Loading…
Loading…
Structured register of government actions in the geoeconomic space — export controls, tariffs, sanctions, FDI screening, subsidies, industrial-policy laws — cross-referenced into the country, minerals, and ETF surface. Charter: docs/IPTM_CHARTER.md.
Severity 1-5 is the qualitative impact rating (1=minor, 5=structural). The bilateral-trade-grounded quant scorer is the next IPTM milestone. RBI (Register Breadth Index) is a complementary structural-breadth indicator from scripts/py/iptm/breadth.py; divergence between RBI and severity is itself informative (high-sev / low-RBI = strategic chokepoint; low-sev / high-RBI = broad but shallow). Every action has at least one primary source URL. Verify-or-don't-file. See also themes, timeline, graph, sankey, map, country exposure, sector exposure, material exposure (+ graph), weekly briefs, portfolio scan, escalation monitor, trans-shipment hubs. Internal triage tools (RSS-poller candidate feed, source-feed health) live under /admin/candidates + /admin/sources. Subscribe via Atom feed (accepts ?country=CN, ?material=lithium, ?issuer=BIS, ?type=export_control, ?etf=SOXX, ?company=NVDA, ?minSeverity=4, ?year=2026, ?q=…) or pull /api/iptm/actions.
India's Ministry of Mines launched, on 1 October 2026, the country's first auction of offshore mineral blocks since a 2024 attempt (13 blocks) was cancelled in December 2025 for lack of bidder interest. Two blocks in the Andaman Sea off Great Nicobar Island — West Sewell Ridge-01 (1,000 sq km) and Sewell Rise-01 (632 sq km) — are offered for Composite Licences (combined exploration and mining rights) covering polymetallic nodules and crusts bearing cobalt, nickel, manganese and copper. The auction runs under the Offshore Areas Mineral (Development and Regulation) Act, 2002 and the Offshore Areas Mineral (Auction) Rules, 2024, as amended by the Offshore Areas Mineral (Auction) Amendment Rules, 2026 (notified and effective 24 September 2026), which cut the minimum technically-qualified-bidder threshold for a first-attempt auction from three to two specifically to avoid a repeat of the 2024-25 no-bid cancellation.
On 3 June 2026 the European Commission adopted a legislative proposal for the Cloud and AI Development Act (CADA) — COM(2026) 502 — as part of the European Technological Sovereignty Package. The CADA proposes to triple EU data-centre capacity over five to seven years, introduces a single EU-wide sovereignty assessment framework for cloud and AI services, and establishes common EU-level procurement mechanisms for public administrations prioritising EU-based cloud and AI infrastructure. As a Commission proposal the CADA now enters co-decision (European Parliament + Council) and is not yet law; it is structurally distinct from the co-adopted Chips Act 2.0, addressing cloud infrastructure and AI compute capacity rather than semiconductor supply chains.
On 26 May 2026 at the Quad Foreign Ministers' Meeting in New Delhi, the United States, Japan, Australia, and India signed the Quad Critical Minerals Initiative Framework, committing to mobilise up to USD 20 billion in combined government and private-sector investment for mining, processing, refining, and recycling of critical minerals across the Indo-Pacific. The framework coordinates investment-policy tools, exploration support, market-development instruments, and supply-chain financing across all four members, with the explicit aim of diversifying critical mineral supply chains away from single-point dependencies in processing. It is the first Quad-format multilateral critical minerals commitment and represents a structural coordination layer atop existing bilateral frameworks (US-Japan, US-India, Japan-France) and national strategies.
Zimbabwe's Ministry of Mines and Mining Development gazetted a formal Mineral Classification and Declaration on 22 May 2026, signed by Minister Dr Polite Kambamura, classifying 14 minerals as "critical" (nickel, cobalt, graphite, copper, REE, chrome, PGMs, manganese, antimony, uranium, ruthenium, tungsten, niobium — plus metallurgical coal as "special critical") and 10 as "strategic" (limestone, potash, phosphorus, iron ore, pyrites, oil, gas, coal, gold, diamonds). The declaration mandates minimum state shareholding through designated Special Purpose Vehicles (SPVs) in all critical-mineral exploitation operations and prohibits export of listed minerals in raw or unbeneficiated form without a ministerially-approved conditional transitional plan specifying a local beneficiation timeline.
Brazil enacted Lei 15.506 of 16 September 2026 (in force on publication, Art. 51), establishing the Política Nacional de Minerais Críticos e Estratégicos (PNMCE) — Brazil's first standalone critical-minerals sovereignty framework — and the Conselho Nacional para Industrialização de Minerais Críticos e Estratégicos (CIMCE). The law originated as Bill PL 2780/2024, approved by the Chamber of Deputies on May 6-7, 2026 (one day before the Lula-Trump White House meeting) and then by the Senate. It authorises the Union to create the Fundo Garantidor da Atividade Mineral (FGAM) with up to R$2bn (Art. 9) to guarantee critical-mineral projects, and a tax credit of up to 20% of spend on critical-mineral processing, transformation and urban mining. The Chamber-approved text (CMCE committee with prior-approval rights over takeovers and foreign participation, FGAM up to R$5bn, 0.3% gross-revenue R&D levy) was amended before enactment; see the 2026-09-16 amendment.
