Loading…
Loading…
What they make, where they produce, the materials that matter — then what is coming, what it would do to the business, and the moves available. Sector: electronics. Company profile →
Inspur Electronic Information Industry Co., Ltd. (SZSE: 000977; commercially branded "Inspur Information") is the server/data-center hardware arm of the Inspur Group conglomerate, headquartered in Jinan, Shandong.
It designs and builds general-purpose x86 servers and AI/GPU-accelerated servers (built around third-party Nvidia GPUs and Intel/AMD CPUs) as a systems integrator/ODM rather than a chipmaker, and was the #2 global server vendor by shipment share in 2021 (Gartner) with a dominant share of China's AI-server market. Inspur Group was added to the US Commerce Department's Entity List in March 2023, and several Inspur Electronic Information Industry subsidiaries were added in March 2025 — relevant context for supply-chain risk since it restricts US-origin components reaching the company.
Verbatim from the dossier's “What they do” section — sources on the company profile.
No production footprint is recorded in its dossier yet — its HQ country is 🇨🇳 China, a registration fact, not a production or sales claim. We say so rather than guess.
Of everything in its products, we track the critical inputs — the materials whose supply is concentrated in few countries, policy-exposed, or hard to substitute — because those are the ones a single measure can move. Each carries its role in the product, quoted from the dossier's own exposure note.
Silver — trace additive (plating/contacts). Standard connector and contact plating in server-grade electronics.
Neodymium — trace additive, and unusually well-documented for this company. Inspur's own published user manual for the NF5260FM6 rack server discloses neodymium-content bands (by weight) for the third-party HDDs (Seagate, Western Digital) it integrates — reflecting the NdFeB magnets in each drive's voice-coil actuator. This is a small, per-drive quantity, not a bulk input, but it is a rare case of a primary-sour…
Copper — structural component. Used in PCB traces/wiring and in Inspur's own heatsink, cold-plate, and vapor-chamber cooling assemblies (documented in its G7 server cooling design materials).
Tin — trace additive (solder). Used in PCB assembly solder across essentially all electronics manufacturing; not Inspur-specific but effectively universal.
Silicon — structural component. Every server Inspur ships is built around purchased CPU/GPU/memory silicon (Intel, AMD, Nvidia, TSMC-fabbed); Inspur doesn't fab chips itself but is fully dependent on the silicon supply chain to build its systems.
Tantalum — structural component (capacitors). Tantalum capacitors are standard on server motherboards/power-delivery circuits for power quality and uptime; this is industry-standard practice for AI-server power delivery rather than an Inspur-specific disclosure.
Scope. The non-critical remainder of the bill of materials — structural steel, polymers, glass and the like — is not tracked here because it is not supply-constrained: this section covers the constrained inputs, which is where policy risk concentrates, not a full bill of materials.
The top 5 are ranked mechanically — what the instrument does (its transmission class: an export ban is not a reporting duty), × how close to law (stage-derived likelihood band, never a probability) × how much of your tracked bill of materials it touches. Each unfolds as a chain: trigger → what it hits → the response the instrument actually calls for. A measure touching a material you produce can be an opportunity, not a threat.
MW · stage passed-vote → high likelihood · touches neodymiumcoppertantalum · flagged 13 Aug 2026, 54d pending
President Peter Mutharika signed an executive order (dated 23 Oct 2025, effective 21 Oct 2025, announced at Sanjika Palace during a cabinet swearing-in) prohibiting the export of raw/unprocessed minerals extracted in Malawi — uranium, rare earth elements, niobium, graphite, tantalum, bauxite, coal, limestone, gemstones, heavy mineral sands, vermiculite, phosphate, rutile, gold, diamonds, copper and others — with an exemption for minerals processed/refined/value-added domestically per Malawian mining law. Announced alongside a suspension of new mining-licence issuance and a review of mining laws (2026/27 State of the Nation Address), plus a planned sovereign wealth fund. Stated rationale: local beneficiation, targeting up to USD 500m/yr once the Kasiya rutile/graphite deposit (Lilongwe) and Kangankunde rare-earth project (Balaka, Mkango Resources — Africa's prospective first new REE mine since 2017, targeting late-2026 production) are fully developed. Violators face fines/penalties under Malawian law. MW is currently the THINNEST country in the register (1 prior action) despite this breadth of minerals covered. Export-ban/beneficiation-mandate, same instrument class as Zimbabwe's SI 213/2022 raw-mineral bans and Guinea's 2026 gold-export ban already in the register.
source ↗Neodymium — trace additive, and unusually well-documented for this company. Inspur's own published user manual for the NF5260FM6 rack server discloses neodymium-content bands (by weight) for the third-party HDDs (Seagate, Western Digital) it integrates — reflecting the NdFeB magnets in each drive's voice-coil actuator. This is a small, per-drive quantity, not a bulk input, but it is a rare case of a primary-sour…
Copper — structural component. Used in PCB traces/wiring and in Inspur's own heatsink, cold-plate, and vapor-chamber cooling assemblies (documented in its G7 server cooling design materials).
