Loading…
Loading…
Structured register of government actions in the geoeconomic space — export controls, tariffs, sanctions, FDI screening, subsidies, industrial-policy laws — cross-referenced into the country, minerals, and ETF surface. Charter: docs/IPTM_CHARTER.md.
Severity 1-5 is the qualitative impact rating (1=minor, 5=structural). The bilateral-trade-grounded quant scorer is the next IPTM milestone. RBI (Register Breadth Index) is a complementary structural-breadth indicator from scripts/py/iptm/breadth.py; divergence between RBI and severity is itself informative (high-sev / low-RBI = strategic chokepoint; low-sev / high-RBI = broad but shallow). Every action has at least one primary source URL. Verify-or-don't-file. See also themes, timeline, graph, sankey, map, country exposure, sector exposure, material exposure (+ graph), weekly briefs, portfolio scan, escalation monitor, trans-shipment hubs. Internal triage tools (RSS-poller candidate feed, source-feed health) live under /admin/candidates + /admin/sources. Subscribe via Atom feed (accepts ?country=CN, ?material=lithium, ?issuer=BIS, ?type=export_control, ?etf=SOXX, ?company=NVDA, ?minSeverity=4, ?year=2026, ?q=…) or pull /api/iptm/actions.
The National Assembly of the Republic of Korea passed on 27 December 2024 a comprehensive amendment to the Act on Prevention of Divulgence and Protection of Industrial Technology (산업기술의 유출방지 및 보호에 관한 법률, the "ITA" or "Industrial Technology Protection Act"), effective 22 July 2025. The amendment grants MOTIE direct statutory authority to block or reverse unapproved exports and overseas transactions involving National Core Technologies (NCTs) — including M&As, technology-transfer transactions, and foreign-investment events — without requiring interdepartmental coordination that was necessary under prior enforcement-decree authority. Entities already verified as NCT holders must complete formal registration with MOTIE within six months of the effective date (by approximately 22 January 2026). Punitive damages for wilful NCT infringement are raised from 3x to 5x actual damages, and criminal fines for overseas NCT leakage are raised from KRW 1.5 billion to KRW 6.5 billion.
The Republic of Korea's National Assembly passed the Framework Act on the Development of Artificial Intelligence and the Establishment of a Foundation for Trustworthiness ("AI Basic Act") in plenary session on 26 December 2024, consolidating 19 separate AI bills tabled in the 22nd National Assembly. The statute was promulgated on 21 January 2025 and takes effect on 22 January 2026 after a one-year preparation period. Korea becomes the second jurisdiction worldwide — after the EU AI Act — to enact a comprehensive horizontal AI law, and the first in the Asia-Pacific. The Act establishes a risk-tiered regime targeting "high-impact" AI in healthcare, energy, public services, employment decisions, and generative-AI labelling, with extraterritorial reach over foreign providers whose systems affect the Korean market or users (mandatory local representative). It creates an AI Safety Institute, a national AI policy "control tower," and R&D / standardisation programmes under MSIT. Penalties are modest by international comparison — fines up to KRW 30 million plus a one-year grace period before full enforcement.
Mauritania's Loi n°2024-045 of 18 December 2024 establishes a horizontal local-content statutory framework covering the mining, hydrocarbons, gas, and energy sectors. The law requires operators and their subcontractors to submit triennial forecasting plans and annual performance reports on national employment and local-supplier integration, and mandates a Conseil National du Contenu Local to develop national strategy and policy. An implementing decree approved by the Council of Ministers on 2 September 2025 operationalises the law's institutional architecture, creating a digital monitoring platform for centralised employment and subcontracting traceability and introducing performance-incentive and administrative-sanction regimes.
On 16 December 2024 the Council of the European Union adopted Council Regulation (EU) 2024/3192 amending Regulation (EU) 833/2014, the 15th package of restrictive measures against Russia. The package adds 84 asset-freeze listings (54 individuals and 30 entities) under Regulation 269/2014 — for the first time including fully-fledged designations of seven Chinese individuals and entities supplying drone components, machine tools, and dual-use goods to the Russian military-industrial complex. It expands the EU shadow-fleet vessel- ban list by 52 tankers (total 79), activates the standalone EU hybrid- threats sanctions regime with its first 16-individual / 3-entity designations, extends the wind-down derogation for divestment from Russian subsidiaries to 31 December 2025, and reinforces anti- circumvention contractual clauses on EU exporters of dual-use goods.
UAE Cabinet Decision No. 142 of 2024, announced 9 December 2024 and formally gazetted 11 February 2025, introduces a Domestic Minimum Top-Up Tax (DMTT) on UAE constituent entities of Multinational Enterprise (MNE) groups with consolidated annual revenues ≥ EUR 750 million in at least two of the four preceding fiscal years. The DMTT ensures a 15% minimum effective tax rate (ETR) on UAE-source profits, functioning as a Qualified Domestic Minimum Top-up Tax (QDMTT) under the OECD/G20 Pillar Two GloBE framework, thereby giving the UAE first-priority taxing right before any IIR top-up by a parent-jurisdiction authority. The measure applies to fiscal years beginning on or after 1 January 2025. The UAE deliberately excluded the Income Inclusion Rule (IIR) and Under-Taxed Profits Rule (UTPR) from this primary instrument, deferring those to subsequent Cabinet Decisions; the QDMTT-only architecture mirrors Singapore's MEMTA and Switzerland's MindStV as the first-mover design choice for established low-tax financial hubs.
The National Upstream Petroleum Local Content Policy (NUPLCP), approved by Namibia's Cabinet in December 2024 and finalised by the Ministry of Mines and Energy in March 2025, requires all upstream petroleum operators to submit Local Content Plans detailing Namibian workforce hiring, skills transfer, and local supplier engagement commitments as a condition of exploration and production licences. The policy is the primary industrial-policy instrument governing Namibia's nascent offshore oil sector, targeting the Orange Basin deepwater blocks (PEL 39, PEL 56, PEL 83, PEL 85, PEL 90, PEL 91) where Shell, TotalEnergies, Galp, Chevron, ExxonMobil, and QatarEnergy have confirmed ~11+ billion barrels of recoverable resource with a 2027–2029 FID horizon and projected peak output of ~700 kbpd by 2030+. Enforcement is initially guidance-based with a dedicated monitoring framework under development; critics note weak enforcement infrastructure as the principal implementation risk.
