Structured register of government actions in the geoeconomic space — export controls, tariffs, sanctions, FDI screening, subsidies, industrial-policy laws — cross-referenced into the country, minerals, and ETF surface. Charter: docs/IPTM_CHARTER.md.
Severity 1-5 is the qualitative impact rating (1=minor, 5=structural). The bilateral-trade-grounded quant scorer is the next IPTM milestone. RBI (Register Breadth Index) is a complementary structural-breadth indicator from scripts/py/iptm/breadth.py; divergence between RBI and severity is itself informative (high-sev / low-RBI = strategic chokepoint; low-sev / high-RBI = broad but shallow). Every action has at least one primary source URL. Verify-or-don't-file. See also themes, timeline, graph, sankey, map, country exposure, sector exposure, material exposure (+ graph), weekly briefs, portfolio scan, escalation monitor, trans-shipment hubs. Internal triage tools (RSS-poller candidate feed, source-feed health) live under /admin/candidates + /admin/sources. Subscribe via Atom feed (accepts ?country=CN, ?material=lithium, ?issuer=BIS, ?type=export_control, ?etf=SOXX, ?company=NVDA, ?minSeverity=4, ?year=2026, ?q=…) or pull /api/iptm/actions.
On 8 September 2026 President Trump signed an Executive Order, "Adjusting Certain Delegations Under the Defense Production Act," amending EO 13603 (National Defense Resources Preparedness) to split energy-related Defense Production Act authorities that had been held solely by the Secretary of Energy, giving the Secretary of the Interior independent authority over energy matters within Interior's purview. Disputes between the two Secretaries are routed to the National Energy Dominance Council (and, where national-security infrastructure is implicated, jointly to the National Security Council). The order additionally delegates DPA Section 101(c)(1)-(2) authority to the Secretaries of the Interior, Commerce, and Energy, each empowered to exercise it independently of the others. This is a second EO with the same title as the March 13, 2026 order (EO 14391), further reallocating the same delegation structure rather than replacing it outright.
Russia and Kazakhstan signed three intergovernmental agreements on 28 May 2026 during President Putin's state visit to Astana, formalising construction of Kazakhstan's first nuclear power plant at Ulken village on Lake Balkhash. The plant will comprise two VVER-1200 power units (total ~2.4 GW capacity); Russia will provide a state export credit financing ~85% of the estimated USD 14.4 billion construction cost. The IGAs cover: (1) basic principles and conditions of cooperation for construction of the "Balkhash" NPP; (2) state export credit terms; and (3) cooperation in nuclear and radiological safety regulation. Construction is targeted to commence in 2027, with the first unit operational by 2034.
The UK laid the Russia (Sanctions) (EU Exit) (Amendment) Regulations 2026 (SI 2026/543) before Parliament on 19 May 2026; it came into force on 20 May 2026. The instrument inserts a new Chapter 4KA (regulations 46Z23A-46Z23G) into the Russia (Sanctions) (EU Exit) Regulations 2019, prohibiting the import into the UK of uranium (HS 2844.10/2844.20/2844.30) that originates in or is consigned from Russia, the direct or indirect acquisition of Russian-origin or Russia-located uranium, and the supply or delivery of uranium from Russia to a third country — plus associated technical assistance, financial services/funds, and brokering services. Each prohibition carries a criminal offence with a reasonable-cause-to- suspect defence, subject to narrow exceptions and licensing grounds at regulations 16-19 of the amending instrument. The same instrument separately extends the existing ban on imports of relevant (2709-origin) Russian crude to cover oil products refined from that crude in a third country (new regulations 46Z9F-46Z9I).
President Trump issued five Presidential Determinations on 20 April 2026 under Section 303 of the Defense Production Act of 1950 (50 U.S.C. § 4533), invoking the authority granted by Executive Order 14156 (Declaring a National Energy Emergency, signed 20 January 2025). The five determinations cover: (1) domestic petroleum production, refining, and logistics; (2) large-scale energy and energy-related infrastructure development, manufacturing, and deployment; (3) natural gas transmission, processing, storage, and LNG capacity; (4) coal supply chains and baseload power generation; (5) grid infrastructure, equipment, and supply chain. Each determination authorises the relevant Cabinet Secretary (primarily Energy) to use DPA §303 powers — direct loans, loan guarantees, purchase commitments, and equity investments — to expand domestic capacity in the named category.
