil Nadu Chief Minister M K Stalin launched the Tamil Nadu Electronics Components Manufacturing Scheme (TN-ECMS) on 30 April 2025, making Tamil Nadu the first Indian state to introduce a dedicated state-level electronics components manufacturing subsidy designed to stack on top of the central Electronics Components Manufacturing Scheme (ECMS, notified April 2025). The scheme targets ₹30,000 crore (~USD 3.6 bn) in investment and 60,000 jobs over three to five years, supporting 11 high-growth component categories including HDI/MSAP printed circuit boards, lithium-ion cells, display assemblies, camera modules, SMD passive components, multilayer ceramic capacitors, copper-clad laminates, and capital goods for electronics manufacturing. Investment thresholds are ₹50 crore for basic components and up to ₹250 crore for complex sub-assemblies; matching grants mirror the central ECMS subsidy structure with additional state concessions on stamp duty, land, and electricity costs plus workforce-development incentives.
The Union Cabinet approved the Electronics Components Manufacturing Scheme (ECMS) on 28 March 2025, notified by the Ministry of Electronics and Information Technology (MeitY) via Gazette Notification CG-DL-E-08042025-262341 on 8 April 2025. The scheme has an original outlay of Rs 22,919 crore (~USD 2.7bn) over six years (FY26-FY31, with an optional one-year gestation period), raised to Rs 40,000 crore in the Union Budget 2026-27. ECMS targets passive components, multi-layer PCBs, lithium-ion battery cells, camera modules, display assembly, electromechanicals, bare-component sub-assemblies and capital equipment for semiconductor and electronics manufacturing -- the ecosystem feeding the existing large-scale-electronics PLI and the India Semiconductor Mission. The scheme targets investment of Rs 59,350 crore, production of Rs 4,56,500 crore and 91,600 direct jobs.
The Union Cabinet approved the PM Electric Drive Revolution in Innovative Vehicle Enhancement (PM E-DRIVE) Scheme on 11 September 2024, with the Ministry of Heavy Industries notifying it via Gazette S.O. 4259(E) on 29 September 2024. The two-year programme (1 October 2024 – 31 March 2026) has a total outlay of Rs 10,900 crore (~USD 1.3 bn). It subsumes the EMPS-2024 stop-gap and replaces FAME-II (which expired on 31 March 2024). Demand incentives cover e-2W, e-3W (incl. e-rickshaws and cargo), e-trucks, e-ambulances and e-buses; supply-side outlays fund 14,028 e-buses for state transport undertakings (via CESL aggregation), Rs 2,000 crore for EV public charging stations, and Rs 780 crore for upgrading MHI testing agencies.
The Union Cabinet on 12 May 2021 approved the Production-Linked Incentive (PLI) Scheme "National Programme on Advanced Chemistry Cell (ACC) Battery Storage" with a Rs 18,100 crore (~USD 2.4 bn) outlay over five years to build 50 GWh of ACC and 5 GWh of "Niche" ACC manufacturing capacity in India. Selected bidders receive PLI cash incentives over five years on sale of cells made in India, gated on minimum 25% domestic value addition rising to 60% by year five and chemistry-agnostic eligibility (Li-ion, Na-ion, solid-state, flow, lead-acid). The MHI awarded the first 50 GWh tranche on 24 March 2022 (Hyundai Global Motors 20 GWh, Ola Electric 20 GWh, Reliance New Energy Solar 5 GWh, Rajesh Exports 5 GWh) under a QCBS global tender; the Hyundai Global Motors award was withdrawn after Hyundai Motor Company disowned the bidder in August 2022, triggering a re-tender of the orphaned capacity that completed in 2025.