On 27 April 2026, US Assistant Secretary of State Caleb Orr and Bolivian Mining Minister Marco Antonio Calderón signed a Critical Minerals Memorandum of Understanding in Washington DC, establishing a non-binding cooperation framework targeting lithium, cobalt, and copper supply chains. The MoU is the first major bilateral economic instrument between the US and Bolivia since the 2008–09 expulsion of the US Ambassador, marking a strategic realignment by the post-Paz government toward Western investment partnerships. The agreement commits both governments to attract private-sector investment to Bolivia's critical-minerals endowment — including the Salar de Uyuni lithium resource (~21 Mt LCE, world's largest identified reserve) — as operational follow-through to Bolivia's February 2026 Critical Minerals Ministerial participation and the FORGE launch. It runs in parallel with Bolivia's domestic Proyecto de Ley del Litio (filed December 2025), which would open extraction-stage YLB operations to private partnership and introduce a progressive royalty structure.
The European Commission and the US announced on 24 April 2026 the signing of a Memorandum of Understanding (MoU) on a strategic partnership on critical minerals, accompanied by an EU-US Critical Minerals Action Plan. The framework deepens cooperation on supply-chain security across the strategic raw-materials list shared between the two jurisdictions — joint financing, recycling, mutual recognition of strategic- project status under the EU Critical Raw Materials Act (filed: 2024-05-23-eu-crma-entry-into-force) and US IRA §30D / §45X frameworks (filed: 2022-08-16-us-inflation-reduction-act). The agreement is positioned as a joint response to non-market practices in third-country supply chains for the named materials.
On 22 April 2026 President José Antonio Kast's administration formally filed the National Reconstruction and Economic and Social Development Bill in the Chamber of Deputies, codifying the 40-measure package unveiled on 15 April. Core mining-sector provisions include a phased corporate tax cut from 27% to 23% by 2029 (25.5% in 2027, 24% in 2028, 23% from 2029), a 25-year tax-invariability regime for major mining projects shielding investors from future royalty increases and new sector-specific levies, and permitting reform capping environmental review rounds and injunctions to compress >1,000-day timelines. The bill targets unlocking Chile's stalled ~USD 100 bn copper/lithium pipeline and is the most significant restoration of legal certainty for foreign mining investors since the repeal of DL 600.
Indonesia's Ministry of Energy and Mineral Resources (ESDM) issued Ministerial Decree No. 144.K/MB.01/MEM.B/2026, effective 15 April 2026, fundamentally restructuring the Nickel Ore Benchmark Price (Harga Patokan Mineral, HPM) formula that governs the minimum domestic transaction price for ore sales from IUP/IUPK miners to downstream processors. For the first time the HPM uses a multi-element comprehensive pricing formula incorporating by-product credits for cobalt, iron, and chromium alongside nickel content, and raises the Correction Factor (CF) for 1.6%-grade ore from 17% to 30% (a ~76% increase), with an inverse-linear ±1% CF adjustment per ±0.1% grade variance. The reform also shifts HPM measurement from dry-metric-ton (US$/dmt) to wet-metric-ton (US$/wmt) with explicit moisture-content deduction, covers 10 minerals including bauxite, and replaces Kepmen ESDM No. 268.K/2025. The measure redistributes economic rent from the downstream Chinese-backed HPAL/RKEF processing complex toward upstream Indonesian miners, tightening margins across Indonesia's ~50%-of-global-supply nickel-ore industry.
On 8–9 April 2026 the Argentine Cámara de Diputados gave final passage (137–111 with 3 abstentions) to a bill amending Ley 26.639 (the 2010 Régimen de Presupuestos Mínimos para la Preservación de los Glaciares y del Ambiente Periglacial), after the Senate had already approved the reform in February 2026 (40–31 with 1 abstention). The Executive promulgated the law as Ley 27.804 via Decreto 271/2026, published in the Boletín Oficial on 24 April 2026. The reform narrows the federal protection floor by limiting strict protection to glaciers and periglacial geoforms with proven hydrological function, and transfers to provincial governments the authority to define the technical and scientific criteria delimiting protected areas — directly unblocking the "ABCD" copper pipeline (Agua Rica/MARA, Filo del Sol, Josemaría, Los Azules, El Pachón) and adjacent lithium and gold projects whose prior periglacial-buffer encumbrance had stalled an estimated USD 30bn of investment, ~70% in copper / gold / silver.
The Mongolian Government prepared and submitted to parliament a two-track legislative package: (i) a standalone Law on Supporting Critical Minerals Projects, sponsored by MP B. Uyanga, that creates a formal Cabinet-administered list of critical minerals, simplifies and fast-tracks exploration-licence procedures for designated critical-mineral deposits, and mandates that no less than 60% of total benefits from those deposits flow to the public via the National Wealth Fund (Win-Win principle); and (ii) companion Cabinet-approved amendments to the parent Minerals Law introducing the same critical-mineral definition, a dual-track licensing system (first-come-first-served plus tenders), and escalating fees on inactive licences to deter speculative hoarding. The package was formally on the agenda of the 2026 Spring Session of the State Great Khural (commenced 16 March 2026); as of May 2026 the bills remain in parliamentary review pending enactment.
On 12 March 2026, Chilean Foreign Affairs Minister Francisco Pérez Mackenna and US Deputy Secretary of State Christopher Landau signed the Joint Declaration for the Establishment of Consultations on Critical Minerals and Rare Earth Elements at La Moneda Palace in the presence of President José Antonio Kast. The Declaration establishes a bilateral consultation framework to secure reliable supply chains for critical minerals and rare earth elements, commits both sides to explore public/private financing for qualifying investment projects (via DFC and EXIM Bank), and mandates a first round of consultations within 15 days of signing with the goal of reaching a more detailed cooperation agreement. Chile's strategic profile as the world's largest copper producer and third-largest lithium producer makes this the first bilateral critical minerals partnership under the Kast administration and positions Chile inside the FORGE-adjacent US-allied supply-chain architecture.