Vietnam's 15th National Assembly adopted Law No. 54/2024/QH15 on Geology and Minerals on 29 November 2024 (446 of 448 votes), promulgated by Presidential Order on 20 December 2024 and effective 1 July 2025 (Articles 110.2 and 110.3 effective earlier on 15 January 2025). The law replaces the 2010 Mineral Law and introduces a four-group mineral classification, with Group I — covering metallic minerals (including rare earths), energy minerals, precious/semi-precious stones, and industrial minerals — placed under state-controlled licensing, national master-plan approval by the Prime Minister, and a "supply-the-domestic-industrial-ecosystem" priority that operates as a de-facto export curb on raw and minimally-processed strategic minerals. Vietnam holds the world's second-largest rare-earth reserves after China, making the new statute a foundational instrument for a state-controlled midstream gateway in non-China REE supply.
Regulation (EU) 2024/3015 of the European Parliament and of the Council of 27 November 2024 establishes the first EU-wide binding prohibition on placing, making available on, or exporting from the EU single market any products made with forced labour at any stage of production, manufacture, harvest, extraction or processing. The regulation is cross-sector and horizontal — no sectoral exemptions apply. It entered into force on 13 December 2024, with a phased implementation schedule; procedural and institutional framework provisions apply from 13 December 2024, while full operational application begins on 14 December 2027. The regulation empowers national competent authorities (and the Commission for state-imposed forced-labour cases involving third countries) to investigate, require withdrawal, and order destruction of non-compliant goods, and establishes a Commission-maintained publicly accessible database of high-risk geographic areas, sectors, and products.
Mongolia's State Great Hural adopted a comprehensive package of amendments to the 2009 Nuclear Energy Law on 21 November 2024 (approved by 68.1% of votes), restructuring the country's uranium-sector governance across three principal axes. The amendments introduce a dynamic three-tier uranium royalty framework — 5% basic (AMNAT) + 5% special + 0–9% price-linked incremental royalty, yielding approximately 14–19% aggregate — that replaces a flat-rate structure with a price-elastic mechanism designed to capture uranium supercycle upside for the Mongolian state. The law also prohibits export of radioactive minerals in raw ore form (mandatory domestic processing to at least yellowcake/U₃O₈ before export), prohibits import, transit, and disposal of foreign spent nuclear fuel in Mongolia, and provides the parliamentary legal underpinning for the ~USD 1.6 billion Orano (France)– Mongolia state investment agreement on the Zuuvch-Ovoo in-situ-leach uranium deposit (Dornogovi province), signed October 2024, targeting first production in 2028 with eventual ramp-up to ~2,500 t/yr uranium output.
Government of Romania Decision (Hotărârea de Guvern) nr. 1464 of 21 November 2024, published in Monitorul Oficial Part I no. 1212bis of 3 December 2024, approves Romania's first National Strategy for Non-Energy Mineral Resources for the 2025-2035 period. The strategy is an 11-year programmatic public-policy framework spanning geological research, inventory and evaluation of critical + strategic raw materials, exploitation and advanced processing, environmental restoration of mining areas, superior valorisation of secondary resources from waste dumps and tailings ponds, geothermal water utilisation, and spa-tourism diversification. The strategy serves as Romania's domestic implementation framework under the EU Critical Raw Materials Act (Regulation 2024/1252) and is the parent authority under which Romania submitted the three CRMA Strategic-Project applications approved by the European Commission on 25 March 2025 (Euro Sun Mining gold/copper at Rovina, Salrom salt + lithium, Verde Magnesium magnesium recovery from tailings) totalling approximately €615m of investment.
Government of Russia Resolution No. 1544, signed by Prime Minister Mishustin on 14 November 2024 and published 15 November 2024, amends Resolution No. 313 of 9 March 2022 (the framework counter-sanctions list of goods restricted for export to "unfriendly" jurisdictions) by adding HS code 2844 20 — uranium enriched in U-235 and its compounds — to Annex 2. The amendment imposes a temporary export ban on enriched uranium to the United States and to legal entities incorporated in US jurisdiction, in force from 16 November 2024 through 31 December 2025. Exports are permitted only under one-off licences issued by the Russian Federal Service for Technical and Export Control (FSTEC). The measure is an explicit tit-for-tat response to the US Prohibiting Russian Uranium Imports Act (Public Law 118-50, 13 May 2024).
South Korea's Ministry of Trade, Industry and Energy (MOTIE), in coordination with the Ministry of Strategy and Finance, announced on 15 November 2024 amendments to the Foreign Exchange Transactions Act and the Industrial Technology Protection Act introducing a notification + review regime for outbound investments by Korean firms in advanced semiconductor manufacturing or critical-component production in "strategic concern" jurisdictions, principally China. The regulation, effective 1 April 2025, requires Korean firms whose technology is designated as a "national core technology" (NCT) to obtain MOTIE approval before establishing or expanding overseas manufacturing facilities using that technology. The list includes Samsung's HBM, SK Hynix's DRAM/NAND advanced-node processes, and certain silicon-wafer technologies.
Türkiye's Ministry of Energy and Natural Resources (ETKB) published the YEKA GES-2024 tender specification in Resmî Gazete No. 32712 on 4 November 2024, allocating 800 MW of utility-scale solar PV capacity across six Renewable Energy Resource Areas (Bor/Niğde, Hisarcık/Kütahya, Tefenni/Burdur, Kayseri, Kahramanmaraş, Hilvan/Şanlıurfa) with 49-year land-use rights and 15-year USD-denominated power-purchase agreements through EÜAŞ. The auction concluded in January 2025 at a record-low ceiling price of USD 3.25 c/kWh, re-activating the YEKA pipeline after a multi-year pause and signalling a ~2 GW/year cadence through 2035 to meet the National Energy Plan target of 52.9 GW installed solar capacity by 2035. The specification includes local-content scoring and domestic-manufacturing commitments that shape foreign EPC and module-supplier access to the Turkish utility-scale solar market.