Tantalum — structural component (capacitors). Tantalum capacitors are standard on server motherboards/power-delivery circuits for power quality and uptime; this is industry-standard practice for AI-server power delivery rather than an Inspur-specific disclosure.
The prohibition covers the raw/unprocessed form; material processed in Malawi stays exportable under the order's own exemption — so a Malawi processing route remains open alongside the alternatives below.
neodymium — Malawi holds no measurable share of world mining production in our table (2025 data), so this measure removes little measurable supply for you today; its weight is as precedent, not as a supply loss.
Supply outside 🇲🇼 MW: 🇨🇳 CN 72% · 🇺🇸 US 14% · 🇦🇺 AU 7.7% · 🇲🇲 MM 5.8% — shares renormalised after removing MW.
copper — Malawi holds no measurable share of world mining production in our table (2025 data), so this measure removes little measurable supply for you today; its weight is as precedent, not as a supply loss.
Supply outside 🇲🇼 MW: 🇨🇱 CL 26% · 🇨🇩 CD 16% · 🇵🇪 PE 13% · 🇨🇳 CN 8.8% — shares renormalised after removing MW.
Further materials are covered in section 6 below.
CD · stage passed-vote → high likelihood · touches copper · flagged 11 Aug 2026, 56d pending
On 29 June 2026 DRC's Vice-Prime Minister for the National Economy (Daniel Mukoko Samba), Minister of Mines (Louis Watum Kabamba) and Minister of Foreign Trade (Julien Paluku Kahongya) jointly signed an arrêté interministériel regulating the commercialisation, export and nomenclature of marketable mining products, which for the first time BANS the export of unprocessed copper and cobalt concentrates outright — replacing the entire framework adopted 4 August 2023. Mining-rights holders, processing entities and buying counters (comptoirs) may seek a ministerial derogation to export less-elaborated products for up to one year, assessed against national mining policy and the technical/economic constraints of each mineral. A new tax regime for economically significant mining byproducts is introduced with a 3-month transition period. This is broader and more foundational than the existing filed/queued DRC cobalt-specific instruments — it is a national concentrate EXPORT BAN (not a quota or hydroxide-specific measure) covering BOTH copper and cobalt, issued under joint Economy/Mines/Trade authority rather than ARECOMS sectoral rulemaking. DRC = priority-tier chokepoint (cobalt, copper, tantalum). Severity 4 expected (national ban, dual-metal, replaces a 3-year-old framework).
source ↗Copper — structural component. Used in PCB traces/wiring and in Inspur's own heatsink, cold-plate, and vapor-chamber cooling assemblies (documented in its G7 server cooling design materials).
The prohibition covers the raw/unprocessed form; material processed in DR Congo stays exportable under the order's own exemption — so a DR Congo processing route remains open alongside the alternatives below.
DR Congo supplies 14% of world copper mining — that share of your supply base is what this measure cuts off.
Supply outside 🇨🇩 CD: 🇨🇱 CL 31% · 🇵🇪 PE 16% · 🇨🇳 CN 10% · 🇷🇺 RU 7.7% — shares renormalised after removing CD.
CN · stage passed-vote → high likelihood · touches copper · flagged 25 Jul 2026, 73d pending
Effective 1 May 2026 China suspended exports of all ordinary industrial sulfuric acid — including the acid co-produced from copper/zinc smelting — with only electronic-grade high-purity acid still exportable under special approval; reporting attributes the measure to a joint Ministry of Commerce (MOFCOM) + General Administration of Customs (GACC) notice, expected to run through end-2026. Sulfuric acid is the indispensable leach/process input for copper hydrometallurgy (SX-EW), phosphate-fertilizer production, and battery-metal (nickel HPAL, lithium) processing, so a China export halt tightens a systemic upstream chokepoint hitting seaborne-acid buyers (Chile/Peru copper, Morocco/India phosphate, Indonesia nickel). This is a DISTINCT instrument from the already-filed 2025-12-12-china-ndrc-phosphate-fertilizer-export-suspension (finished-fertilizer export control) and 2026-03-31-russia-decree-350-sulphur-export-ban-extension (elemental sulphur, different country/product) — it controls the acid itself.
source ↗Copper — structural component. Used in PCB traces/wiring and in Inspur's own heatsink, cold-plate, and vapor-chamber cooling assemblies (documented in its G7 server cooling design materials).
