Loading…
Loading…
Structured register of government actions in the geoeconomic space — export controls, tariffs, sanctions, FDI screening, subsidies, industrial-policy laws — cross-referenced into the country, minerals, and ETF surface. Charter: docs/IPTM_CHARTER.md.
Severity 1-5 is the qualitative impact rating (1=minor, 5=structural). The bilateral-trade-grounded quant scorer is the next IPTM milestone. RBI (Register Breadth Index) is a complementary structural-breadth indicator from scripts/py/iptm/breadth.py; divergence between RBI and severity is itself informative (high-sev / low-RBI = strategic chokepoint; low-sev / high-RBI = broad but shallow). Every action has at least one primary source URL. Verify-or-don't-file. See also themes, timeline, graph, sankey, map, country exposure, sector exposure, material exposure (+ graph), weekly briefs, portfolio scan, escalation monitor, trans-shipment hubs. Internal triage tools (RSS-poller candidate feed, source-feed health) live under /admin/candidates + /admin/sources. Subscribe via Atom feed (accepts ?country=CN, ?material=lithium, ?issuer=BIS, ?type=export_control, ?etf=SOXX, ?company=NVDA, ?minSeverity=4, ?year=2026, ?q=…) or pull /api/iptm/actions.
The Union Cabinet chaired by Prime Minister Narendra Modi approved on 5 May 2026 two new semiconductor manufacturing units under the India Semiconductor Mission (ISM) Phase 1: Crystal Matrix Limited (CML) — India's first GaN-based compound-semiconductor and Mini/Micro-LED display fabrication facility (INR 3,068 crore, Dholera, Gujarat) and Suchi Semicon Private Limited (SSPL) — an OSAT facility for discrete semiconductors (INR 868 crore, Surat, Gujarat). Cumulative investment INR 3,936 crore (~USD 400mn); 2,230 skilled jobs at full ramp. This constitutes the 12th and final batch of ISM Phase 1 approvals, closing the first-phase envelope before ISM 2.0 (filed 2026-02-01) takes over.
Kazakhstan's Department of Atomic Energy signed a new Subsoil Use Agreement (SUA) for production at the Akdala uranium deposit, effective 29 March 2026, replacing the expired March 2001 contract. Subsoil rights are held by YUGHK LLP (South Mining and Chemical Company Joint Venture), in which Uranium One (a Rosatom subsidiary) owns 70% and Kazatomprom 30%. The deposit holds approximately 1,500 tonnes of uranium reserves and is expected to operate through 2030, after which the asset is subject to trust management transfer to Kazatomprom as the national company. The renewal was signed expressly to prevent disruption to the technological process and maintain social stability in the region, preserving Rosatom's controlling stake in a single producing Kazakhstani deposit at a time when Kazakhstan is otherwise tightening state control over strategic mineral assets.
President Trump signed Executive Order 14387 on 18 February 2026, invoking Section 101 of the Defense Production Act (DPA) to ensure an adequate domestic supply of elemental phosphorus and glyphosate-based herbicides. The order delegates DPA §101 priority-allocation and contract- direction authority to the Secretary of Agriculture, authorises USDA to direct the production and distribution of these inputs for national-defense purposes, and grants legal immunity to domestic producers acting in compliance with USDA directives. The EO is the first DPA invocation specifically targeting the phosphorus supply chain, reflecting the concentration of global white/yellow phosphorus production in China (~75% share) and the existence of only a single operating US producer.
The Government of Rajasthan approved its first dedicated semiconductor industrial policy on 21 January 2026, offering a layered incentive stack on top of India's national Semiconductor Mission (ISM). The policy covers fab, ATMP, OSAT, compound semiconductors (SiC, GaN), display fabs, sensors, power electronics, PCBs, and fabless design, with investment-classification tiering (large / mega / ultra-mega categories). Key incentives include a 60% top-up on any ISM capital subsidy received, a 5% interest subsidy on term loans, 100% electricity duty exemption for seven years, 75% stamp duty and land conversion charges exemption, and SGST reimbursements. The official policy document was publicly released on 24 March 2026 via the Rising Rajasthan portal.