President Tokayev signed Decree U2600001233 on 15 April 2026, formally adopting the Strategy for the Development of the Nuclear Industry of the Republic of Kazakhstan until 2050. The 30-year framework marks a structural pivot for the world's largest uranium producer (~45% of global mined supply) from a raw-ore export model toward domestic nuclear-energy sovereignty, targeting at least three operational NPPs by 2050 (a fourth under assessment), 5% of national electricity from nuclear by 2035, and 50% combined nuclear and renewables by 2050. The strategy mandates SMR evaluation for regional deployment, a 1% R&D levy on uranium miners' production costs through 2030, and the development of a Kazakh "nuclear cluster" producing high-value fuel-cycle goods and services rather than raw uranium concentrate alone.
On 28 January 2026 the European Commission's CINEA agency allocated a EUR 120.11 million grant to RWE Gas Storage West GmbH under the 2025 Connecting Europe Facility (CEF) Energy call, funding the "Hydrogen Storage Gronau-Epe RWE" project in Germany. The grant converts two existing salt caverns at the Gronau-Epe site to store up to 38 million Nm3 (3,420 tonnes) of renewable hydrogen working gas, and is described by CINEA as the first CEF Energy works grant awarded to a hydrogen project. It is one of 14 cross-border energy infrastructure Projects of Common/Mutual Interest sharing roughly EUR 650 million from the same call round.
On 28 January 2026 the European Commission's CINEA agency allocated a EUR 25.62 million grant to fund the "ACE Terminal Study" in the Netherlands under the 2025 Connecting Europe Facility (CEF) Energy call. The study supports development of an ammonia import and cracking (ammonia-to-hydrogen) terminal in the Port of Rotterdam, a joint venture of Royal Vopak, NV Nederlandse Gasunie and HES International. It is one of 14 cross-border energy infrastructure Projects of Common/Mutual Interest sharing roughly EUR 650 million from the same call round.
On 28 January 2026 the European Commission's CINEA agency allocated a EUR 103.69 million grant to Delgaz Grid SA (Romania), Elektroenergien Sistemen Operator EAD (Bulgaria) and Transelectrica (Romania) under the 2025 Connecting Europe Facility (CEF) Energy call, funding the "CARMEN: Smart Grids Increasing RES and Interconnectivity in the SEE Region" Project of Common and Mutual Interest. The grant supports cross-border smart-grid works to strengthen electricity interconnection and renewable-energy integration between Romania and Bulgaria. It is one of 14 cross-border energy infrastructure projects sharing roughly EUR 650 million from the same call round. CINEA formally awarded the grant certificate for the project on 21 May 2026 at the Energy Infrastructure Forum.
On 28 January 2026 the European Commission's CINEA agency allocated a EUR 62.63 million grant to Slovenské elektrárne a.s. under the 2025 Connecting Europe Facility (CEF) Energy call, funding the "works" phase of the "Modernisation of hydro pumped storage of Čierny Váh" Project of Common Interest in Slovakia. The grant covers 34.3% of eligible costs for upgrading two turbogenerator units (TG1, TG2) of Slovakia's largest pumped-storage plant to variable-speed technology and integrating a large-scale battery energy storage system of up to 80 MW / 160 MWh. It is one of 14 cross-border energy infrastructure projects sharing roughly EUR 650 million from the same call round.
On 28 January 2026 the European Commission's CINEA agency allocated a EUR 180.03 million grant to Repsol Generación Electrica SA under the 2025 Connecting Europe Facility (CEF) Energy call, funding the "Construction of the Reversible Pumped-Storage Hydroelectric Power Plant AGUAYO II" Project of Common and Mutual Interest in Cantabria, Spain. It was the single largest individual allocation of the round and the only pumped-storage project among the 14 cross-border energy infrastructure projects sharing roughly EUR 650 million from the same call. AGUAYO II will support electricity system flexibility and renewable-energy integration; CINEA states it will reduce curtailment of renewable output by an estimated 1,438 GWh/year (about 7.3% of Spain's total curtailed renewables) and cut CO2 emissions by roughly 566,000 tonnes/year by displacing two nearby combined-cycle gas plants. CINEA formally awarded the grant certificate for the project on 21-22 May 2026 at the 12th Energy Infrastructure Forum in Copenhagen. Commissioning is targeted for 31 December 2030.