China supplies 7.8% of world copper mining — that share of your supply base is what this measure cuts off.
Supply outside 🇨🇳 CN: 🇨🇱 CL 29% · 🇨🇩 CD 17% · 🇵🇪 PE 15% · 🇷🇺 RU 7.1% — shares renormalised after removing CN.
US · stage awaiting-signature → high likelihood · touches neodymium · flagged 15 Jun 2026, 113d pending
Framework agreed "in principle" between Trump and Xi following June 5, 2026 call and subsequent negotiations; Trump stated June 11, 2026 "Our deal with China is done, subject to final approval with President Xi and me" — China to supply "full magnets, and any necessary rare earths, up front" to US; if formally enacted, would suspend or ease China's April 2025 rare earth export licensing regime (filed 2025-04-04-china-mofcom-rare-earth-export-licensing) for US-bound shipments; China's Vice Commerce Minister Li Chenggang confirmed "in principle" framework consensus from the June 5 Trump-Xi call; tariff framework: US 55% / China 10%; China April 2025 rare earth controls (heavy/medium REEs, including Dy/Tb NdFeB magnets, SmCo magnets) remain formally active — no MOFCOM suspension announcement found as of June 15, 2026; the deal is political but not yet implemented as a formal regulation or bilateral MOU
source ↗Neodymium — trace additive, and unusually well-documented for this company. Inspur's own published user manual for the NF5260FM6 rack server discloses neodymium-content bands (by weight) for the third-party HDDs (Seagate, Western Digital) it integrates — reflecting the NdFeB magnets in each drive's voice-coil actuator. This is a small, per-drive quantity, not a bulk input, but it is a rare case of a primary-sour…
United States supplies 13% of world neodymium mining — that share of your supply base is what this measure cuts off.
Supply outside 🇺🇸 US: 🇨🇳 CN 83% · 🇦🇺 AU 8.9% · 🇲🇲 MM 6.7% · 🇹🇭 TH 1.4% — shares renormalised after removing US.
KZ · stage passed-vote → high likelihood · touches neodymiumcopper · flagged 29 Jun 2026, 99d pending
Senate-approved package of amendments to Kazakhstan's Code on Subsoil and Subsoil Use (No. 125-VI ZRK): (1) raises the mandatory local (domestic) content share in works and services from 50% to 70% during exploration and extraction of solid minerals INCLUDING URANIUM — a material new in-country-value obligation on the world's #1 uranium producer (Kazatomprom) and its JV partners (Cameco, Orano, CGN/CNNC, Uranium One); (2) digitises geological data and expands electronic auctions for granting subsoil-use rights; (3) grants strategic investors implementing large industrial/innovation projects (>14. 5M MCI) a priority right to explore and extract solid minerals. Re-prices the cost base and access regime for Kazakh uranium, copper, chromium and the country's emerging rare-earth deposits.
source ↗Neodymium — trace additive, and unusually well-documented for this company. Inspur's own published user manual for the NF5260FM6 rack server discloses neodymium-content bands (by weight) for the third-party HDDs (Seagate, Western Digital) it integrates — reflecting the NdFeB magnets in each drive's voice-coil actuator. This is a small, per-drive quantity, not a bulk input, but it is a rare case of a primary-sour…
Copper — structural component. Used in PCB traces/wiring and in Inspur's own heatsink, cold-plate, and vapor-chamber cooling assemblies (documented in its G7 server cooling design materials).
The filed text doesn't state this instrument's mechanism clearly enough to classify, so we don't guess a response — the measure text above is the read.
TZ Finance Bill establishes the Mineral Research Fund capitalised at 10% of gross mineral revenue (~TZS 141 billion/yr at 2025 collection levels); amends the Income Tax Act to formally recognise tax…
Royalty near-triples on Manono lithium project (Zijin Mining/La Cominière, DRC's first industrial lithium mine commissioning June 2026) and all DRC tantalum, niobium, tungsten, uranium, REE operators…
Minister of Finance, acting under s.
First federal statutory framework for critical and strategic minerals; establishes CMCE oversight committee, R$2B Mineral Activity Guarantee Fund (0.