At the PDAC Convention 2026 in Toronto, Canada's Minister of Energy and Natural Resources Tim Hodgson announced the Critical Minerals Sovereign Fund (CMSF), a CAD 2 billion vehicle to be operated by Natural Resources Canada that will deploy equity investments, debt, and offtake agreements into Canadian critical-minerals projects and companies. Initial focus covers six of Canada's 34 critical minerals — copper, nickel, lithium, graphite, cobalt, and rare earth elements — with capital expected to begin flowing in spring 2026. The CMSF is part of a broader CAD 3.6 bn PDAC-day announcement package that NRCan estimates will unlock CAD 12.1 bn in mining-project capital across 30+ partnerships, and is structurally modelled on Australia's Critical Minerals Strategic Reserve.
The Ecuadorian National Assembly approved on 26 February 2026 (vote 77-70, urgent-economic-matter procedure) the Ley Orgánica para el Fortalecimiento de los Sectores Estratégicos de Minería y Energía, the statutory complement to President Daniel Noboa's Decreto Ejecutivo 273 of 31 December 2025. The law was published in the Quinto Suplemento of Registro Oficial on 2 March 2026 with no presidential objection and entered into force the same day. It comprises 28 articles, two general provisions and one transitory provision. The mining title codifies the 3–8% sliding royalty scale and channels 60% of royalty receipts to social investment via decentralised governments (45% provincial / 35% municipal / 20% parochial) — the legislative anchor for the regime introduced by Decree 273. The energy title amends the Ley Orgánica del Servicio Público de Energía Eléctrica to recognise distributed generation, self-supply and autonomous energy districts, and establishes exception-route participation for foreign state-owned enterprises and popular/solidarity-economy organisations alongside private capital. A controversial Galápagos-adjacent provision permitting expedited mining/energy procedures has triggered domestic constitutional challenge.
On 22-23 February 2026, President Félix Tshisekedi signed and publicly read on RTNC (state television) a series of presidential ordinances replacing the entire leadership of three strategic state-owned mining companies: Gécamines (copper/cobalt), SAKIMA (Société Aurifère du Kivu et du Maniema — eastern DRC 3T minerals and gold), and SOKIMO (Société Minière de Kilomoto — Kilo-Moto gold sites). New appointees include Baraka Kabemba as DG of Gécamines, Guy Robert Lukama as DG of SAKIMA, and Yannick Nzonde Mulundu as DG of SOKIMO. The sweeping governance reshuffle came approximately two months after the December 4, 2025 DRC-US Strategic Partnership Agreement on Trade and Investment, signalling a strategic repositioning of DRC state mining apparatus toward a US-aligned critical-minerals framework.
On 21 February 2026 in New Delhi, during the State Visit of Brazilian President Luiz Inácio Lula da Silva, India and Brazil signed a Memorandum of Understanding on Cooperation in the Field of Critical Minerals between India's Ministry of Mines and Brazil's Ministry of Mines and Energy. The MoU establishes a bilateral framework spanning the entire critical-minerals value chain — exploration, mining, processing, recycling, and refining — with explicit focus on rare-earth elements, lithium, nickel, cobalt, niobium, manganese, and other strategic minerals. It was issued alongside a broader Joint Statement targeting USD 30 billion in bilateral trade by 2030 and a ten-year strategic-partnership roadmap covering AI, defence, energy, agriculture, and digital transformation.
On 17 February 2026 Morocco's Ministry of Energy Transition and Sustainable Development (MTEDD), via its Direction Générale des Mines, published Notice n°1/DGMH/2026, an "appel public à la concurrence" opening 361 mining exploration/exploitation zones (~13,000 km², roughly 22% of the designated Tafilalet-Figuig mining region) spanning the Drâa-Tafilalet and Oriental regions for gold, silver, copper, lead, zinc and barite. Award is multi-criteria (technical, financial, and local socio-economic factors plus health/safety compliance) rather than price-only, reflecting the ESG principles adopted at Morocco's November 2025 International Mining Conference (Marrakech Declaration). Candidacy files are due 15 May 2026, filed with the regional MTEDD directorate in Errachidia (Drâa-Tafilalet blocks) or Oujda (Oriental blocks).
France's third Programmation Pluriannuelle de l'Énergie (PPE3), adopted by Décret n° 2026-76 of 12 February 2026 and published in the Journal Officiel on 13 February 2026, sets the framework for public energy policy in metropolitan continental France from 2026 to 2035. The decree codifies a 60% decarbonised-energy-consumption target by 2030 (from 42% in 2023), a 34% electrification share (585 TWh), and a reduction of fossil fuels to 40% of final energy consumption by 2030 (from 58% in 2023). It also formalises the EPR2 new-build programme (6 + 8 optional reactors) within the long-range generation-mix architecture, pairs with the Stratégie Nationale Bas-Carbone (SNBC3) for a net-zero-2050 trajectory, and includes an annex on clean-mobility development (SDMP).
Signed on 11 February 2026 at Mining Indaba (Cape Town) in the presence of DRC Minister of Mines Louis Watum Kabamba, the MoU grants Entreprise Générale du Cobalt (EGC — the DRC state cobalt monopsony) mining rights over an ERG Africa-owned exploitation area in Lualaba Province to pilot a structured artisanal and small-scale mining (ASM) formalisation model covering organised cooperatives, designated ASM zones, controlled buying points, and compliance with safety and labour standards. EGC provides operational leadership and ERG Africa acts as enabling partner; ARECOMS, SEAMAPE, CEEC, and Gécamines provide regulatory and certification support, with GIZ as technical partner. The MoU is the primary public-private implementation vehicle for the December 2025 artisanal processing suspension (`2025-12-19-drc-artisanal-copper-cobalt-processing-suspension`), establishing the re-entry channel through which ASM cobalt supply re-enters formal supply chains under EGC monopsony control.