On 18 October 2024 the Government of the Republic of Kazakhstan approved Government Resolution No. 868 adopting the Concept of Investment Policy of the Republic of Kazakhstan until 2029. The Concept sets a binding strategic-document target to attract at least US$150 billion in foreign direct investment over 2024-2029 and to raise fixed-capital investment from approximately 15.1% of GDP (2023) toward 23-25.1% of GDP by 2029. Its principal new instruments are (i) Development Bank of Kazakhstan (DBK / BDK) concessional lending at 6% interest for a 10-year tenor for the engineering infrastructure of new industrial projects, (ii) regional investment headquarters (one per oblast) modelled on the existing national Investment Headquarters under the Prime Minister, (iii) a national digital investment platform (invest.gov.kz) for streamlined permitting and investor aftercare, (iv) a unified register of investor issues and complaints administered by the Ministry of Foreign Affairs as the designated FDI-attraction owner, and (v) counter-obligations (localisation, employment, technology transfer) imposed on recipients of state preferences. The Concept is the principal implementing instrument under the 2021 Law on Industrial Policy (Law No. 86-VII ZRK) on the investment-attraction side and is designed to operate alongside the 2023 REE Comprehensive Plan and the 2025 Subsoil Code amendments on the minerals-extraction side.
On 11 October 2024, the Secretary of the Treasury — acting in consultation with the Secretary of State and pursuant to section 1(a)(i) of Executive Order 13902 — determined that the petroleum and petrochemical sectors of the Iranian economy are sectors of strategic concern, exposing non-US persons that operate in or knowingly facilitate significant transactions with those sectors to secondary sanctions and SDN-listing risk. The determination was issued in response to Iran's 1 October 2024 ballistic- missile attack on Israeli targets and was formally published in the Federal Register on 19 November 2024 (FR Doc 2024-26800). Concurrent with the determination, OFAC designated an international network — including Sepehr Energy Jahan Nama Pars — that had shipped millions of barrels of Iranian crude on behalf of Iran's Armed Forces General Staff to the People's Republic of China.
Bulgaria's Ministry of Economy and Industry, in partnership with the European Commission Structural Reform Support Directorate and contractor Ernst & Young Bulgaria, launched development of the National Industrial Strategy for Manufacturing and Mining Industry Sectors 2025-2030 on 10 October 2024. The strategy covers Bulgaria's two most carbon- and energy-intensive economic sectors — manufacturing and extractive industries — and integrates EU Critical Raw Materials Regulation, Net Zero Industry Act, and Carbon Border Adjustment Mechanism provisions into a national strategic framework. Expected adoption by end of 2026, it will be Bulgaria's first comprehensive post-EU-CRMA sectoral industrial-policy framework for mining and manufacturing, and closes a structural gap in the country's industrial policy architecture.
On 8 October 2024 Botswana's National Assembly assented to the Mines and Minerals (Amendment) Act No. 14 of 2024, the most significant rewrite of the country's mining statute (Cap. 66:01, 1999) in over two decades. The Act commenced on 1 October 2025 via Statutory Instrument 120 of 2025 and introduces five structurally significant provisions: a mandatory 24% citizen/local-investor equity participation in new mining concessions (if the state elects not to take the stake itself), a broadened "controlling interest" definition capturing indirect offshore transactions, enhanced ministerial licence-transfer approval requirements, strengthened environmental rehabilitation obligations, and an in-country beneficiation push. The measure closes the offshore-transaction loophole that previously allowed indirect change-of-control via Mauritius/BVI/Singapore SPVs to bypass ministerial approval, and operationalises Botswana's resource-nationalism turn alongside the companion February 2025 De Beers / Debswana commercial renegotiation.
The Cook Islands government promulgated the Seabed Minerals (Minerals Harvesting and Other Mining) Regulations 2024 (Serial 2024/11), entering into force 1 October 2024, as the first statutory framework enabling commercial-scale polymetallic-nodule harvesting in the Cook Islands' 1.96 million km² EEZ — one of the world's largest documented manganese-nodule provinces estimated at ~6.7 billion metric tonnes. The Regulations were issued by the SBMA under the Seabed Minerals Act 2009 and establish the licensing pathway, environmental-assessment standards, royalty-and-benefit-sharing framework, production-licence application criteria, and operator financial-assurance requirements for the commercial harvesting tier. The government has stated that only exploration activities are currently permitted and that harvesting licences will not be granted until a science-based environmental decision has been made; the Regulations nonetheless create the legal architecture that would activate commercial extraction, structurally peer to Norway's June 2024 Arctic seabed-mining opening and ahead of the stalled ISA Mining Code negotiations.
MOTIE brought the 35th amendment of the Public Notice on Trade of Strategic Items into force on 9 September 2024, adding 243 items (notice Annex 2-2 numbers 1160-1402) to the situational-licence list for Russia and Belarus, taking that list to 1,402 items. The added items are described as having a high likelihood of military diversion (metal-cutting machinery, machine-tool parts, optical-equipment parts, sensors). Exports of the added items are prohibited in principle from 9 September, with licence applications admitted only for contracts concluded by 8 September and case-by-case categories such as exports to Korean companies' local subsidiaries. The same release tightens administrative penalties for deliberate export-control violations.
Germany's Federal Ministry for Economic Affairs and Energy published the "Bundesförderung Industrie und Klimaschutz" (BIK) funding guideline on 23 August 2024 and opened the first funding call on 30 August 2024, making roughly EUR 3.3 billion available through 2030 — financed from the Klima- und Transformationsfonds (KTF) — to decarbonise industrial SMEs and large manufacturers. Module 1 funds decarbonisation investment and R&D projects up to EUR 200 million per project; Module 2 funds carbon capture, utilisation and storage (CCU/CCS) investment (up to EUR 30 million) and research (up to EUR 35 million) projects. A second funding call opened in January 2026, and individual awards under the programme — including a EUR 140 million grant to Hüttenwerke Krupp Mannesmann GmbH for its EAF2HKM electric-arc-furnace steel-decarbonisation project — have since been logged as state aid by Global Trade Alert.
