Loading…
Loading…
Structured register of government actions in the geoeconomic space — export controls, tariffs, sanctions, FDI screening, subsidies, industrial-policy laws — cross-referenced into the country, minerals, and ETF surface. Charter: docs/IPTM_CHARTER.md.
Severity 1-5 is the qualitative impact rating (1=minor, 5=structural). The bilateral-trade-grounded quant scorer is the next IPTM milestone. RBI (Register Breadth Index) is a complementary structural-breadth indicator from scripts/py/iptm/breadth.py; divergence between RBI and severity is itself informative (high-sev / low-RBI = strategic chokepoint; low-sev / high-RBI = broad but shallow). Every action has at least one primary source URL. Verify-or-don't-file. See also themes, timeline, graph, sankey, map, country exposure, sector exposure, material exposure (+ graph), weekly briefs, portfolio scan, escalation monitor, trans-shipment hubs. Internal triage tools (RSS-poller candidate feed, source-feed health) live under /admin/candidates + /admin/sources. Subscribe via Atom feed (accepts ?country=CN, ?material=lithium, ?issuer=BIS, ?type=export_control, ?etf=SOXX, ?company=NVDA, ?minSeverity=4, ?year=2026, ?q=…) or pull /api/iptm/actions.
President Trump signed Executive Order 14420 on 26 August 2026, declaring a national emergency under IEEPA and the National Emergencies Act over foreign threats to the US bulk-power system. The order generally prohibits the acquisition, import, transfer, or installation of foreign-produced bulk-power system electric equipment — transformers, inverters, battery storage, generators, circuit breakers, turbines, and industrial control systems, including associated software and remote-access capabilities — where a transaction involves a "Covered Foreign Entity" and poses a risk of sabotage, unauthorized access, or catastrophic disruption to critical infrastructure. Local electric distribution facilities are excluded. No countries or companies are named in the order itself; DOE must publish implementing rules within 120 days (by 24 December 2026) identifying covered equipment and entities, and submit recommended Federal Acquisition Regulation revisions within 180 days.
The White House announced over $2 billion in direct federal investment across eight critical-minerals and battery-material companies, funded through the Department of War (formerly DOD), the Export-Import Bank, and the Development Finance Corporation. The largest awards are $1.4 billion to Sila Nanotechnologies for silicon-carbon battery anodes and lithium-ion cell manufacturing, $400 million to Sunrise Energy Metals for a scandium value chain, and $150 million to Niron Magnetics for rare-earth-free permanent magnet production in Minnesota. An additional $180 million was committed to mining-workforce education across 17 schools.
BIS published a temporary final rule under DPA section 101 (following a Presidential Determination dated July 30, 2026 that recoverable critical minerals and materials are scarce and essential to national defense) requiring U.S. persons to allocate 100 percent of their monthly sales of black mass (shredded lithium-ion battery scrap containing lithium, cobalt, nickel, manganese and graphite) and tungsten waste and scrap to other U.S. persons, effectively barring export of these materials without an explicit BIS adjustment or exception. The order takes effect August 27, 2026, runs for one year through August 27, 2027, and BIS is accepting public comments through November 4, 2026 on whether additional sales requirements are needed. This is the first US DPA/export-control action targeting the recycling and secondary-materials stage of the critical minerals supply chain, rather than primary mining or refining.
On 15 July 2026 India's Ministry of Mines, under Union Minister G. Kishan Reddy, launched the eighth tranche of e-auction of critical and strategic mineral blocks, covering 20 blocks across nine states. The portfolio spans molybdenum, graphite, glauconite, rare earth elements, vanadium, gallium, titanium, tungsten, phosphorite, potash, lithium, caesium and rubidium. Tender documents were available from 15 July to 14 September 2026; technical bids and initial price offers were due 21 September 2026, via a two-stage ascending forward e-auction. This is part of a sustained domestic resource-nationalism programme: seven prior tranches have auctioned 56 of 88 blocks identified for auction since the programme began.