On 4 February 2026, Argentina and the United States signed the Framework Instrument for Securing of Supply in the Mining and Processing of Critical Minerals at the inaugural FORGE Critical Minerals Ministerial in Washington, DC. The instrument commits both parties to cooperation across the critical-minerals supply chain — exploration, mining, processing, refining, and value-added manufacturing — with lithium and copper as the primary strategic targets given Argentina's position as the world's fourth-largest holder of lithium reserves and an emerging copper producer in the Salta, Catamarca, and San Juan provinces. The framework is one of eleven founding bilateral instruments signed simultaneously under the FORGE (Forum on Resource Geostrategic Engagement) architecture and operationalises the Trump-Milei strategic alignment as a binding supply-chain coordination instrument. Argentina's mining-export trajectory is projected to surpass USD 20bn over the next seven years under the combined RIGI + bilateral-framework investment pull.
The Cook Islands and United States signed a non-binding Framework for Engagement and Cooperation on 4–5 February 2026, on the sidelines of the 2026 US Critical Minerals Ministerial in Washington DC, to strengthen supply chains for critical minerals, rare earths, and deep-sea minerals. The framework establishes a US–Cook Islands Working Group, promotes joint research, geological mapping and information sharing, encourages responsible investment aligned with high ESG standards, and supports development of secure, diversified and resilient critical minerals supply chains. Uniquely among the eleven bilaterals signed at the Ministerial, the Framework explicitly recognises the Cook Islands' leadership in ocean governance and reaffirms the Cook Islands' full sovereign control over its seabed minerals and decision-making — a sovereignty- preservation clause that distinguishes it from other Feb-2026 cohort instruments.
On 4 February 2026, Ecuador and the United States signed a bilateral critical minerals cooperation framework at the inaugural FORGE (Forum on Resource Geostrategic Engagement) Critical Minerals Ministerial in Washington DC, committing both parties to cooperation across exploration, mining, processing, refining, and value-added manufacturing of critical minerals. The instrument is the eleventh and final founding bilateral signed under the FORGE architecture, completing the cohort of 11 bilateral frameworks established at the Ministerial. Ecuador's strategic profile centres on Tier-1 porphyry copper-gold deposits (Mirador, San Carlos-Panantza, Cascabel) and emerging rare-earth-bearing carbonatites, with the framework opening access to approximately USD 10 billion in EXIM Bank and DFC financing for Ecuadorean critical-minerals projects.
On 4 February 2026 USTR Ambassador Jamieson Greer and Mexican Secretary of Economy Marcelo Ebrard announced a U.S.-Mexico Action Plan on Critical Minerals — a first-of-its-kind 60-day bilateral work programme to develop coordinated trade policies and supply-chain mechanisms for critical minerals. The Action Plan tasks both governments with identifying a priority mineral list, exploring border-adjusted price floors as a candidate trade instrument, and consulting on how price floors could be incorporated into a binding plurilateral agreement on trade in critical minerals. It is framed as a confidence- building measure ahead of the USMCA Joint Review (statutory deadline 1 July 2026) and as the Mexico-side template that parallels concurrent USTR engagements with the EU and Japan.
On 4 February 2026, in Washington, DC, the United States and the Kingdom of Morocco signed an intergovernmental Memorandum of Understanding to cooperate on critical-mineral and rare-earth supply chains, covering exploration, extraction, processing, and downstream investment. The MoU was one of eleven founding-member bilateral instruments signed simultaneously at the inaugural FORGE (Forum on Resource Geostrategic Engagement) Critical Minerals Ministerial hosted by Secretary of State Marco Rubio. Morocco holds approximately 70-75% of the world's known phosphate reserves and is a globally significant cobalt, copper, and nickel producer; the framework explicitly aims to attract Western investment into Moroccan downstream processing capacity rather than raw-mineral export.
On 4 February 2026, in Washington, DC, Peru and the United States signed an intergovernmental Memorandum of Understanding to cooperate on critical-mineral supply chains, covering exploration, extraction, processing, and downstream investment. The MoU was one of eleven founding-member bilateral instruments signed simultaneously at the inaugural FORGE (Forum on Resource Geostrategic Engagement) Critical Minerals Ministerial hosted by Secretary of State Marco Rubio, with Vice President JD Vance, Treasury Secretary Scott Bessent, Interior Secretary Doug Burgum, Energy Secretary Chris Wright, and USTR Jamieson Greer. Peru is the world's second-largest copper producer (~12% of mined supply), a top-two silver and zinc producer, the leading Latin American gold producer, and a globally significant source of tin, molybdenum, and lead — making it the most strategically important Latin American signatory of the FORGE founding cohort alongside Argentina.
On 4 February 2026, in Washington, DC, Philippine Secretary of Environment and Natural Resources Raphael P.M. Lotilla and US Under Secretary of State for Economic Affairs Jacob Helberg signed an intergovernmental Memorandum of Understanding to cooperate on diversifying global critical-mineral supply chains and to promote bilateral investment in mapping, survey, processing, refining, and recycling of critical minerals and rare earths. The MoU was one of eleven founding-member bilateral instruments signed simultaneously at the inaugural FORGE (Forum on Resource Geostrategic Engagement) Critical Minerals Ministerial hosted by Secretary of State Marco Rubio. The framework explicitly aims to push the Philippines' mining sector beyond raw-ore export toward domestic value-add and downstream processing.