On 2 August 2024, President Luiz Inácio Lula da Silva sanctioned Lei nº 14.948/2024 (with partial veto, Mensagem nº 741) at a ceremony in the Pecém Industrial-Port Complex in Ceará, following Senate and Chamber approval of PL 2308/2023; the law was published in the Diário Oficial da União on 5 August 2024. The statute establishes Brazil's first comprehensive legal framework for low-carbon hydrogen: it (i) creates the National Low-Carbon Hydrogen Policy (PNH2BC) under the National Energy Policy umbrella, (ii) sets a statutory definition of "low-carbon hydrogen" as fuel/industrial input with lifecycle GHG intensity ≤ 7 kg CO₂e/kg H₂, (iii) institutes the Brazilian Hydrogen Certification System (SBCH2) for origin and emissions accreditation, (iv) creates the Special Incentive Regime for Low-Carbon Hydrogen Production (Rehidro), suspending PIS/Pasep and Cofins for five years on capital-goods, raw-materials and services purchases by qualified producers, and (v) authorises the Programa de Desenvolvimento do Hidrogênio de Baixa Emissão de Carbono (PHBC) — a tax-credit envelope capped at BRL 18.3 bn between 2028 and 2032 (subsequently regulated by Lei nº 14.990/2024 sanctioned 30 September 2024). ANP gains regulatory authority over hydrogen transportation, storage and import/export licensing, while the law amends Leis nºs 9.427/1996 (ANEEL) and 9.478/1997 (Petroleum Law) to integrate hydrogen into the energy-policy and electricity-regulation framework. Industry reporting at sanction cited >USD 30 bn in announced project pipeline, concentrated in Northeast renewable-rich states (Ceará, Bahia, Pernambuco, Rio Grande do Norte) leveraging Pecém, Suape and Açu as hydrogen-derivative export terminals.
Decree 0977, signed 2 August 2024 by the Petro administration, regulates Article 231 of the National Development Plan (Law 2294/2023) by adding Chapter 12 to Title V, Part 2, Book 2 of Decreto 1073 de 2015, the consolidated mining-and-energy regulation. The decree creates a new state-managed territorial category — Distritos Mineros Especiales para la Diversificación Productiva — split into two tracks: "Distritos Mineros para la Vida y la Paz" (zones of high informal-mining presence, formalisation focus) and "Distritos Mineros para la Transición Energética Justa" (decarbonisation and productive-reconversion focus, principally coal phase-out zones). The decree restructures where, how, and under what licensing terms large-scale mining is permitted in Colombia, the world's #1 thermal coal exporter to Europe and a major LatAm producer of gold, copper and nickel.
On 26 July 2024 President Erdoğan unveiled the HIT-30 (High-Technology Investment Programme), Türkiye's largest single industrial-finance instrument since the 2018 Investment Office reform, allocating USD 30 billion in state support over 2024-2030 to attract investment across 37 priority programmes spanning electric vehicles, batteries, semiconductors, solar/wind energy, green hydrogen, hyperscale data centres, biotechnological medicine, industrial robotics, and R&D. The Ministry of Industry and Technology is the operating agency, with the Industrialization Executive Committee chaired by the President providing high-level oversight; an Industrialisation Executive Committee under the President directs sectoral allocations. Headline tools include USD 4.5bn earmarked for an 80 GWh battery-manufacturing capacity (with USD 6,000/MWh grants through 2030), USD 2.5bn for 15 GW of domestic solar-cell capacity, USD 1.7bn for wind-component manufacturing, USD 1bn for top-1000 corporate R&D centre support (covering 50% of personnel costs for 5 years), corporate tax reductions, social-security-contribution coverage, energy-cost subsidies covering 50% of bills for energy-intensive projects, customs/VAT exemptions, and free or discounted land allocation in organised industrial zones. Programme targets at least USD 20bn in private-sector co-investment.
Mauritania enacted Loi n°2024-037 — the world's first standalone national Green Hydrogen Code — creating a dedicated legal and fiscal framework for the development, production, export and processing of green hydrogen and its derivatives (green ammonia, green methanol, green steel). The law establishes the Agence Mauritanienne pour l'Hydrogène Vert (AMHV) as regulator and one-stop-shop for project licences, grants comprehensive fiscal incentives including full VAT exemption on equipment imports and zero export tax on hydrogen exports, and provides a 30-year fiscal-stability undertaking to qualifying investors. The Code underpins a cumulative project pipeline estimated at USD 40 billion and positions Mauritania as the lead jurisdiction for the proposed Mauritania-EU green-hydrogen export corridor under the CBAM-compatible flag.
On 5 July 2024 Mozambique's Ministry of Mineral Resources and Energy (MIREME) issued Diploma Ministerial nº 55/2024, the first regulation to operationalise the local-content obligations of petroleum-sector concessionaires that were set in skeleton form by Lei nº 21/2014 (Petroleum Law) and Decreto nº 34/2015 (Regulamento das Operações Petrolíferas). The diploma binds concessionaires across four pillars: Employment Programmes, Training/Education Programmes, Association with Mozambican Persons, and Right of Preference in the Contracting of Goods and Services. Quarterly Employment, Education and Hiring Reports must be filed with the Instituto Nacional do Petróleo (INP). Published in Boletim da República I Série Nº 130 and effective the day of publication.
The German Federal Cabinet adopted a 49-measure cross-sectoral supply-side reform package on 17 July 2024 alongside the draft 2025 Federal Budget, aimed at reversing Germany's decade-long slide in global competitiveness rankings (from 6th to 24th since 2014). The package covers tax and social-security exemptions for overtime and weekend work, foreign skilled-worker incentives (Aktivrente / extended short-time-work rules), bureaucracy reduction targeting ~€944m/yr in compliance-cost savings, flexible working-time arrangements, energy-price relief for industry (Strompreispaket), accelerated infrastructure and planning-procedure reforms, expanded investment deductions and degressive depreciation for movable assets, and a raised R&D-allowance ceiling. The initiative is the supply-side / regulatory-reform complement to the simultaneously adopted SVIKG €500bn special infrastructure fund and is structurally analogous to the UK Mansion House Reforms and France's France 2030 productivity-enhancement pillar.