The European Commission adopted Implementing Regulation (EU) 2026/1373 on June 22, 2026, imposing definitive anti-dumping duties on imports of 1,4-butanediol (BDO) originating from China, Saudi Arabia, and the United States. The regulation was published in the Official Journal of the European Union on June 24, 2026. BDO is a chemical intermediate used in engineering plastics (polyurethane, PBT), solvents, and battery electrolyte solvents (gamma-butyrolactone derivative). China is the dominant global BDO producer and the primary source of injurious dumped imports into the EU. The regulation also definitively collects provisional duties previously imposed under Regulation (EU) 2026/270.
On June 17, 2026, at the margins of the G7 Évian summit, Prime Minister Carney and Chancellor Merz issued a bilateral joint statement committing Canada and Germany to a critical-minerals stockpiling partnership with capital investments to be concluded by end-2026. The statement also launches a joint supply chain mapping initiative to identify priority battery-value-chain opportunities, with a specific named project — RCT Solutions (DE) + Sio Silica + Manitoba partners — targeting the extraction and integrated solar manufacturing of 99.9%+ purity silica sand. It builds on the August 2025 CA–DE Declaration of Intent (which established the supply-chain mapping framework and business missions) and extends the relationship into binding capital-deployment commitments.
At the Japan–UK bilateral summit in London on June 14, 2026, Prime Minister Takaichi Sanae and Prime Minister Keir Starmer issued the "Japan–UK Leaders' Joint Declaration on Economic Security Cooperation," committing to deepen collaboration on critical minerals supply-chain diversification (mining, refining, processing, recycling, stockpiling), a focused battery-materials and recycling dialogue, and semiconductor technology cooperation through the Japan–UK Frontier Technology Partnership. The two leaders expressed grave concerns over economic coercion and arbitrary export restrictions on critical minerals and other materials that could affect global supply chains. The declaration preceded and informed the G7 Évian critical-minerals alliance announced three days later on June 17, 2026.
On June 8, 2026, the US Department of Defense published its annual update to the Section 1260H Chinese Military Companies (CMIC) list, adding 65 entities (17 new parent companies and 48 subsidiaries), bringing the total to approximately 188–200 designated entities. Major additions span EV and battery manufacturing (BYD, NIO, CATL), consumer internet (Alibaba, Baidu, Tencent), semiconductors (SMIC, YMTC, CXMT), solar (JA Solar, Trina Solar), biotech (BGI Genomics, WuXi AppTec), drones/robotics (DJI, Unitree, RoboSense), and telecoms (TP-Link). Effective June 30, 2026, DoD is prohibited from procuring goods, services, or technology directly from listed entities; effective June 30, 2027, the ban extends to indirect supply-chain procurement through prime contractors and all sub-tiers.
The DRC Council of Ministers, at its 87th extraordinary session on 29 May 2026, adopted decrees expanding the list of strategic mineral substances from 3 (cobalt, germanium, coltan) to 9, adding lithium, tantalum, niobium, tungsten, uranium, and rare earth elements. Under the 2018 Mining Code framework, strategic minerals attract a 10% royalty versus the standard 3.5% for base metals, representing a nearly threefold increase in the state's royalty take on the newly classified substances. The measure was presented by Minister of Mines Louis Watum Kabamba and confirmed by RTNC state broadcaster and Bloomberg reporting (31 May 2026). DRC produces an estimated 60–70% of global tantalum supply; the reclassification extends upstream royalty escalation to six additional high-value critical materials — including Manono lithium deposit output, tantalum refinery streams, and any tungsten, niobium, uranium, or REE operations active or under development.
Türkiye's Ministry of Commerce published Tebliğ No. 2026/16 on 24 May 2026 (Resmî Gazete No. 33263), completing a final sunset review (NGGS) of the existing anti-dumping measure on un-backed aluminium foil sheets and strips of thickness ≤0.2 mm (HS 7607.11, 7607.19) originating from China. The review, initiated on a petition from domestic producer Assan Aluminum Industry and Trade Inc., found that removal of the measure would likely result in continuation or recurrence of dumped imports and material injury to Turkish domestic industry. The existing 22% CIF ad-valorem anti-dumping duty — first imposed in 2014 (Tebliğ 2014/25) and previously extended in 2019/34 — is maintained for a further five years from 24 May 2026.