On 11 December 2025 the Council of the EU presidency, the European Parliament, and the European Commission reached provisional political (trilogue) agreement on the revision of Regulation (EU) 2019/452 establishing a framework for the screening of foreign direct investments into the Union, concluding interinstitutional negotiations on the Commission's proposal of 24 January 2024. The revised regime upgrades the 2019 cooperation-mechanism-only framework into a hybrid harmonised/mandatory regime: all 27 Member States must establish FDI screening mechanisms (replacing the current patchwork in which some Member States have no mechanism at all); mandatory minimum sectoral scope is set EU-wide and covers dual-use items, military equipment, hyper-critical technologies (general-purpose AI with space/defence relevance, quantum technologies, semiconductors), critical raw materials, critical entities in energy/transport/digital infrastructure, electoral infrastructure, and certain financial-system entities; foreign investments routed through EU subsidiaries fall within the perimeter; a shared database prevents Member-State arbitrage; and an optional single electronic-filing portal becomes available if requested by at least nine Member States. Screening decisions remain the exclusive responsibility of the Member State in which the investment is made. Once the Regulation enters into force (after Council and Parliament formal adoption and OJ publication, both pending as of the political-agreement date), the new rules will apply after an 18-month transition period — implementation expected toward the end of 2027.
The European Investment Bank and Commerzbank signed a EUR 500 million line-by-line guarantee agreement under the new Growth for Energy (G4E) programme, the first of its kind in Europe. The EIB covers up to 50% of Commerzbank's risk exposure on qualifying sub-loans (each project under EUR 80 million) to German Stadtwerke municipal utilities financing renewable electricity generation, district heating and electricity grid reinforcement, with the risk-sharing structure expected to mobilise roughly EUR 1.2 billion of total investment in local energy infrastructure to support Germany's Energiewende.
Queensland's Crisafulli Government announced an AUD 200 million North West Energy Fund on 10 October 2025 as part of its five-year Energy Roadmap and the wider CopperString transmission project (AUD 2.4bn budgeted, following identified savings of AUD 2.1bn against the prior government's cost blowout). The Fund is delivered by Queensland Investment Corporation (QIC) and finances local generation, storage, gas, wind and solar projects in the North West Minerals Province -- Mount Isa, Cloncurry, Julia Creek and Richmond -- ahead of CopperString's Western Link. Market sounding with more than 20 organisations began in March 2026, and the Fund formally opened to investor proposals on 1 June 2026, with a requirement that supported projects reach commercial operation or deliver benefits by 2030.
On 26 March 2025 President Mamadi Doumbouya presided over the groundbreaking ceremony for Guinea's first alumina refinery since independence, developed by Chinese state enterprise SPIC International Investment and Development (Guinea) Co. Ltd. in Boffa Prefecture (Koundindhé district). The plant — USD 1.03 billion investment — will process 15 Mt/yr of bauxite into 1.2 Mt/yr of alumina, paired with a 250 MW integrated power plant (100 MW to Guinea's national grid); commercial production is targeted for late 2028. The project operationalises Guinea's Simandou 2040 in-country processing mandate, under which all bauxite concession holders must commit to building alumina refineries or face licence revocation, cementing Chinese-capital control of Guinea's bauxite-to-aluminium value chain.
Government of Russia Resolution No. 1544, signed by Prime Minister Mishustin on 14 November 2024 and published 15 November 2024, amends Resolution No. 313 of 9 March 2022 (the framework counter-sanctions list of goods restricted for export to "unfriendly" jurisdictions) by adding HS code 2844 20 — uranium enriched in U-235 and its compounds — to Annex 2. The amendment imposes a temporary export ban on enriched uranium to the United States and to legal entities incorporated in US jurisdiction, in force from 16 November 2024 through 31 December 2025. Exports are permitted only under one-off licences issued by the Russian Federal Service for Technical and Export Control (FSTEC). The measure is an explicit tit-for-tat response to the US Prohibiting Russian Uranium Imports Act (Public Law 118-50, 13 May 2024).
President Biden signed into law on 13 May 2024 the Prohibiting Russian Uranium Imports Act (Division H of the National Security Supplemental Appropriations Act, Public Law 118-50). The law bans imports to the United States of unirradiated low-enriched uranium (LEU) produced in Russia or by Russian state entities, effective immediately, with a waiver mechanism allowing the Department of Energy to grant case-by-case exceptions through 2027 where no alternative supply is available. The law also authorised up to $2.72B to support US uranium enrichment capacity via CENTRUS and allied enrichment partnerships.