On 29 June 2024 the Council of the European Union adopted Council Regulation (EU) 2024/1865 and Council Decision (CFSP) 2024/1864, amending Regulation (EC) No 765/2006 to extend Belarus's sanctions regime so that it mirrors the restrictive measures already in force against Russia, closing routes used to circumvent the Russia sanctions via Belarus. The package bans the import of gold, diamonds, helium, coal and other mineral products (including crude oil) originating in or exported from Belarus; bans the import of goods and technology on the EU Common Military List if of Belarusian origin; extends the export ban on dual-use goods, oil-refining and LNG-liquefaction equipment, maritime-navigation goods and luxury goods to Belarus; prohibits transit via Belarus of EU-exported firearms and ammunition; and broadens the road-transport ban. The measures entered into force on 1 July 2024, the day after publication in the Official Journal.
Lei 14.902/2024, sanctioned 27 June 2024 (DOU 28 June 2024), institutes the Programa Mobilidade Verde e Inovação (Programa Mover), Brazil's successor framework to Rota 2030 for the automotive ecosystem (passenger cars, trucks, buses, auto parts). The law converts Provisional Measure 1.205/2023 into permanent statute and authorises approximately R$19.3 billion (~USD 4.8 billion) in financial credits for R&D and decarbonisation projects through 2028, alongside an IPI (Industrialised Products Tax) bonus-malus regime tied to lifecycle CO2 emissions, recyclability and energy-efficiency thresholds. Vehicles meeting the strictest "Carro Sustentável" criteria (≤83 gCO2/km, ≥80% recyclability) qualify for zero-IPI treatment, while non-compliant vehicles face higher tax rates. The programme is regulated by Decreto 12.435/2025 (15 April 2025), with mandatory emissions-labelling and commercialisation requirements taking effect from 1 June 2025. The law also permits a 2% reduced import tariff rate for qualifying vehicles where the importer commits R&D spend equivalent to 2% of customs value.
On 27 June 2024 the Argentine Congress passed Law 27.742, the "Ley de Bases y Puntos de Partida para la Libertad de los Argentinos" ("Ley Bases"), the flagship economic reform of the Milei administration. The law was published in the Boletín Oficial on 8 July 2024 and Title VII established the Régimen de Incentivo para Grandes Inversiones (RIGI) — a promotional regime designed to attract large-scale capex into mining, energy, oil & gas, LNG, steel, forestry, tourism, infrastructure, and technology. Implementing Decree 749/2024 was issued on 23 August 2024 and the regime became fully operational with Resolution 1074/2024 on 22 October 2024. RIGI offers single-project vehicles ("VPUs") that commit at least USD 200M (with sector-specific thresholds rising to USD 600M and up to USD 2B for long-term "strategic export" projects) a 30-year regulatory, tax, customs and foreign-exchange stability guarantee. Headline benefits include a reduced 25% corporate income tax (vs. 35% standard), accelerated depreciation, full deductibility of inflation adjustments, an import-duty exemption on capital goods and inputs, a phased relaxation of central-bank obligations to repatriate and convert export proceeds (20% free after year one, 40% after year two, 100% after year three), and reduced dividend withholding tax. Disputes are subject to international arbitration under ICSID or UNCITRAL rules. As of mid-2025, RIGI's project pipeline reached USD 33.9B in submitted applications, of which roughly USD 15.7B (46.5%) had been approved across nine projects spanning steel (Sidersa), energy/LNG (PAE Southern Energy, YPF Argentina LNG), three mining projects, and infrastructure. The flagship approval was Rio Tinto's USD 2.5B Rincón battery-grade lithium carbonate plant in Salta (initial 53,000 t/yr, scaling to 60,000 t/yr by 2028) — the first mining project approved under the regime, on 21 May 2025. Strategically, RIGI is Argentina's bid to compete with Chile's lithium framework and Brazil's industrial policies for upstream-critical-minerals capex. Combined with the lifting of Argentina's FX controls (cepo cambiario) in April 2025 it sharply re-rates the country's project-economics math for multinationals — particularly in the Lithium Triangle, the Vaca Muerta shale, and pipeline/LNG infrastructure. Whether the 30-year stability guarantee survives a future change of government is the dominant political-risk overhang on the regime.
Rwanda's Parliament enacted Law n° 056/2024 of 26 June 2024 establishing a new tax on minerals, published in the Official Gazette special issue of 5 July 2024 and replacing the 2013 minerals-tax law that had used a three-category framework with a top rate of 6%. The 2024 statute restructures the mineral-tax regime into six categories (base metals, gemstones, platinum group metals, rare earth elements, energy minerals, gold) and applies differential rates between domestically processed minerals (royalty tax: 0.5%–3%) and raw-mineral exports (export tax: 0.5%–3%), explicitly favouring value-added processing. Notably the gold royalty falls from 6% to 0.5% and base-metal royalty from 4% to 3%. The law operates under separate tax-policy authority from the companion Mining Law n° 072/2024 enacted the same day and is the principal fiscal instrument underpinning Rwanda's 3T (tin/tantalum/tungsten) processing-hub strategy and broader value-addition agenda under the National Strategy for Transformation (NST1).
On 24 June 2024 the Council of the European Union adopted Council Regulation (EU) 2024/1745, the 14th package of restrictive measures against Russia, amending Regulation (EU) 833/2014. The package introduces the EU's first targeted measures against Russian LNG (a ban on EU-port transhipment to third countries after a 9-month transition, and a prohibition on EU investment and goods/services exports to Russian LNG projects under construction such as Arctic LNG 2 and Murmansk LNG), bans EU entities outside Russia from using the SPFS Russian financial-messaging system, designates 27 named "shadow-fleet" tankers under a new vessel-specific port-access ban, and imposes a "best-efforts" obligation on EU parents to ensure non-EU subsidiaries do not engage in sanctions circumvention. It adds 116 new listings (69 individuals, 47 entities), including third-country circumvention enablers, to the asset-freeze and travel-ban regime.