On 23 May 2026 President Javier Milei, Economy Minister Luis Caputo, and Chief of Staff Manuel Adorni announced the "Régimen de Incentivo para Grandes Inversiones en Nuevas Industrias" (Super RIGI), and on 26 May 2026 submitted the bill (Mensaje 181/2026, expediente 0005-PE-2026) to the Cámara de Diputados — pending Congressional approval as of filing. The regime applies a US$1 billion minimum investment threshold (with ≥20% committed in the first two years), a 15% corporate income tax rate (vs 25% under the base 2024 RIGI), accelerated depreciation of 60%/20%/20% over three years, immediate export-duty exemption (vs year 3 under RIGI), import-tariff exemption, and 30-year regulatory stability across tax, customs, social security, and FX matters. A progressive FX-liberalisation schedule allows 20% / 40% / 100% free disposal of export-generated foreign currency in years 1 / 2 / 3+. Target sectors are industries that "do not currently exist or are in experimental/pilot phase in Argentina," including semiconductors, AI data centres, advanced biotech, 100% electric vehicles, lithium value chain (downstream processing, cathode, battery), green hydrogen, solar panels, wind turbines, onshore LNG, SMR nuclear, aerospace, uranium value chain, potassium and phosphorus fertilisers, and new petrochemicals.
Zimbabwe's Ministry of Mines and Mining Development gazetted a formal Mineral Classification and Declaration on 22 May 2026, signed by Minister Dr Polite Kambamura, classifying 14 minerals as "critical" (nickel, cobalt, graphite, copper, REE, chrome, PGMs, manganese, antimony, uranium, ruthenium, tungsten, niobium — plus metallurgical coal as "special critical") and 10 as "strategic" (limestone, potash, phosphorus, iron ore, pyrites, oil, gas, coal, gold, diamonds). The declaration mandates minimum state shareholding through designated Special Purpose Vehicles (SPVs) in all critical-mineral exploitation operations and prohibits export of listed minerals in raw or unbeneficiated form without a ministerially-approved conditional transitional plan specifying a local beneficiation timeline.
On 13 May 2026, Entreprise Générale du Cobalt (EGC — the DRC state cobalt monopsony), Trafigura Pte Ltd, and EVelution Energy LLC signed a tripartite MOU in Madrid to establish a long-term supply framework for Congolese cobalt hydroxide to the United States. EGC will originate cobalt hydroxide from artisanal and small-scale mining; Trafigura will provide logistics and marketing services; EVelution will process the material into battery-grade cobalt sulfate and alloy-grade cobalt metal at a new first-of-kind commercial-scale refinery in Yuma County, Arizona (construction 2027, target completion 2029). The arrangement is designed to supply approximately 40% of projected US cobalt demand for aerospace, defence, and EV batteries. The MOU operationalises the December 2025 US-DRC Strategic Partnership Agreement at the commercial supply-chain level, creating a primary DRC→US cobalt flow that bypasses Chinese refiners.
Indonesia's Ministry of Energy and Mineral Resources (ESDM) issued Ministerial Decree No. 144.K/MB.01/MEM.B/2026, effective 15 April 2026, fundamentally restructuring the Nickel Ore Benchmark Price (Harga Patokan Mineral, HPM) formula that governs the minimum domestic transaction price for ore sales from IUP/IUPK miners to downstream processors. For the first time the HPM uses a multi-element comprehensive pricing formula incorporating by-product credits for cobalt, iron, and chromium alongside nickel content, and raises the Correction Factor (CF) for 1.6%-grade ore from 17% to 30% (a ~76% increase), with an inverse-linear ±1% CF adjustment per ±0.1% grade variance. The reform also shifts HPM measurement from dry-metric-ton (US$/dmt) to wet-metric-ton (US$/wmt) with explicit moisture-content deduction, covers 10 minerals including bauxite, and replaces Kepmen ESDM No. 268.K/2025. The measure redistributes economic rent from the downstream Chinese-backed HPAL/RKEF processing complex toward upstream Indonesian miners, tightening margins across Indonesia's ~50%-of-global-supply nickel-ore industry.