On 4 February 2026, in Washington, DC, US Deputy Secretary of State Christopher Landau and Uzbekistan Foreign Minister Bakhtiyor Saidov signed an intergovernmental Memorandum of Understanding on Securing Supply in the Mining and Processing of Critical Minerals and Rare Earths. The MoU was one of eleven founding-member bilateral instruments signed simultaneously at the inaugural FORGE (Forum on Resource Geostrategic Engagement) Critical Minerals Ministerial and supersedes the September 2024 Biden-era US-Uzbekistan critical-minerals MoU. On 18 February 2026, the U.S. International Development Finance Corporation (DFC) and EXIM signed Heads of Terms with Uzbekistan's Ministry of Investment, Industry, and Trade and the Fund for Reconstruction and Development of Uzbekistan establishing a Joint Investment Framework — including a proposed U.S.–Uzbekistan Joint Investment Holding Company — covering critical minerals (exploration, extraction, processing), infrastructure, and energy under a three-year Economic Cooperation Programme valued at up to USD 35bn.
On 3 February 2026, Glencore and the US-government-backed Orion Critical Mineral Consortium (led by Orion Resource Partners LP and the DFC) signed a non-binding MOU for Orion CMC to acquire a 40% stake in Glencore's DRC interests — Mutanda Mining (Mumi) and Kamoto Copper Company (KCC) — implying a combined enterprise value of approximately $9 billion. The transaction directly operationalises the December 2025 US-DRC Strategic Partnership Agreement at the equity level, giving the US government-backed buyer rights to appoint non-executive directors and to direct its share of copper and cobalt production to US-aligned offtakers. In 2025, Mumi and KCC together produced 247.8 kt copper metal and 33.5 kt cobalt, making this the largest single US critical-mineral equity-capture move in the DRC to date.
On 2 February 2026 the Export-Import Bank of the United States (EXIM) Board approved a Direct Loan of up to USD 10 billion to an independently governed public-private partnership establishing the U.S. Strategic Critical Minerals Reserve ("Project Vault"), alongside nearly USD 2 billion of private-sector investment for an envelope of approximately USD 12 billion. The reserve will physically stockpile the 60 minerals on the USGS 2025 Critical Minerals List across multiple US storage facilities, with participating original equipment manufacturers (Clarios, GE Vernova, Western Digital, Boeing) committing to specific volumes and grades and trading partners (Hartree Partners, Mercuria Americas, Traxys) handling sourcing. EXIM characterises the transaction as the largest single financing in its 92-year history and the first use of EXIM authority as the financing vehicle for a domestic strategic-minerals stockpile rather than for export-credit insurance abroad.
On 27 January 2026 President Gabriel Boric presented Chile's National Critical Minerals Strategy (Estrategia Nacional de Minerales Críticos, NCMS) — the country's first horizontal critical-minerals governance framework, identifying 14 minerals as priorities for development and establishing five strategic pillars: production and diversification of critical minerals; responsible mining; development opportunities based on critical minerals; enabling capacities; and strategic international positioning. The strategy was developed through a multi-year participatory process coordinated through Cochilco and Sernageomin, involving a 16-member high-level advisory committee, 120 specialists from 56 institutions, regional workshops and a public consultation. It materially broadens Chile's mineral policy beyond the 2023 lithium-specific National Lithium Strategy to a cross-cutting framework that underpins future bilateral critical-minerals MOUs and positions Chile as a strategic raw-materials partner for the US, EU and Japan under their respective IRA/CRMA/GX supply-chain frameworks.
The Government of Kazakhstan, under Prime Minister Olzhas Bektenov, launched a second-generation geological exploration programme allocating 240 billion tenge (~USD 500 million) over 2026–2028 across 20 projects covering approximately 100,000 km² at 1:50,000 scale in 11 regions (Akmola, Aktobe, Almaty, East Kazakhstan, Karaganda, Kostanay, North Kazakhstan, Mangystau, Turkistan, Abai, Ulytau). The programme targets copper, gold, lead, zinc, rare earth elements, barite, and bauxite deposits using aerogeophysical, geochemical, and seismic-exploration methods together with Earth remote-sensing data analysis. It represents a ~50% uplift over the USD 469 million invested cumulatively in geological exploration over the prior 15 years, and modernises Soviet-era 1:200,000-scale mapping to 1:50,000-scale resolution across priority areas of 30,000 km² annually. The programme directly peers Western critical- minerals supply-diversification efforts anchored by the November 2025 US–Kazakhstan Critical Minerals MOU and the EU–Kazakhstan Strategic Partnership Roadmap 2025–2026.
On 9 January 2026 Brazil's Ministry of Mines and Energy published Portaria nº 891/2026, opening a 30-day public consultation (closed 8 February 2026) on the draft Plano Nacional de Mineração 2050 (PNM 2050) — the principal 24-year long-range planning instrument for the Brazilian mineral sector covering 2026–2050. The draft plan is structured around three foundational pillars: sustainability and social value in mining; responsible exploitation of mineral resources; and strategic governance. PNM 2050 is the second-generation successor to the PNM-2010 (2010–2030) and serves as the sector-strategy umbrella above the research-investment PlanGEO 2026-2035 and the critical-mineral-specific PNMCE framework, covering the full breadth of Brazil's mineral economy in the world's fourth-largest mining jurisdiction.