Regulation (EU) 2024/1735 - the Net Zero Industry Act (NZIA) - was published in the Official Journal on 22 June 2024 and entered into force on 12 July 2024 (twenty days after OJ publication). It sets a binding target that at least 40% of the EU's annual deployment needs for net-zero technologies be manufactured within the EU by 2030. It establishes a streamlined permitting regime for Net-Zero Strategic Projects (NZSP) capped at 18 months for construction permits (9 months for smaller projects), creates Net-Zero Regulatory Sandboxes, and requires public procurers and auction designers to include resilience and sustainability criteria that effectively favour non-China-sourced equipment. The Act is the manufacturing-capacity complement to the Critical Raw Materials Act (CRMA, Reg 2024/1252, filed separately) and was explicitly designed to close the EU's competitive gap with US IRA manufacturing incentives.
The Kyrgyz Republic's parliament adopted on 13 June 2024 — and President Sadyr Japarov signed into law on 27 June 2024 — amendments to the Law "On Subsoil" (No. 49 of 19 May 2018) that lift the constitutional-status prohibition on geological exploration, prospecting, and development of uranium and thorium deposits enacted in 2019 under President Jeenbekov. The law simultaneously invalidates the standalone 2019 prohibition statute and introduces a voluntary state-equity transfer mechanism allowing mining-rights holders to transfer company shares to the state for strategically important gold and coal deposits. Together with the January 2024 Presidential Decree No. 5 (Polymetals and REE National Project), the amendment forms the second pillar of President Japarov's mining reset, re-opening the Kyzyl-Ompol uranium-REE-ilmenite deposit in Issyk-Kul oblast (est. 2,000+ tU resource + significant Th₂O₃, REE, and ilmenite by-products) to Western and Asian operators for the first time since 2019.
Regulation (EU) 2024/1781, the Ecodesign for Sustainable Products Regulation (ESPR), replaces the 2009 Ecodesign Directive with a cross-cutting product-sustainability framework covering nearly all physical goods placed on the EU single market. It empowers the Commission to adopt binding delegated acts setting ecodesign requirements (durability, reparability, recyclability, recycled content, chemical restrictions, energy and resource efficiency) by product category, establishes a mandatory Digital Product Passport (DPP) for supply-chain traceability, and bans the destruction of unsold consumer products. The regulation entered into force on 18 July 2024; the Commission's first ESPR and Energy Labelling Working Plan (2025–2030, COM(2025) 187) was adopted in April 2025, prioritising textiles, furniture, tyres, electronics, and iron/steel/aluminium.
On 4 June 2024 the Philippine Department of Energy issued Department Circular DC2024-06-0018, the Revised Omnibus Guidelines Governing the Award and Administration of Renewable Energy Contracts and the Registration of Renewable Energy Developers. The circular operationalises the November 2022 reinterpretation (DC2022-11-0034) under which solar, wind, biomass and ocean/tidal RE resources are excluded from the constitutional 60-40 nationality cap on natural-resource exploitation, allowing 100% foreign-owned applicants to take RE Service Contracts in those four resource classes. Geothermal RE contracts remain subject to the 60-40 Filipino-ownership requirement. The Guidelines also restructure pre-award, award and post-award procedures across the ~1,400 RE service contracts (≈154 GW) in the DOE pipeline and allow developers to begin permitting and feasibility work before the 25-year contract term formally begins.
Peraturan Menteri Energi dan Sumber Daya Mineral (Permen ESDM) No. 6 of 2024, signed by Minister Arifin Tasrif on 30 May 2024 and published in the Berita Negara Republik Indonesia, establishes the procedural framework governing how holders of Mining Business Licences (IUP) and Special Mining Business Licences (IUPK) for copper, iron, lead, and zinc production may continue to sell processed mineral products abroad during the final phase of domestic smelter construction. Licence holders that previously obtained MEMR export recommendations and whose refining facilities have reached commissioning stage but are not yet at full operational capacity may apply for time-bound extensions to sell concentrate and semi-processed ore offshore through 31 December 2024, subject to quarterly physical inspections by the Director General of Minerals and Coal. The regulation is the MEMR-side companion instrument to the same-day Permendag 10/2024 (Ministry of Trade copper-concentrate and anode-sludge export prohibition), together constituting the complete legal architecture of Indonesia's copper hilirisasi (downstream- processing) mandate. Its scope is broader than the Trade Ministry rule: it covers copper, iron, lead, and zinc whereas Permendag 10/2024 targets copper and anode-sludge only, and it operates as the conditional derogation mechanism (MEMR) to Permendag 10/2024's absolute prohibition regime (Trade Ministry).
Indonesia's Ministry of Trade promulgated Peraturan Menteri Perdagangan (Permendag) No. 10 of 2024 on 30 May 2024, amending Permendag 22/2023 on Goods Prohibited for Export. The regulation set 31 December 2024 as the final cutoff for copper-concentrate and anode-sludge exports — extending the original 1 June 2024 ban deadline by seven months — and enforced a full prohibition starting 1 January 2025. The measure is paired with ESDM Regulation No. 6 of 2024 covering the upstream mining-product side, completing the legal architecture of Indonesia's copper "hilirisasi" (downstream-isation) mandate. The ban forces all domestically mined copper concentrate to be smelted and refined inside Indonesia. Two operators are directly affected: PT Freeport Indonesia (PTFI), majority-owned by state holding MIND ID with Freeport-McMoRan as minority partner, which operates the Grasberg mine in Papua and the new Manyar/Gresik smelter in JIIPE; and PT Amman Mineral Nusa Tenggara (subsidiary of PT Amman Mineral Internasional, IDX:AMMN), which operates the Batu Hijau mine in Sumbawa with a smelter under commissioning. A fire at Freeport's Gresik smelter in October 2024 disrupted ramp-up and forced the government to grant a discretionary export-permit extension into 2025 for PTFI, signalling that the ban — while now legally in force — is being enforced flexibly during smelter commissioning rather than as a hard stop. Permendag 10/2024 is the copper-sector equivalent of the 2020 nickel- ore export ban (ESDM 11/2019) and the planned bauxite-ore ban (effective June 2023). Together these three measures complete Indonesia's resource-nationalism package across its three highest-value mineral exports: nickel, bauxite, and copper. Combined domestic smelter capex commitments tied to the copper rule (Freeport Manyar + Amman Sumbawa) total ~USD 6 billion. Indonesia's Finance Ministry estimated forgone export revenue of ~Rp 10 trillion (~USD 640 million per year) from the copper-concentrate ban alone, which the government is treating as an acceptable downstream-policy cost. Severity is set at 4: the action is binding, durable, and reshapes a globally relevant supply chain (Indonesia is ~5% of global mined copper, rising), but discretionary export extensions during smelter commissioning soften near-term enforcement and limit the immediate market shock relative to the harder 2020 nickel rule.