Reduces maximum idle-concession period from 30 to 15 years (initial production deadline unchanged at 10 yr; penalty extension cut from 20 yr to just 5 yr); eliminates irrevocable legal status of mini…
New general mining law (distinct from PL-157 lithium/evaporites bill already in index): 20-year tax stability regime for mining projects; eliminates the 12.
The same Finance Bill 2026/27 already tabled (Parliament-passed 23 June 2026, effective 1 July 2026) inserts a NEW export levy of "10% of the FOB value of the cargo OR TZS 200 per kilogram, whichever…
Establishes the first legally binding "safe level" benchmark for EU strategic stocks of each of the 17 strategic raw materials listed in the CRMA Annex I; benchmarks used as reference by Member State…
Prohibits raw mineral exports unless 30% value-addition achieved domestically; affects Chinese mining companies (dominant in Nigerian critical minerals sector), Western offtake agreements, and all fo…
Revises 30 CFR Part 580 to streamline 10 provisions governing prospecting, leasing, and operations for hard minerals (manganese nodules, cobalt-rich crusts, seafloor massive sulfides) on the US Outer…
Mongolia's cabinet approved and submitted to the State Great Khural a draft amending ~40% of the 2006 Minerals Law: (i) cuts the maximum exploration-licence duration from 12 to 6 years while raising…
RESourceEU (COM(2025) 945, 3 Dec 2025) commits the Commission to establish a **European Critical Raw Materials Centre** in early 2026 with four functions: (a) generate **systemic market intelligence…
Mandates 15% free-carried interest for Uganda National Mining Company (UNMC) in all new mining licences; introduces mandatory mineral buying centres; tightens local-content and value-addition obligat…
Madagascar's Council of Ministers approved resumption of mining-permit issuance on ~28-29 Jan 2026, ending a moratorium in place since 2010 (imposed during a political transition amid mining-title sp…
Draft law amending Morocco's 2015 Mining Code (led by the Ministry of Energy Transition and Sustainable Development, Minister Leila Benali), with public consultations reported open since ~Feb 2025.
The Energy and Mineral Resources Ministry (ESDM) and Ministry of Finance announced May 11, 2026 that the implementation of higher tiered royalty rates under Government Regulation (PP) 19/2025 — cover…
Indonesia = ~20% of global refined tin exports (Bangka Belitung); a ban on refined-tin exports would force downstream solder/semiconductor-packaging manufacturing domestically; disrupts global electr…
Tanzania's Ministry of Minerals (Minister Anthony Mavunde) has FINALISED a Critical and Strategic Minerals Strategy that takes legal effect only once the Government formally approves and gazettes the…
Binding plurilateral trade agreement among like-minded partners (US, EU, Japan and FORGE coalition members) establishing coordinated trade measures for critical mineral supply chains — including bord…
Second wave of CRMA Art.
On 10 July 2026 the African Development Bank Group, with the African Union Commission, the AfCFTA Secretariat and UNECA, convened African ministers of mining/energy/industry in Abidjan for the "Minis…
At Myanmar military-government head Min Aung Hlaing's early-June-2026 New Delhi visit (his first India visit since the 2021 coup), critical minerals and rare earths featured explicitly on the formal…
Under the RESourceEU action plan (COM(2025) 945, adopted 3 Dec 2025 and already filed as 2025-12-03-eu-resourceeu-action-plan-com-2025-945), the European Commission committed to PROPOSE, by Q2 2026,…
All DRC mining operators (Glencore, CMOC, Ivanhoe Mines, Eurasian Resources Group, and 50+ others) must transfer 5% of share capital to Congolese employees by July 31, 2026 or face permit suspension;…
State-owned QMSD (Qatar Mining Company subsidiary), paused since Sudan's 2023 civil war, confirmed at a 13 May 2026 Port Sudan meeting between Sudan's Minister of Minerals Nour al-Daim Taha and Qatar…
Saudi sovereign mining vehicle Manara Minerals (PIF + Ma'aden JV) is in advanced negotiations to acquire a 15-20% equity stake (deal value ~USD 1.