On 2 January 2026 the Saudi Ministry of Industry and Mineral Resources concluded the 9th Exploration Licensing Round — the largest mining-licensing round in the Kingdom's history — by awarding 172 mining sites (including 76 sites cleared via multi-round public auction) to 24 companies and consortia drawn from 26 qualified bidders. The round covered over 24,000 km² spanning the Ad-Duwaihi/Nabitah gold belt (Riyadh region) and the Nuqrah and Sukhaybirah/As-Safra gold belts (Madinah and Qassim regions). Successful bidders committed over SAR 671 million of exploration spend in the first two years of their work programmes; total project investment across the round's awarded licences exceeds SAR 44 billion (~USD 11.7 bn) and represents a 220% YoY surge in licensing-round commitments versus the 2024 round. The round operationalises auction provisions of the 2020 Mining Investment Law (Royal Decree M/47) and is the first Saudi licensing round to formally include the Aramco-Ma'aden lithium JV (Manara Minerals) on the bidder side.
On 26 December 2025 the President of Kazakhstan signed a law amending the Code "On Subsoil and Subsoil Use" with respect to the hydrocarbon and uranium sectors, followed on 30 December 2025 by a parallel set of amendments implementing presidential instructions on broader subsoil-use governance. Both packages take effect on 2 March 2026. The uranium amendments grant the National Atomic Company Kazatomprom (KAP) a statutory priority right to obtain exploration licences over prospective uranium areas listed in the State Subsoil Fund Management Programme, and to reserve blocks containing uranium mineralisation or deposits. Where uranium mineralisation is discovered on a solid-mineral block held by a third-party subsoil-user, an extension of that licence is conditional on the licensee surrendering the uranium-bearing block to the State; private subsoil-users no longer obtain priority production rights for uranium they discover. The amendments also raise the minimum direct or indirect Kazatomprom interest in any uranium mining project from 50% to 75%, and permit subsequent transfer to investors or joint-venture partners only subject to that 75% floor. The 30 December 2025 package establishes the National Geological Service as a non-privatisable national operator subordinate to the authorised subsoil-exploration agency and as the operator responsible for managing geological information; it also creates a Unified Subsoil Use Platform digital infrastructure (open geological-information database integrated with the Unified State System for Management of the Fuel and Energy Complex). The hydrocarbon track of the law shortens block-reservation periods and pushes unallocated plots into electronic-auction allocation to accelerate competitive exploration. The amendments accompany an announced USD 500m state geological-exploration programme.
The Agencia Nacional de Minería (ANM) of Colombia formally launched the Ronda Minera Cobre on 15 December 2025, opening a competitive selection process for 14 Áreas Estratégicas Mineras (AEM) across Antioquia, Cesar, La Guajira, and Tolima targeting copper, gold, and polymetallic minerals. The round operates under Contratos Especiales de Exploración y Explotación (CEEE) and operationalises the strategic-minerals designation framework established by ANM Resolución 1006 and Decreto 0977/2024, converting those prior designations into an active tender vehicle for the first time under the Petro government. Each of the 14 AEM blocks was front-loaded with geological certification, environmental viability sign-off, and community-consultation status verification, substantially reducing the regulatory risk that historically has slowed Colombian mining project timelines; evaluation horizon is up to 10 months.
On 12 December 2025 the Finnish Parliament (Eduskunta) approved Act 1361/2025, amending the Mining Minerals Tax Act (kaivosmineraalivero- laki, Act 314/2023) on the basis of government bill HE 127/2025. The amendment raises the value-based royalty on taxable metals contained in mined metallic ores from 0.6% to 2.5% (a 4.2× increase) and lifts the tonnage royalty on industrial minerals and other useful rock from €0.20 to €0.60 per tonne (3× increase). Iron is newly added to the list of taxable metals (alongside silver, gold, cobalt, chromium, copper, lithium, nickel, lead, palladium, platinum, uranium and zinc). Tax revenue is split 80% to the state and 20% to mining municipalities. The amendment enters into force on 1 January 2026.
On 4 December 2025, the United States and the Democratic Republic of the Congo signed a Strategic Partnership Agreement on Trade and Investment, executed at a White House trilateral ceremony alongside the parallel U.S.-Rwanda framework and witnessed by President Trump, President Tshisekedi (DRC), and President Kagame (Rwanda). The Agreement creates a Strategic Minerals Reserve (SMR) and a Strategic Asset Reserve (SAR) under DRC sovereignty, gives U.S. persons preferential access to SAR assets, and commits DRC and its state-owned enterprises to route at least 30% of their commercialised cobalt volumes through the Sakania-Lobito Corridor within five years. A Joint Steering Committee (JSC) co-chaired by State and DRC's Ministry of Economy holds its inaugural meeting on 4-5 February 2026, designating the initial SAR asset list and launching implementation. The DFC announced a proposed equity investment in a Gécamines-Mercuria copper/cobalt joint venture as the first commercial vehicle under the framework.
The Department for Business and Trade, with DSIT, published "Vision 2035: Critical Minerals Strategy" on 22 November 2025 — the UK's first dedicated critical-minerals strategy under the Starmer government, superseding the withdrawn 2022 strategy. DBT commits up to GBP 50 million for new critical mineral projects on top of GBP 165 million in existing support, with the National Wealth Fund providing equity backing (Cornish Lithium GBP 24m in 2023 plus a further GBP 31m commitment in 2025; Cornish Metals GBP 28.6m in 2025; South Crofty Tin GBP 26.8m). Sets 2035 targets of 10% of UK industrial demand from domestic production (extraction + processing + refining), 20% from recycling, and a hard floor of 50,000 tonnes lithium carbonate equivalent produced domestically. Strategy is consciously midstream-and-recycling-tilted rather than upstream-extraction race; pillars are (i) optimise domestic production, (ii) resilient global supply networks via partnerships with US, EU, Canada, Australia, Saudi Arabia, India, Japan (plus Kazakhstan rhenium/vanadium and continued China engagement), (iii) circular economy / recycling, (iv) responsible supply chains.