Prime Minister Anwar Ibrahim launched Malaysia's National Semiconductor Strategy (NSS) on 28 May 2024 in his keynote at SEMICON Southeast Asia, with implementation led by MITI. The NSS commits at least RM25 billion (~USD 5.3 billion) in fiscal support over a ten-year horizon and structures the chip industrial policy in three sequential phases: (1) shoring up Malaysia's existing strength in outsourced semiconductor assembly and test (OSAT) and back-end packaging, (2) moving domestic firms into integrated-circuit (IC) design, advanced packaging and advanced manufacturing equipment, and (3) developing Malaysian-owned global champions across the chip value chain under a "Made by Malaysia" framing. Headline targets include developing 10 local design and advanced- packaging companies with revenues between RM1 billion and RM4.7 billion, 100 broader semiconductor-related companies near the RM1 billion revenue mark, and training 60,000 high- skilled engineers. The RM25 billion envelope decomposes into RM5 billion in tax forgone over five years, RM2 billion for existing capital grants, RM1.25 billion for an HRD Fund semiconductor allocation, RM2 billion for a Semiconductor Industrial Park, RM1.59 billion for an Advanced Packaging Centre, plus RM2 billion each for the National Energy Transition Facility and Green Tech Financing Scheme. By June 2025, the government reported RM70.7 billion in announced investments attracted under the NSS umbrella.
Uganda's Statutory Instrument No. 30 of 2024, gazetted and effective 24 May 2024, prohibits the export of unrefined gold and mandates a minimum purity threshold of 99.9% for all gold export consignments. Exporters must demonstrate compliance via a purity certificate and proof of payment of an export levy of US$200 per kilogram of refined gold. The instrument replaces a previous statutory instrument of the same name that had expired on 30 June 2023, re-enacting and reinforcing the in-country value-addition mandate for Uganda's gold sector.
Japan's Act on the Promotion of Supply and Utilization of Low-Carbon Hydrogen and its Derivatives for a Smooth Transition to a Decarbonized, Growth-Oriented Economic Structure (the Hydrogen Society Promotion Act) was enacted by the Diet on 17 May 2024, promulgated 24 May 2024, and came into force on 23 October 2024. It is Japan's first legislation specifically targeting hydrogen. The Act establishes a 15-year price-gap Contract-for-Difference (CfD) subsidy backstopping the delivered cost of certified low-carbon hydrogen, ammonia, synthetic methane and synthetic fuels supplied to Japan, plus a "Hub Support" capex grant for shared port/pipeline/storage infrastructure. METI is the competent authority and JOGMEC the implementing agency. Total subsidy envelope is ~3 trillion yen (~USD 20bn) financed via GX Transition Bonds under the 2023 GX Promotion Act.
Australia's Future Made in Australia package, announced in the 2024-25 Federal Budget on 14 May 2024, commits A$22.7bn over 10 years to position Australia as a preferred supplier in the global clean-energy and critical-minerals supply chain. The two flagship production tax incentives are: (1) the Critical Minerals Production Tax Incentive (10% of eligible processing and refining costs for 31 critical minerals) and (2) the Hydrogen Production Tax Incentive (A$2 per kg of eligible renewable or low-emissions hydrogen, 2027-2040). A National Interest Framework administered by DISR determines which investments qualify. The framework act established a Future Made in Australia Coordinator and consolidated existing industrial-support vehicles (NAIF, EFA) under a single policy lens.
Act No. 9 of 2025, given Royal Assent on 14 February 2025, enacts the two production tax credits announced in the May 2024 Future Made in Australia package. Schedule 1 creates the Hydrogen Production Tax Incentive (HPTI): A$2/kg refundable tax offset for eligible renewable hydrogen produced with emissions intensity below 0.6 kgCO2e/kg H2. Schedule 2 creates the Critical Minerals Production Tax Incentive (CMPTI): a refundable 10% tax offset on eligible processing and refining expenditure for the 31 minerals on Australia's Critical Minerals List. Both offsets apply to production occurring between 1 July 2027 and 30 June 2040, capped at 10 years per project, administered by the ATO via new Divisions 419 (CMPTI) and 421 (HPTI) of the Income Tax Assessment Act 1997.
President Biden signed into law on 13 May 2024 the Prohibiting Russian Uranium Imports Act (Division H of the National Security Supplemental Appropriations Act, Public Law 118-50). The law bans imports to the United States of unirradiated low-enriched uranium (LEU) produced in Russia or by Russian state entities, effective immediately, with a waiver mechanism allowing the Department of Energy to grant case-by-case exceptions through 2027 where no alternative supply is available. The law also authorised up to $2.72B to support US uranium enrichment capacity via CENTRUS and allied enrichment partnerships.
Released 9 May 2024 by the Minister for Resources Madeleine King through the Department of Industry, Science and Resources, the Future Gas Strategy is Australia's first national-level gas-policy framework, explicitly committing gas to a continuing supply role "through to 2050 and beyond" in support of the net-zero transition. The Strategy is built on six guiding principles -- gas must remain affordable for Australian users during transition, reliable supply requires new sources, emissions from production and use must be reduced, gas exports remain critical to global decarbonisation pathways, competitive gas markets are essential, and collaboration is needed to deliver these objectives -- and is paired with a separate Future Gas Strategy Analytical Report. It sets the Commonwealth policy posture for all subsequent LNG-export approval decisions (Northwest Shelf, Beetaloo, Scarborough), east-coast domestic-supply policy (including the AEMO gas-statement-of- opportunities forecast and any future domestic-reservation intervention), and Australia's international posture on long-term LNG offtake renewals with Japan, Korea and Taiwan.