On 7 January 2026 the National Semiconductor and Advanced Electronics Industry Policy Committee (the "Semiconductor Board"), chaired by Deputy Prime Minister and Minister of Finance Ekniti Nitithanprapas, endorsed the Draft National Strategy for the Development of the Semiconductor and Advanced Electronics Industry, prepared by the Board of Investment (BOI) with Roland Berger after a public hearing in October 2025. The 25-year roadmap (2026-2050) targets more than THB 2.5 trillion (~USD 79.6 billion) in investment, training of more than 230,000 highly-skilled engineers, and construction of a complete upstream-to- downstream semiconductor ecosystem with phased milestones for 2030, 2040 and 2050. The strategy prioritises five product groups where Thailand has competitive potential — Power chips, Sensors, Photonics, Analog and Discrete chips — and explicitly aims to move the country beyond OSAT (Outsourced Semiconductor Assembly and Test) into IC design and upstream wafer fabrication ("Made-in-Thailand chips"). Implementation runs through a five-pillar BOI support mechanism: long-term low-interest financing and grants, human-capital development, technology upgrade of the Microelectronics Technology Centre (TMEC), specialised industrial clusters with guaranteed renewable-energy and water security, and streamlined regulatory approvals including a new BOI "FastPass" fast-track facility (16 pilot projects worth THB 170 billion already processed).
On 15 December 2025 Rosatom's fuel division (via subsidiary Renera, under managing company TVEL) put Russia's first full-cycle lithium-ion battery "gigafactory" into pilot-industrial operation in the Neman district of Kaliningrad Oblast. Deputy Industry and Trade Minister Mikhail Ivanov disclosed that the project was financed through a comprehensive state-support package: a RUB 5 billion preferential loan from the federal Industry Development Fund (FRP) under its "Avtokomponenty" (auto-components) programme, plus RUB 5 billion in direct subsidies from the Kaliningrad Oblast government, alongside a special investment contract (SPIC) for the project. The facility has a design capacity of 4 GWh/year — enough to supply battery packs for roughly 50,000 electric vehicles — and is described by officials as a step toward Russian "technological sovereignty" in energy-storage manufacturing following the exit of Western and Asian battery suppliers since 2022.
On December 9, 2025 in Niamey, Niger's state uranium company TNUC and Uranium One Group JSC (a Rosatom State Corporation subsidiary) signed a Memorandum of Cooperation to jointly obtain permits for new uranium deposits, conduct geological exploration of prospective sites, and establish new uranium mining operations in Niger. The agreement completes Niger's post-coup pivot from French-controlled uranium channels (Orano/SOMAÏR expelled 2024–2025) to Russian-aligned supply, routing future NE yellowcake production through the Rosatom global enrichment network. A companion Rosatom–Niger MoU on peaceful nuclear energy cooperation (NPP feasibility and reactor construction) was signed in the same period.
The Union Cabinet chaired by Prime Minister Narendra Modi approved on 12 August 2025 four new semiconductor manufacturing units under the India Semiconductor Mission (ISM) Phase 1: SiCSem Private Limited (Silicon Carbide compound-semiconductor fab, Odisha, with UK partner Clas-SiC Wafer Fab Ltd.), 3D Glass Solutions Inc. (advanced glass-substrate packaging, Odisha), Continental Device India Private Limited / CDIL (discrete power-semiconductor expansion, Punjab), and Advanced System in Package Technologies / ASIP (OSAT unit with South Korea's APACT Co. Ltd, Andhra Pradesh). Cumulative investment INR 4,600 crore (~USD 525mn); 2,034 skilled jobs at full ramp. This brought total approved ISM Phase 1 projects to 10 across 6 states, with cumulative committed investment of approximately INR 1.60 lakh crore (~USD 18bn).