On March 29, 2026, the DRC Conseil des Ministres approved a draft decree modifying and supplementing Decree n°11/28 of June 7, 2021, which establishes the statute of the Centre d'Expertise, d'Evaluation et de Certification (CEEC). The reform formally enshrines CEEC as a "certification authority" recognized in law — a role previously exercised in practice but lacking explicit statutory grounding. CEEC gains explicit authority to determine the physicochemical characteristics of all mineral substances produced on DRC territory, covering the nature, chemical composition, geographic origin, and legal provenance of exports across all strategic minerals including cobalt, copper, coltan, cassiterite, gold, and tantalum.
On 20 March 2026, METI/MOFA (Japan) and the US Departments of State and Energy jointly published the "Japan–United States Critical Minerals Project Cooperation Joint Fact Sheet," identifying five specific upstream critical-mineral projects spanning four continents (Australia, Tanzania, Brazil, UAE, Namibia) to receive structured joint financing through JOGMEC equity and offtake instruments and US DFC/Ex-Im Bank facilities. The document operationalises the October 2025 US-Japan Critical Minerals Framework and the same-day Action Plan, converting policy-framework language into named project commitments covering nickel, lithium, battery-anode graphite, and heavy rare earths. It was released the day following the Takaichi–Trump summit on 19 March 2026 and follows the Critical Minerals Investment Ministerial convened in Tokyo on 14 March 2026.
At the PDAC Convention 2026 in Toronto, Canada's Minister of Energy and Natural Resources Tim Hodgson announced the Critical Minerals Sovereign Fund (CMSF), a CAD 2 billion vehicle to be operated by Natural Resources Canada that will deploy equity investments, debt, and offtake agreements into Canadian critical-minerals projects and companies. Initial focus covers six of Canada's 34 critical minerals — copper, nickel, lithium, graphite, cobalt, and rare earth elements — with capital expected to begin flowing in spring 2026. The CMSF is part of a broader CAD 3.6 bn PDAC-day announcement package that NRCan estimates will unlock CAD 12.1 bn in mining-project capital across 30+ partnerships, and is structurally modelled on Australia's Critical Minerals Strategic Reserve.
The European Commission approved France's €1.1 billion state aid scheme (SA.120765) under Section 6.1 of the Clean Industrial Deal State Aid Framework (CISAF), authorising a tax credit (Crédit d'Impôt Industrie Verte — C3IV) for strategic investments that add new cleantech manufacturing capacity in solar PV, onshore and offshore wind technologies, heat pumps, and battery technologies. The scheme is available across the whole of France until 31 December 2028 and is the eighth CISAF cleantech-manufacturing- capacity approval, bringing cumulative CISAF cleantech support to over €10 billion. It is the first CISAF approval delivered via a tax-credit instrument, distinct from the grant-based architectures used in the parallel Germany SA.121215, Greece SA.117469, and Luxembourg SA.120921 approvals.
On 22-23 February 2026, President Félix Tshisekedi signed and publicly read on RTNC (state television) a series of presidential ordinances replacing the entire leadership of three strategic state-owned mining companies: Gécamines (copper/cobalt), SAKIMA (Société Aurifère du Kivu et du Maniema — eastern DRC 3T minerals and gold), and SOKIMO (Société Minière de Kilomoto — Kilo-Moto gold sites). New appointees include Baraka Kabemba as DG of Gécamines, Guy Robert Lukama as DG of SAKIMA, and Yannick Nzonde Mulundu as DG of SOKIMO. The sweeping governance reshuffle came approximately two months after the December 4, 2025 DRC-US Strategic Partnership Agreement on Trade and Investment, signalling a strategic repositioning of DRC state mining apparatus toward a US-aligned critical-minerals framework.
Signed on 11 February 2026 at Mining Indaba (Cape Town) in the presence of DRC Minister of Mines Louis Watum Kabamba, the MoU grants Entreprise Générale du Cobalt (EGC — the DRC state cobalt monopsony) mining rights over an ERG Africa-owned exploitation area in Lualaba Province to pilot a structured artisanal and small-scale mining (ASM) formalisation model covering organised cooperatives, designated ASM zones, controlled buying points, and compliance with safety and labour standards. EGC provides operational leadership and ERG Africa acts as enabling partner; ARECOMS, SEAMAPE, CEEC, and Gécamines provide regulatory and certification support, with GIZ as technical partner. The MoU is the primary public-private implementation vehicle for the December 2025 artisanal processing suspension (`2025-12-19-drc-artisanal-copper-cobalt-processing-suspension`), establishing the re-entry channel through which ASM cobalt supply re-enters formal supply chains under EGC monopsony control.