Oman published its national Green Hydrogen Strategy in May 2024 (with an updated December 2024 release), formalising statutory production targets of 1.0-1.5 Mtpa green hydrogen by 2030, 3.25-3.75 Mtpa by 2040, and 7.5-8.5 Mtpa by 2050. Implementation is centralised in Hydrom (Hydrogen Development Oman), the wholly state-owned subsidiary of Energy Development Oman established in 2022 as the singular allocation authority for green- hydrogen master-planning, land tendering and developer concessions. Approximately 50,000 km² of state land in Duqm, Dhofar and Al Jazir is earmarked under the regime, sufficient to host ~95-100 GW of electrolyser capacity and ~175-185 GW of renewable build-out by 2050. The strategy underpins the ~USD 11bn Round-2 Dhofar awards announced April 2024 and positions Oman as a structural offtake supplier to EU/JP/KR hydrogen importers under the EU Renewable Energy Directive III non-bio renewable fuel of non-biological origin (RFNBO) framework and the Japan Hydrogen Society Promotion Act CfD scheme.
On 3 April 2024 the European Commission opened two simultaneous FSR Phase II in-depth investigations — the second and third ever under the Foreign Subsidies Regulation (Regulation 2022/2560) — concerning a Romanian public-procurement procedure for the design, construction and operation of a 454.97 MW EU-co-funded photovoltaic park (Rovinari Est). The first investigation targeted the ENEVO Group consortium including LONGi Solar Technologie GmbH (German subsidiary wholly owned by HK-listed LONGi Green Energy Technology Co., Ltd.); the second targeted Shanghai Electric UK Co. Ltd. and Shanghai Electric Hong Kong International Engineering Co., Ltd. (Chinese SOE). Both respondents withdrew from the procurement procedure after the Commission's opening; the Commission subsequently closed both investigations. This was the first FSR Phase II enforcement action in the renewable-energy / solar-PV sector and the first targeting a private Chinese-listed company's EU subsidiary.
The Dutch Council of Ministers on 28 March 2024 approved Project Beethoven, a EUR 2.51 billion public-investment package for the Brainport-Eindhoven semiconductor ecosystem. The package combines EUR 1.28 billion from the Nationaal Groeifonds, EUR 450 million in additional central- government education/talent spending, and EUR 780 million in regional co-funding from the Province of Noord-Brabant and the Municipality of Eindhoven. Investment pillars cover infrastructure (mobility, road capacity on A2/A58/A67, energy-grid reinforcement), a national semiconductor-talent plan targeting 2,000 master's-programme graduates per year by 2030, 16,000+ new housing units in the Brainport region, and quality-of-life improvements. The Government stated it expects these measures to lead ASML to continue to invest and maintain its statutory and tax domicile in the Netherlands.
Latvia's Saeima adopted on 27 March 2024 amendments to the National Security Law (Nacionālās drošības likums), entering into force on 24 April 2024, that widen the perimeter of foreign-investment and ownership transactions subject to Cabinet of Ministers pre-clearance over "companies of significance to national security." The amendments expand the universe of regulated subjects beyond registered companies to include foundations and associations, tighten the rules on beneficial-ownership disclosure, and bring additional sensitive activities — energy security including LNG-terminal acquisitions, electronic communications, cybersecurity, and critical-raw-materials processing — under the regime, while clarifying Cabinet authority to impose conditions or unwind transactions retroactively. The law functions as Latvia's horizontal FDI-screening instrument under the EU-wide cooperation framework of Regulation 2019/452.
Portugal's Council of Ministers adopted Resolution n.º 49/2024 on 26 March 2024, establishing the Sistema de Incentivos ao Investimento em Setores Estratégicos (Strategic Sectors Investment Incentive System) — a dedicated state-aid window anchored to the EU Temporary Crisis and Transition Framework (TCTF, Commission Communication C(2023)1711) and routed through Portugal's Regime Contratual de Investimento (RCI, Decree-Law 191/2014). The scheme covers green-transition equipment manufacturing (batteries, solar panels, wind turbines, heat pumps, electrolysers, CCUS) and upstream critical raw materials (lithium, cobalt, nickel, manganese, copper, rare earths, graphite, anode/cathode precursor chemistries), offering cumulative grant equivalents up to 35% of eligible investment for large enterprises and 45–55% for SMEs, Cohesion-Region operations, or strategic-priority categories. A hard 31 December 2025 approval-decision sunset tied to TCTF expiry drove a Q3–Q4 2025 project-decision rush. The scheme served as the primary domestic state-aid instrument underpinning Portugal's four EU CRMA-designated strategic projects (Savannah Barroso lithium, Lusorecursos Aguas Frias lithium, Lifthium Estarreja LiCO3/LiOH refinery, Bondalti Estarreja lithium-derivatives integration).
On 21 March 2024 the PPP Governing Board, acting as the PPP Code IRR Committee, signed the Implementing Rules and Regulations of Republic Act No. 11966 — the Public-Private Partnership Code of the Philippines. The IRR was published in a newspaper of general circulation on 22 March 2024 and took effect on 6 April 2024, operationalising the parent law signed by President Ferdinand R. Marcos Jr. on 5 December 2023. The Code replaces the 1990 Build-Operate-Transfer Law (RA 6957, as amended by RA 7718) and the patchwork of agency-by-agency Joint Venture Guidelines as the single unified national framework governing all PPPs across the national government, GOCCs, state universities, and local government units — covering economic, social, and information-technology infrastructure. Key reforms include removing the prior cap on reasonable rate of return for unsolicited proposals, formalising joint-venture as a PPP modality for GOCCs, centralising contract awards under the PPP Center, and materially shortening approval timelines.