Saudi state mining-investment vehicle Manara Minerals (the PIF/Ma'aden JV) is negotiating to buy a 10–20% stake in the Reko Diq copper-gold project (Balochistan, Pakistan) for ~$500M–$1bn, acquiring…
Saudi sovereign mining vehicle Manara Minerals (PIF + Ma'aden JV) is in negotiation to buy a 10-20% stake (deal value ~USD 500m-1bn) in the Reko Diq copper-gold project in Balochistan, Pakistan — one…
Ministry of Mines issued operational guidelines for the Mining Sector Reforms component under Scheme for Special Assistance to States for Capital Investment (SASCI) FY2026-27, with total ₹5,000 crore…
Full replacement of the Mining Act 1992 with sweeping new statute: state acquires up to 30% equity in any new mining project (Kumul Minerals free-carry); special mining leases (SML) issued for initia…
5 of 101 filed an explicit in-force stage; the rest (flagged below) default from an absent stage: field, not a filed assertion. Each links to the register entry with its primary source.
⚠ Extraterritorial measure — switching supplier origin may not exit its scope.
China MOFCOM Announcement No. 1 [2026] — country-specific dual-use export controls on Japan claims reach over foreign-made goods (“extraterritorial”) — the rule follows the material, not the seller, so an alternative outside the issuer can still be captured if its products contain or are made with in-scope inputs. Verify each alternative's feedstock origin before treating it as an exit.
⚠ Extraterritorial measure — switching supplier origin may not exit its scope.
China State Council enacts unified Regulations on Export Control of Dual-Use Items claims reach over foreign-made goods (“extraterritorial”) — the rule follows the material, not the seller, so an alternative outside the issuer can still be captured if its products contain or are made with in-scope inputs. Verify each alternative's feedstock origin before treating it as an exit.
For a material it buys, a restriction tightens supply and raises input cost — a headwind. Scores are footprint-adjusted and buyer-relative (0–100, higher = more exposed).
Its sector (electronics) has no downstream edges in our supply-chain adjacency graph — no downstream signal in the register.
For each bought material: the ex-controller producers a procurement team can actually reach, from the alternatives map (derived 2026-10-06), viability-gated — each name carries its deployment status (with the verbatim dossier phrase it rests on), a capture check against the measure being escaped, and any contracted-capacity evidence. Deployable-now names sort first; a developer with zero tonnes is shown demoted, never dressed up as a switch you can make today. Tradability is inherited from the listing layer, never guessed.
+35 more tradable names, ranked below these by the same gate.
⚠ Extraterritorial measure — switching supplier origin may not exit its scope.
China MOFCOM Announcement No. 1 [2026] — country-specific dual-use export controls on Japan claims reach over foreign-made goods (“extraterritorial”) — the rule follows the material, not the seller, so an alternative outside the issuer can still be captured if its products contain or are made with in-scope inputs. Verify each alternative's feedstock origin before treating it as an exit.
+12 more tradable names, ranked below these by the same gate.
+56 more tradable names, ranked below these by the same gate.
+10 more tradable names, ranked below these by the same gate.
lib/policy-transmission.ts): an export prohibition in the measure's name/text → supply restriction; a raw/unprocessed-export limit or local-processing mandate → beneficiation (form change, not unavailability); reporting/disclosure/due-diligence language → compliance obligation; tariff/trade-remedy language → import cost; subsidy/fast-track/relaxation language → support; investment-screening/M&A language → investment control. When the text carries no signal we fall back to the action-type default and label the chip inferred; when neither exists the card says so and derives no response — we never assert a class the evidence doesn't support.lib/iptm-material-country-production.ts; mining stage preferred, refining as fallback — the stage and source year are in each figure's hover text). Ex-issuer supply removes the ISSUING country and renormalises the remaining listed shares (so they sum to 100% of what's left) — alternatives to the country making the rule, never a default ex-China list. Where the issuer holds no measurable share, the card says so plainly instead of implying supply loss.lib/alternative-viability.ts): each named alternative carries a deployment status — operating / ramping / restarting / development / unknown — derived from word-boundary signal phrases in its own dossier (“operating since 1896”, “restarting the … mine”, “FID taken”), and the verbatim matched phrase is shown as the basis so the claim is auditable; a dossier with no signal stays unknown, never guessed. Any evidenced production date is quoted verbatim (“first production targeted H2 2029” → “no tonnes before 2029”) — we never synthesize one. A measure whose own text claims extraterritorial / re-export / de-minimis / foreign-direct-product / percentage-of-value scope triggers the origin-switching warning above the list: such a rule follows the material, not the seller, so a foreign-made alternative can still be captured. Same-issuer register actions targeting an alternative's country and material mark it may be captured, with the entries linked. “Capacity partly committed” lines quote the dossier verbatim — we hold no structured free-capacity numbers and never imply a utilisation figure.How MacroLens tracks this for you. The policy register files new measures daily and this page recomputes from it — the same chokepoints are monitored live on the watchlist and in the full register.