The Asian Development Bank (ADB) signed a USD 350 million financing package with Gulf Renewable Energy Company Limited (GRE), a subsidiary of Thailand's Gulf Development Public Company Limited (GULF), to fund three renewable-energy projects: two solar-plus-battery energy storage system (BESS) plants totaling 126 MW with 151 MWh of storage, and a 68 MW solar power plant. ADB provided USD 75 million from its own ordinary capital resources and acted as sole mandated lead arranger and bookrunner, mobilizing a further USD 275 million from a DBS Bank B-loan, parallel loans from DEG, Development Finance Institute Canada and Export Finance Australia, and the ADB-administered Leading Asia's Private Infrastructure Fund 2 (LEAP 2). The projects are expected to cut an average of 191,550 tons of CO2 emissions annually, supporting Thailand's 2050 net-zero target.
On 5 February 2026, South Africa's state-owned Industrial Development Corporation (IDC) made a USD 20 million equity investment in Frontier Rare Earths' local subsidiary to fund a Definitive Feasibility Study (DFS) and corporate development for the Zandkopsdrift rare-earths and battery-grade manganese project in the Northern Cape. The investment was announced jointly with a technology supply and offtake agreement between Frontier and France's Carester SAS. The IDC holds an option to offtake up to 10% of Zandkopsdrift production at prevailing market prices, conditional on further downstream processing occurring in South Africa.
Brazil's national development bank BNDES approved BRL 280 million (approx. USD 49m) in financing for WEG S.A. to renovate an existing plant and build new capacity for what BNDES describes as Brazil's largest and most modern battery energy-storage-system (BESS) factory, in Itajaí, Santa Catarina. The operation is the first contract under a joint BNDES/Finep public call for strategic-minerals and energy-transition industrial investment ("Mais Inovação"). Announced 4 February 2026; as of the announcement the financing was approved but not yet formally contracted, so this is filed as `stage: proposed` pending contracting.
On 1 February 2026 Finance Minister Nirmala Sitharaman tabled India's Union Budget 2026-27, with Customs Notification No. 02/2026-Customs (dated 1 Feb 2026, effective 2 Feb 2026) implementing the customs-duty package. The notification zero-rates basic customs duty (BCD) on (i) capital goods imported for domestic processing of critical minerals — crushing, beneficiation, refining, chemical-processing, separation/purification, and metallurgical/alloy-making equipment; (ii) capital goods for lithium-ion cell manufacturing for battery energy storage systems (BESS), extending the 2024-25 EV-cell exemption to stationary storage; and (iii) twelve additional critical minerals plus cobalt powder and lithium-ion battery scrap, on top of the 25 critical minerals already exempted in the FY2024-25 budget. In parallel, critical minerals (including monazite / rare-earth concentrate) are migrated from the customs-exemption notification mechanism into the First Schedule of the Customs Tariff Act at Nil BCD, effective 1 May 2026 — a tariffisation step that locks the rate into primary legislation rather than annually renewable notification. The Budget also commits to dedicated critical-mineral / rare-earth-magnet processing corridors in Andhra Pradesh, Odisha, Kerala and Tamil Nadu. Structurally this is the fiscal/tariff layer underneath the National Critical Mineral Mission (NCMM, Jan 2025) and the National Manufacturing Mission (Feb 2025): NCMM funds capex and overseas asset acquisition (₹34,300 cr), this Budget removes the import-duty drag on the equipment needed to actually run domestic processing lines. It complements the REPM scheme (Nov 2025) for sintered rare-earth magnets and Semicon Mission 2.0 (Feb 2026) on the demand side for refined critical minerals.
