Loading…
Loading…
Structured register of government actions in the geoeconomic space — export controls, tariffs, sanctions, FDI screening, subsidies, industrial-policy laws — cross-referenced into the country, minerals, and ETF surface. Charter: docs/IPTM_CHARTER.md.
Severity 1-5 is the qualitative impact rating (1=minor, 5=structural). The bilateral-trade-grounded quant scorer is the next IPTM milestone. RBI (Register Breadth Index) is a complementary structural-breadth indicator from scripts/py/iptm/breadth.py; divergence between RBI and severity is itself informative (high-sev / low-RBI = strategic chokepoint; low-sev / high-RBI = broad but shallow). Every action has at least one primary source URL. Verify-or-don't-file. See also themes, timeline, graph, sankey, map, country exposure, sector exposure, material exposure (+ graph), weekly briefs, portfolio scan, escalation monitor, trans-shipment hubs. Internal triage tools (RSS-poller candidate feed, source-feed health) live under /admin/candidates + /admin/sources. Subscribe via Atom feed (accepts ?country=CN, ?material=lithium, ?issuer=BIS, ?type=export_control, ?etf=SOXX, ?company=NVDA, ?minSeverity=4, ?year=2026, ?q=…) or pull /api/iptm/actions.
President Ferdinand R. Marcos Jr. signed Executive Order No. 110 on March 24, 2026, declaring a one-year State of National Energy Emergency in response to Middle East supply disruptions, including potential closure of the Strait of Hormuz, that threaten petroleum import flows to the Philippines. The order activates the Unified Package for Livelihoods, Industry, Food, and Transport (UPLIFT), suspends normal procurement requirements for emergency energy acquisition, grants the Department of Energy (DOE) emergency fuel-import authority, and releases a ₱20 billion emergency fund to secure fuel supply. The emergency regime also mandates accelerated renewable-energy transition and promotion of EVs in public transport to reduce long-run import dependency.
On 3 February 2026 the European Commission opened an in-depth Phase II investigation under the Foreign Subsidies Regulation (FSR) — the second FSR ex officio case and the first targeting the renewable-energy wind-OEM sector — into whether Xinjiang Goldwind Science & Technology Co., Ltd. and its EU affiliates received Chinese foreign subsidies (grants, preferential tax treatment, and state-bank preferential financing) that distort competition for wind-turbine supply and services in the EU internal market. The case (FS.100143) follows the April 2024 preliminary-review opening and subjects Goldwind to an 18-month Phase II investigation with potential redressive-measures decision. The action structurally extends the FSR enforcement perimeter from security equipment (Nuctech, FS.100068) into the green-transition energy-equipment supply chain.
India's Directorate General of Foreign Trade (DGFT Notification No. 40/2025-26, dated 10 October 2025) made pre-import registration mandatory, effective 1 November 2025, for a defined list of solar and wind energy components under the Renewable Energy Equipment Import Monitoring System (REEIMS), run by the Ministry of New and Renewable Energy. Covered items include toughened safety glass and photovoltaic cells/modules (solar) and towers, bearing housings, gearboxes and wind-powered generating sets (wind), identified by specific HS codes. Import policy for these items remains "Free" — registration is an administrative monitoring/traceability layer, not a quota, licence-refusal power, or duty, but it creates a lead-time and port-specific compliance gate on renewable-hardware imports.
On 3 April 2024 the European Commission opened two simultaneous FSR Phase II in-depth investigations — the second and third ever under the Foreign Subsidies Regulation (Regulation 2022/2560) — concerning a Romanian public-procurement procedure for the design, construction and operation of a 454.97 MW EU-co-funded photovoltaic park (Rovinari Est). The first investigation targeted the ENEVO Group consortium including LONGi Solar Technologie GmbH (German subsidiary wholly owned by HK-listed LONGi Green Energy Technology Co., Ltd.); the second targeted Shanghai Electric UK Co. Ltd. and Shanghai Electric Hong Kong International Engineering Co., Ltd. (Chinese SOE). Both respondents withdrew from the procurement procedure after the Commission's opening; the Commission subsequently closed both investigations. This was the first FSR Phase II enforcement action in the renewable-energy / solar-PV sector and the first targeting a private Chinese-listed company's EU subsidiary.