On 18 November 2025, during Saudi Crown Prince Mohammed bin Salman's White House visit (17-19 November 2025), the United States and the Kingdom of Saudi Arabia signed a Strategic Framework for Cooperation on Securing Uranium, Metals, Permanent Magnets, and Critical Minerals Supply Chains. The framework was signed by US Secretary of the Interior Doug Burgum and Saudi Minister of Energy H.R.H. Prince Abdulaziz bin Salman, and positions Saudi Arabia (via Ma'aden + Public Investment Fund vehicles) as a regional hub for processing rare earths and producing permanent magnets, supports a US-backed rare-earths refinery in the Kingdom, and channels Saudi capital — alongside the broader USD ~1 trillion Saudi investment commitment in the US announced the same week — into US and allied critical-mineral projects. It is paired with a separate joint declaration on civil nuclear cooperation (Section 123 Agreement contemplated) and was operationalised one day later by the 19 November 2025 binding term sheet between MP Materials, the US Department of War, and Ma'aden to develop a rare-earth refinery in Saudi Arabia (Department of War financing the US side's 49% stake; Ma'aden retaining ≥51%).
Portaria Normativa GM/MME nº 120/2025, published in the Diário Oficial da União on 14 November 2025 by the Ministério de Minas e Energia, regulates the Política de Debêntures para Projetos de Transformação de Minerais Estratégicos para a Transição Energética. It sets the eligibility criteria, classification methodology and project-approval pipeline (under Decreto 11.964/2024 and Leis 12.431/2011 and 14.801/2024) for tax-exempt incentivised debentures and infrastructure debentures financing the downstream transformation of cobalt, copper, lithium, nickel and rare earths into battery and permanent-magnet inputs (lithium carbonate/hydroxide, cobalt sulfate, nickel sulfate, battery-grade copper foil, rare earth oxides/ chlorides/metals/alloys). MME estimates ~R$5.2 bn/year in unlocked private investment (R$3.7 bn transformation + R$1.5 bn mining/ beneficiation, with up to 49% of bond proceeds usable on linked upstream activities).
Canada's Budget 2025 (released 4 November 2025) creates the First and Last Mile Fund (FLMF), allocating $371.8 million over four years starting in 2026-27 to Natural Resources Canada to address transport and utility bottlenecks connecting near-term critical-minerals production sites to deep-water ports and downstream processing facilities. The fund absorbs the existing Critical Minerals Infrastructure Fund and leverages its envelope to provide up to $1.5 billion in total support through 2029-30. The FLMF is structurally distinct from the CMSF (equity/debt vehicle), the CMETC (exploration tax credit), and the Clean Tech ITC (manufacturing tax credit) — it is the infrastructure-grant instrument completing Canada's critical-minerals programme architecture.
On 31 October 2025, Canada's Minister of Energy and Natural Resources Tim Hodgson announced — on the sidelines of the G7 Energy & Environment Ministers' Meeting in Toronto — that the federal government will leverage the Defence Production Act (DPA) to designate critical minerals as defence supplies and build a strategic stockpile, with the Crown acting as buyer of last resort and setting confidential minimum prices to insulate Canadian producers from Chinese price suppression. The announcement was paired with an initial round of 26 investments, partnerships and measures totalling C$6.4 billion in unlocked critical-mineral capital (~C$120m direct federal spend plus up to ~C$1.2 bn in offtake agreements, expressions of interest and export guarantees) and aligned with nine allied countries. It is the first time Canada has invoked DPA stockpiling and priority-procurement powers for non-traditional defence inputs (lithium, nickel, cobalt, copper, rare earths, graphite, uranium) and repositions Canada as an allied-aligned strategic supplier parallel to US DPA Title III action under EO 14241.
On 20 October 2025, President Donald J. Trump and Australian Prime Minister Anthony Albanese signed at the White House the "United States-Australia Framework for Securing of Supply in the Mining and Processing of Critical Minerals and Rare Earths" — a non-binding common-policy instrument committing both governments to provide at least USD 1 billion each in financing within six months (USD 3bn+ joint commitment against an USD 8.5bn project pipeline and a stated USD 53bn recoverable-resource pipeline). The framework establishes a US-Australia Critical Minerals Supply Security Response Group co-led by the US Secretary of Energy and the Australian Minister for Resources, mandates streamlined permitting for mining/separation/processing projects, and explicitly couples the US demand-side architecture (DPA Title III + Defense Logistics Agency stockpile) to Australia's Critical Minerals Strategic Reserve. Concurrent with signing, EXIM issued seven Letters of Interest totalling USD 2.2bn (unlocking up to USD 5bn) to Arafura Rare Earths, Northern Minerals, Graphinex, La Trobe Magnesium, VHM, RZ Resources, and Sunrise Energy Metals; the US Department of War separately committed to a 100 metric-ton-per-year advanced gallium refinery in Western Australia, and Australia took USD 200m concessional equity in the Alcoa-Sojitz Wagerup gallium project and USD 100m equity in the Arafura Nolans rare-earths project.