On 8 August 2025, Ukraine's President signed Decree No. 595/2025, enacting an NSDC decision "On the Application of Personal Special Economic and Other Restrictive Measures (Sanctions)" against Russian state nuclear corporation Rosatom and its international corporate network. Sanctions were applied to 18 individuals and 17 legal entities identified as involved in attempts to integrate the occupied Zaporizhzhia Nuclear Power Plant into Russia's grid, participation in the seizure of the Chornobyl NPP, production and servicing of dual-use nuclear equipment, and export of enriched uranium through Rosatom subsidiaries registered in Switzerland, Cyprus, the Netherlands, and Finland. Named entities include Uranium One Holding N.V. (Netherlands), Rosatom Finance Ltd (Cyprus), and JSC Kirov-Energomash (Russia).
Brazil's Câmara de Comércio Exterior executive committee (Gecex) approved Resolução nº 770, de 25 de julho de 2025, amending Annexes II and V of the base tariff-nomenclature resolution (Gecex nº 272/2021). The resolution raises the import tariff on raw kraft paper/cardboard (NCM 4707.10.00) and other recovered/waste paper or cardboard (NCM 4707.90.00) to 18%, valid 1 August 2025 to 31 July 2026, and sets a 3.8% duty on glyphosate and its monoisopropylammonium salt (NCM 2931.49.14) valid 15 August 2025 to 14 August 2027. It also removes carbon steel with carbon content of 0.6% or more by weight (NCM 7213.91.10) from the reduced-tariff annex.
The Union Cabinet, chaired by Prime Minister Narendra Modi, approved the establishment of a sixth semiconductor unit under the India Semiconductor Mission (ISM) on 14 May 2025. The unit is a joint venture between HCL and Foxconn (Hon Hai) and will build an Outsourced Semiconductor Assembly and Test (OSAT) plant near Jewar airport in the Yamuna Expressway Industrial Development Authority (YEIDA) area of Uttar Pradesh, manufacturing display driver chips for mobile phones, laptops, automobiles, PCs and other display-equipped devices. The approved investment is INR 3,700 crore (~USD 435 million), with designed capacity of 20,000 wafers per month and output of 36 million units per month.
On 2 October 2025, Navoiyuran State Enterprise (45%), French nuclear-fuel-cycle company Orano SA (45%), and Japanese trading house ITOCHU Corporation (10%) completed the restructuring of their Nurlikum Mining joint venture, unlocking industrial development of the South Djengeldi uranium deposit in Uzbekistan's Kyzylkum Desert (Navoi region). The initial shareholder framework was signed in Paris on 10 March 2025. The project plans to produce approximately 500 tU/year over a ten-year mine life using in-situ leaching (ISL) technology, with production start targeted for Q4 2025, creating a Western-and-Japan-supply-chain-aligned uranium stream distinct from the Rosatom/ Kazatomprom-dominated channel.
BIS published an interim final rule (FR Doc 2025-00711, 90 FR 4544-publication slot; companion to the AI Diffusion Framework signed three days earlier) revising the EAR to add explicit due-diligence procedures for advanced computing integrated circuits captured by ECCN 3A090. The rule (i) creates an Authorized IC Designer / Approved IC Packager regime so that foundries and OSATs can identify trustworthy customers via lists maintained by BIS, (ii) imposes new front-end-fabricator reporting requirements for any 3A090.a IC produced for an authorized IC designer to give the US government supply-chain visibility, and (iii) adjusts the scope of covered advanced-computing items. Effective 16 January 2025; compliance required from 31 January 2025; comment period extended to 14 March 2025. The rule was immediately followed by the 16 January Entity List additions (Sophgo et al.) targeting circumvention paths and was technically amended on 14 February 2025 to narrow the RS license requirement to ECCN 3A090.a only.
Yacimientos de Litio Bolivianos (YLB), Bolivia's state lithium SOE, signed a contract in September 2024 with Uranium One Group — a subsidiary of Russia's Rosatom state nuclear corporation — for the design, construction, and initial operation of an industrial direct-lithium-extraction (DLE) carbonation plant at Salar de Uyuni, with initial capacity of 14,000 t/yr lithium carbonate (expandable to 25,000–45,000 t/yr), representing a total investment exceeding USD 970 million and a 51%/49% profit-split in Bolivia's favour. The contract was approved by Bolivia's Comisión de Economía Plural in February 2025 amid corruption allegations, then suspended by parliamentary motion on 14 February 2025; a Bolivian court issued a further precautionary suspension order on 27 May 2025 on human-rights, environmental, and Mother Earth rights grounds, while the Arce government continued to insist on legislative ratification through at least 29 May 2025.