NIB, the multilateral development bank owned by the eight Nordic and Baltic member states, signed an 11-year, EUR 21.5 million loan with Solar Park Kvosted ApS, backed by the EU's InvestEU programme, to co-finance a 50 MW/200 MWh battery energy storage system (BESS) addition to the existing 100 MWp Kvosted solar park in Viborg Municipality, Central Jutland. The project is owned by European Energy A/S and converts the site into an integrated hybrid solar-plus-storage asset, one of the largest of its kind in Northern Europe. NIB's below-market development-bank funding cost functions as a state-adjacent subsidy for Danish renewable-energy infrastructure buildout.
On 28 January 2026 the European Commission's CINEA agency allocated a EUR 62.63 million grant to Slovenské elektrárne a.s. under the 2025 Connecting Europe Facility (CEF) Energy call, funding the "works" phase of the "Modernisation of hydro pumped storage of Čierny Váh" Project of Common Interest in Slovakia. The grant covers 34.3% of eligible costs for upgrading two turbogenerator units (TG1, TG2) of Slovakia's largest pumped-storage plant to variable-speed technology and integrating a large-scale battery energy storage system of up to 80 MW / 160 MWh. It is one of 14 cross-border energy infrastructure projects sharing roughly EUR 650 million from the same call round.
On 16 January 2026 the Yunnan Provincial People's Government issued Yunzhengfa [2026] No. 2, a package of 34 policy measures (effective through 2030) to support high-quality development of the Central Yunnan New Area (滇中新区), a national-level new area centred on Kunming. The measures span industrial upgrading, innovation, opening-up and fiscal/land support: transformation of traditional petrochemical and metallurgy industries into "hundred-billion-yuan" clusters, development of semiconductor materials/equipment, new-energy battery materials and non-ferrous/rare-precious-metals manufacturing using Yunnan's mineral and plateau-agriculture resources, and cultivation of low-altitude economy, biomanufacturing and new-materials industries. It also seeks to establish a South/Southeast Asia aircraft-delivery centre and one-stop aviation-maintenance base in the new area.
On 15 January 2026, Canada Growth Fund Inc. (CGF), a CAD 15bn federal Crown investment vehicle, announced it will lead an up to US$85 million structured financing for Mangrove Water Technologies Ltd. (Mangrove Lithium), a British Columbia-based lithium refiner. CGF's own commitment is up to US$65 million, alongside continued participation from existing investors Breakthrough Energy Ventures and BMW i Ventures; the CGF tranche closed concurrently with a separate CAD 9 million loan from National Bank of Canada backed by the federal Clean Technology Manufacturing Investment Tax Credit. Proceeds commission Mangrove's 1,000-tonne-per-annum Single Stack Plant in Delta, BC and advance development of a planned 20,000-tonne-per-year full-scale plant, with the government citing the deal as reducing reliance on overseas lithium processing and building an onshore mining-to-refining supply chain.
On 9 January 2026, Société Nationale des Mines (SONAMINES SA), Cameroon's state mining company, launched an international call for expressions of interest to pre-select technical and financial partners for the development of the Nkamouna-Lomié cobalt-nickel-manganese project in East Region (Haut-Nyong department), with a submission deadline of 31 March 2026. The tender follows the Presidential Decree of 25 February 2025 withdrawing Mining Permit No. 33 from Geovic Cameroon SA (inactive since 2003) and transferring it to SONAMINES under Loi n°2023/014 portant Code Minier. The deposit holds an estimated 121 million tonnes of mineral resources at average grades of 0.23% Co, 0.65% Ni, and 1.35% Mn — one of the largest undeveloped cobalt-nickel-manganese assets in West/Central Africa — with initial investment estimates of approximately CFA 300 billion (~USD 490 million).
Egypt's Ministry of Investment and Foreign Trade, via GOEIC Export Circular No. 2 of 2026, renewed for a further year (2 January 2026 - 1 January 2027) the restriction limiting exports of lead-acid battery parts and separators (HS 85079010) to companies whose industrial register confirms them as actual producers of lead battery parts, with non-producing exporters and intermediary trading/export offices barred from handling the tariff line. The measure also continues an export duty of EGP 3,000/tonne on the category. It is the latest annual renewal of a policy first introduced as an outright export ban in September 2023 and converted to a fee-plus- producer-only restriction in 2024.