Argentina's Ministry of Economy issued Resolution 1553/2025 (Boletín Oficial, 14 October 2025) approving Andes Corporación Minera SA's ("ACM," the project vehicle for the McEwen Copper-led Los Azules deposit in San Juan province) adhesion to the Régimen de Incentivo para Grandes Inversiones (RIGI) under Law 27.742. The resolution locks in RIGI's 30-year tax, customs and FX stability package — including customs-duty exemption on capital-goods imports, a reduced corporate tax rate and phased FX-repatriation relief — for a declared total investment of USD 2.672 billion (USD 2.35bn of computable assets). ACM's accession dates to 25 September 2025; the company must complete 40% of the minimum qualifying investment within two years and reach the full minimum by 31 December 2027. This is the second mining project (after Rio Tinto's Rincón lithium plant) and the first copper project approved under RIGI, positioning Los Azules as the flagship test case for Argentina's bid to become a significant Western-aligned copper supplier outside Chile and Peru.
Zambia's Statutory Instrument No. 68 of 2025 under the Geological and Minerals Development Act 2022 establishes the first binding procurement-quota local-content regime in the Zambian copper-cobalt mining sector, entering into force 1 January 2026. Mining and mining-related companies must reserve a minimum 20% of their annual procurement budget for Zambian-owned or citizen-empowered suppliers of core mining goods and services, escalating to 25% in year two and 35% in year three, targeting 40% within five years. All non-core ancillary services (catering, security, haulage, cleaning, gardening) are reserved exclusively for Zambian-owned companies. The instrument operationalises the Minerals Regulation Commission created under the 2024 MRC Act and completes the ZM resource-nationalism statute stack.
Colombia's Ministerio de Minas y Energía filed Proyecto de Ley 282 de 2025 in Congress on 1 October 2025 — the first comprehensive reform of the national Mining Code since Ley 685/2001. The bill replaces the existing extractivist concession model with a state-directed planning framework that designates Strategic Mineral Areas (AME) for copper, lithium, and nickel under direct state control aligned with energy-transition goals. It establishes excluded zones (ZEM) and permitted zones (ZAM), restructures the concession and royalty regime to expand community and ethnic-peoples' participation rights, and redefines minerals as national public-interest assets rather than private-sector concession targets. As of May 2026 the bill was advancing through Senate committee deliberation.
Brazil's Ministry of Mines and Energy (MME) and the Serviço Geológico do Brasil (SGB) released the final report of the Plano Decenal de Pesquisa de Recursos Minerais (PlanGEO 2026-2035) on 24 September 2025. The plan defines 145 priority research areas selected through public consultation for ten years of focused geological mapping and mineral-resources research, prioritising ten commodities — rare earths, lithium, copper, nickel, manganese, graphite, tin, gold, phosphate, and potassium — covering the battery / magnets demand spectrum plus food-security inputs. The plan is enabled by Portaria Normativa nº 72/GM/MME of 13 March 2024 and operates on a 2026-2035 horizon, with a SGB/MME budget-and-staffing scenario proposing up to a 50% increase in execution team and a 100% expansion in annual financial investment.
Qatar Investment Authority (QIA), Qatar's sovereign wealth fund, announced on 2025-09-17 a US$500 million strategic private placement in TSX/NYSE-listed Ivanhoe Mines, subscribing for 57,516,666 common shares at C$12.00/share; the placement closed 2025-09-29, giving QIA approximately 4% of Ivanhoe's issued and outstanding shares. On 2025-11-21 the two parties announced a follow-on memorandum of understanding to collaborate on exploration, development and preferential financing of critical-minerals projects across Africa, including support for Ivanhoe's Western Forelands exploration programme in the DRC. Ivanhoe's principal assets are the Kamoa-Kakula copper complex (DRC) and the Platreef platinum-palladium-nickel project (South Africa).
On 14 September 2025 the Public Authority for Special Economic Zones and Free Zones (OPAZ) and the Salalah Free Zone signed a usufruct agreement with GFCL EV (SFZ) LLC — the Omani subsidiary of the Anox GFCL group — for the establishment of an OMR 188 million (~USD 488m headline / USD 216m initial) advanced battery-materials plant on a 370,000 m² site in the Dhofar Governorate. The facility will produce lithium iron phosphate cathode-active-material (LFP CAM), ammonium phosphate, iron salts, and carbon materials supporting up to 100 GWh of downstream battery production. The first phase (OMR 73m) is to be commissioned over 4–6 years. The signing is Oman's first downstream LFP-CAM operationalisation under Vision 2040 and lands against the parallel context of 26 upstream mining licences issued by the Ministry of Energy and Minerals (MEM) in 2024 covering chromite, copper, nickel, cobalt, laterite, gypsum, limestone, and construction materials across Dhofar, Al Wusta, North Al Sharqiyah, Al Batinah, and Al Dhahirah.
On 8 September 2025 at Prime Minister House in Islamabad, U.S. Strategic Metals (USSM, Missouri) signed a Memorandum of Understanding with Pakistan's Frontier Works Organization (FWO, Pakistan Army-affiliated and the country's largest miner of critical minerals) committing to an initial USD 500 million investment programme covering antimony, copper, gold, tungsten, and rare-earth elements, with an envisaged poly-metallic refinery inside Pakistan. Embassy Islamabad Acting Deputy Chief of Mission Zach Harkenrider attended the signing. The first shipment of rare earths and other critical minerals from Pakistan to the United States was dispatched on 2 October 2025, marking the operational start of the partnership. The instrument forms the strategic- minerals limb of a broader Pakistan–U.S. realignment paired with U.S. EXIM Bank's USD 1.25 billion financing commitment for the Reko Diq copper-gold project (announced 10 December 2025) — a single coherent bilateral package positioning Pakistan as a non- PRC source of refined critical minerals to the United States.