Prime Minister Anwar Ibrahim launched Malaysia's National Semiconductor Strategy (NSS) on 28 May 2024 in his keynote at SEMICON Southeast Asia, with implementation led by MITI. The NSS commits at least RM25 billion (~USD 5.3 billion) in fiscal support over a ten-year horizon and structures the chip industrial policy in three sequential phases: (1) shoring up Malaysia's existing strength in outsourced semiconductor assembly and test (OSAT) and back-end packaging, (2) moving domestic firms into integrated-circuit (IC) design, advanced packaging and advanced manufacturing equipment, and (3) developing Malaysian-owned global champions across the chip value chain under a "Made by Malaysia" framing. Headline targets include developing 10 local design and advanced- packaging companies with revenues between RM1 billion and RM4.7 billion, 100 broader semiconductor-related companies near the RM1 billion revenue mark, and training 60,000 high- skilled engineers. The RM25 billion envelope decomposes into RM5 billion in tax forgone over five years, RM2 billion for existing capital grants, RM1.25 billion for an HRD Fund semiconductor allocation, RM2 billion for a Semiconductor Industrial Park, RM1.59 billion for an Advanced Packaging Centre, plus RM2 billion each for the National Energy Transition Facility and Green Tech Financing Scheme. By June 2025, the government reported RM70.7 billion in announced investments attracted under the NSS umbrella.
Uttar Pradesh notified its first dedicated state-level Semiconductor Policy on 12 February 2024 (cabinet-cleared 30 January 2024), making it the fourth Indian state with a sectoral semiconductor incentive regime after Tamil Nadu, Karnataka and Gujarat. The policy stacks a 50% additional state capital subsidy on top of the central India Semiconductor Mission (ISM) 50% subsidy — yielding an effective ~75% capex coverage for qualifying fab, display-fab, compound-semiconductor, ATMP/OSAT, and sensor units approved by ISM. It adds a 75% land rebate on the first 200 acres for ATMP/OSAT (30% on additional land), a 5% interest subsidy (capped at ₹1 cr/year for 7 years) on investments up to ₹200 cr, 100% stamp-duty and registration-fee exemption, and a 10-year electricity-duty exemption. Within months of notification the state attracted ₹40,038 cr in investment proposals (Tarq Semiconductor, Kaynes Semicon, Aditech, Vamasundari) with ~32,000 projected jobs, prompting the cabinet to later approve mega-project incentives for investments ≥ ₹3,000 cr.
On 24 February 2023, the first anniversary of Russia's full-scale invasion of Ukraine, the US Department of State announced a package of sanctions designations under the executive order blocking property of persons engaged in harmful foreign activities of the Russian government (E.O. 14024). The State Department describes designating over 60 individuals and entities, including Russian officials and entities in Russia's advanced-technology sector, three enterprises that develop and operate Russia's nuclear weapons, and three civil nuclear entities within the Rosatom structure. The Treasury Department announced parallel designations, including four entities in the metals and mining sector.
The Union Cabinet approved the Semicon India Programme on 15 December 2021, establishing the India Semiconductor Mission (ISM) as the nodal agency. The programme offers fiscal support of up to 50% of project cost for silicon semiconductor fabs, compound semiconductor facilities, display fabs, ATMP/OSAT units, and chip design. Total outlay: Rs 76,000 crore (approximately $10.2bn at 2021 exchange rates). By February 2024, the Cabinet had approved three major semiconductor units under ISM: Tata Electronics with PSMC (semiconductor fab, Dholera, Rs 91,526 crore), Tata Electronics OSAT (Morigaon, Assam, Rs 27,120 crore), and CG Power OSAT (Rs 7,584 crore), totalling over Rs 1.26 lakh crore in committed investment from private applicants.